Procurement Summary
Country: Canada
Summary: Ez113-260653 - Phase 1 - Clinton Creek Quarry and Haul Program
Deadline: 15 May 2026
Posting Date: 02 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140556427
Document Ref. No.: WS5634453382
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The Work under this project will largely consist of site preparation and maintenance, drilling, blasting, quarrying, processing, testing, and hauling aggregate materials near Clinton Creek, Yukon. A Quarry site at KM 63 on HWY-9 (Top of the World Highway) will be used for aggregate production, and finished materials will need to be transported to Stockpile sites at Clinton Creek Mine, located approximately 100 km northwest from Dawson City, Yukon. Both the Quarry site and the Stockpile sites will need to be prepared which includes clearing, grubbing, stripping, rough grading and establishing required erosion and sedimentation controls. The Contractor will be responsible for the extraction, production, and transport of approximately 42, 000 tonnes of aggregate material, with particle sizes ranging from a D50 of 300 mm to 800 mm. Additional quantities of smaller aggregate material, may also be required.
Solicitation Type : ITQ - Invitation to Quote (Informal) Reference Number : WS5634453382-Doc5671643807 Location : Yukon Dates Publication : 2026/05/01 12:00:00 AM EDT Closing Date : 2026/05/15 02:00:00 PM EDT Contact Information : Camara, Oulematou (SPAC/PSPC) : [email protected] Description : The Work under this project will largely consist of site preparation and maintenance, drilling, blasting, quarrying, processing, testing, and hauling aggregate materials near Clinton Creek, Yukon. A Quarry site at KM 63 on HWY-9 (Top of the World Highway) will be used for aggregate production, and finished materials will need to be transported to Stockpile sites at Clinton Creek Mine, located approximately 100 km northwest from Dawson City, Yukon. Both the Quarry site and the Stockpile sites will need to be prepared which includes clearing, grubbing, stripping, rough grading and establishing required erosion and sedimentation controls. The Contractor will be responsible for the extraction, production, and transport of approximately 42, 000 tonnes of aggregate material, with particle sizes ranging from a D50 of 300 mm to 800 mm. Additional quantities of smaller aggregate material, may also be required.
Documents
Tender Notice