Procurement Summary
Country: Poland
Summary: Establishing a Repair Workshop in an Existing Warehouse - the So-Called Second Life with an Educational Path (Blue and Green Pszok Infrastructure)
Deadline: 09 Jul 2026
Posting Date: 23 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143843203
Document Ref. No.: 2026/BZP 00302788/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45210000 - Building construction work
45310000 - Electrical installation work
45311000 - Electrical wiring and fitting work
45332200 - Water plumbing work
45450000 - Other building completion work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
1. The subject of the order is the performance of construction works consisting in changing the use of storage rooms into second-life rooms and the construction of an educational path.2. The subject of the order includes the performance of the specified works construction: 2.1. Execution of internal construction works;2.2. Light construction of wall cladding;2.3. Construction of the ceiling;2.4. Execution of electrical works;2.5. Installation of electric heating and ventilation;2.6. Construction of an educational path and plantings;2.7. Purchase and delivery of necessary equipment;2.8. Performing other work necessary to complete the order;3. A detailed description and scope of works is included in the design documentation constituting Annex No. 9 to the SWZ. An auxiliary description of the subject of the order, due to the flat-rate nature of the order the nature of the remuneration, includes the Bill of Quantities, constituting Appendix No. 10 to SWZ.4. The required minimum quality warranty period for the completed subject of the contract is 24 months and will be determined in accordance with the contractor's offer (offer evaluation criterion). Guarantee covers liability for defects in the entire subject matter of the contract.5. The required warranty period for completed construction works is 60 months.6. Act...
Documents
Tender Notice