Procurement Summary
Country: Poland
Summary: Execution of Central Heating and Domestic Hot Water Installations, Including the Purchase and Installation of a Pellet Boiler and the Construction of a Chimney Installation (Exhaust Gas and Ventilation) in the Boiler Room in the Design and Build Mode
Deadline: 03 Jul 2026
Posting Date: 19 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143610604
Document Ref. No.: 2026/BZP 00297779/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45330000 - Plumbing and sanitary works
45300000 - Building installation work
45331100 - Central-heating installation work
45331000 - Heating, ventilation and air-conditioning installation work
71320000 - Engineering design services
45262522 - Masonry work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of the order is the performance of installation and construction works in the building of the community center in Kuczyn in order to adapt the rooms for the Active Seniors Club, which will include health-promoting, educational and cultural workshops/activities. Place investment: Rawa poviat, Cieldz commune, Kuczyzna district, plot no. 43 or. The building of the village community center in Kuczyn was built in the 1950s using traditional brick technology, using reinforced concrete, concrete and wooden elements. The building has two floors - ground floor and attic. The planned works will take place on the ground floor of the existing building. In order to adapt the rooms, the following are planned: I. In the scope of installation works, the deadline is up to 1 month from signing the contract: 1. Adaptation of an existing one water and sewage installations in the boiler room.2. Construction of a central heating and hot water supply system in the boiler room, including installation of a 30 KW pellet boiler and a control system, connection to the electrical installation and commissioning.3. Construction of DHW installation with insulated plastic pipes, fed from the designed pellet boiler with a utility water tank and connecting to the existing ...
Documents
Tender Notice