Procurement Summary
Country: Switzerland
Summary: Ev Tight Submission Piping
Deadline: 08 Oct 2026
Posting Date: 13 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 147152627
Document Ref. No.: 561579-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45231000 - Construction work for pipelines, communication and power lines
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Intermediate circuit line (PE line) between the seawater pumping station, the Bederstrasse energy center and the Hürlimann area District heating pipes (KMR) in the EV Enge network perimeter As part of this submission, the first part of the pipelines for EV Enge procured. The submission includes two lots that can be offered individually or together: ▪ Lot 1: DC link line (PE line) between the seawater pumping station, the Bederstrasse energy center and the Hürlimann area (see Figure 1). ▪ Lot 2: District heating pipes (KMR) in the EV Enge network perimeter (first part of the entire district heating pipe network shown in Figure 1). The EV Enge extends between Freigutstrasse in the north, Giesshübel train station / Üetlihof / Saalsportalle / Sihlcity in the West, Brunaustrasse in the south and the lakeshore in the east. The EV Enge supply perimeter is colored green in Figure 1. With this energy network, the Enge area is supplied with around 96% renewable energy from Lake Zurich. Both Pipe construction work according to Lot 1 involves assembly and welding work for the new intermediate circuit line, for the intermediate circuit from the seawater center to Anergy supply to the Bederstrasse energy center and the Hürlimann area. The Anergy lines are designed as PE-100-RC solid wall pipes. Not included in lot 1 are the anergy lines which are laid as flushing bores. These sections will at a later date together with the actual...
Document Type: Contract Notice Contract Type: works Doc Title: EV Enge Submission Rohrleitungen Dispatch Date: 2026-08-12 Publish Date: 2026-08-13 Submission Date: 2026-10-08
Documents
Tender Notice