Procurement Summary
Country: Czech Republic
Summary: Etb - Gas Turbine 18-19
Deadline: 03 Jul 2026
Posting Date: 22 Jun 2026
Other Information
Notice Type: Procurement Plan/GPN/PIN
TOT Ref.No.: 143763888
Document Ref. No.: 425579-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45251200 - Heating plant construction work
42110000 - Turbines and motors
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
ETB - Gas turbine 18-19 As part of the decarbonization of individual locations in the Czech Republic, the contracting authority is preparing the public contract "ETB - Gas turbine 18-19", the subject of which will be the construction of two gas turbines designated (PT 18 and PT 19) for the production of electricity and heat including accessories in the area of the Třebovice heating plant, while the comprehensiveness and complete functionality of the entire equipment (technology and construction parts) will be ensured, including all connections to the existing equipment of the power plant within the scope of the defined connection points. Order will be implemented in the closed premises of Elektrárny Třebovice, Ostrava in the Czech Republic. At this moment, the contracting authority assumes that the subject of performance will be the following: Delivery, assembly and commissioning of 2 gas turbines (PT 18 and PT 19) and their connection to of the steam-gas cycle Basic Design Documentation Detail Design Documentation As Build Documentation The gas turbines (PT 18 and PT 19) will be located in outdoor areas at the position of the existing electrostatic precipitator boilers K3 and K4). It is a space where we are limiting the existing technology and for this reason it must not exceed the size of 1 piece of gas turbine including service and service area 33m(d) x 17m(w). The technology will be located at least from a height of 212.60 m above sea level, which takes into account the height of the water level after floods in 2024 with a 40 cm reserve. The technology will be placed on an elevated reinforced concrete foundation. Combustion turbine flue gases must take into account the current pressure and temperature level of existing electric technologies...
Document Type: Prior Information Notice Contract Type: works Doc Title: ETB – Plynová turbína 18-19 Dispatch Date: 2026-06-19 Publish Date: 2026-06-22 Submission Date: 2026-07-03
Documents
Tender Notice