BRUCE POWER has floated a tender for Epc for Windfarm Repowering. The project location is Canada and the tender is closing on 15 Apr 2024. The tender notice number is EPC for WIndfarm, while the TOT Ref Number is 99064906. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Canada

Summary : Epc for Windfarm Repowering

Deadline : 15 Apr 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 99064906

Document Ref. No. : EPC for WIndfarm

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Purchaser : BRUCE POWER
Northwest, ON, CAN
Contact Information : Rosemarie Rankine, 519-386-0181, rosemarie.rankine@brucepower.com
Canada
Email :rosemarie.rankine@brucepower.com

Tender Details

Perform EPC for Windfarm Repowering and as otherwise required to complete the project (the “Services”). EPC Vendor to complete the engineering, procurement and construction activities for repowering up to 5 turbines at the Huron Wind site located adjacent to the Bruce Power Visitor's centre. This would include removal of existing blades & nacelle and replacing with newer technology (Vestas V110/V120 - 2-2.2MW). The existing turbines are Vestas V80 technology (1.8MW) constructed in 2002, which will reach end of life between Oct 2027 and March 2028. Foundations (upon satisfactory condition assessment) and Towers (upon satisfactory condition assessment) would be re-used. Engineering & Procurement activities would occur in the 2025-2026 timeframe, with construction activities for repowering occurring in the 2027-2028 timeframe
Solicitation Type : RFI - Request for Information (Informal)
Reference Number : 0000266668
Location : Canada, Ontario, Northwest
Description : Perform EPC for Windfarm Repowering and as otherwise required to complete the project (the “Services”). EPC Vendor to complete the engineering, procurement and construction activities for repowering up to 5 turbines at the Huron Wind site located adjacent to the Bruce Power Visitor's centre. This would include removal of existing blades & nacelle and replacing with newer technology (Vestas V110/V120 - 2-2.2MW). The existing turbines are Vestas V80 technology (1.8MW) constructed in 2002, which will reach end of life between Oct 2027 and March 2028. Foundations (upon satisfactory condition assessment) and Towers (upon satisfactory condition assessment) would be re-used. Engineering & Procurement activities would occur in the 2025-2026 timeframe, with construction activities for repowering occurring in the 2027-2028 timeframe

Documents

 Tender Notice