The BRUCE POWER has issued a Tender notice for the procurement of a Epc for Windfarm Repowering in the Canada. This Tender notice was published on 20 Mar 2024 and is scheduled to close on 15 Apr 2024, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 99064906, while the tender notice number is EPC for WIndfarm and Registering on the platform.

Expired Tender

Procurement Summary

Country: Canada

Summary: Epc for Windfarm Repowering

Deadline: 15 Apr 2024

Posting Date: 20 Mar 2024

Other Information

Notice Type: Tender

TOT Ref.No.: 99064906

Document Ref. No.: EPC for WIndfarm

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Perform EPC for Windfarm Repowering and as otherwise required to complete the project (the “Services”). EPC Vendor to complete the engineering, procurement and construction activities for repowering up to 5 turbines at the Huron Wind site located adjacent to the Bruce Power Visitor's centre. This would include removal of existing blades & nacelle and replacing with newer technology (Vestas V110/V120 - 2-2.2MW). The existing turbines are Vestas V80 technology (1.8MW) constructed in 2002, which will reach end of life between Oct 2027 and March 2028. Foundations (upon satisfactory condition assessment) and Towers (upon satisfactory condition assessment) would be re-used. Engineering & Procurement activities would occur in the 2025-2026 timeframe, with construction activities for repowering occurring in the 2027-2028 timeframe
Solicitation Type : RFI - Request for Information (Informal)
Reference Number : 0000266668
Location : Canada, Ontario, Northwest
Description : Perform EPC for Windfarm Repowering and as otherwise required to complete the project (the “Services”). EPC Vendor to complete the engineering, procurement and construction activities for repowering up to 5 turbines at the Huron Wind site located adjacent to the Bruce Power Visitor's centre. This would include removal of existing blades & nacelle and replacing with newer technology (Vestas V110/V120 - 2-2.2MW). The existing turbines are Vestas V80 technology (1.8MW) constructed in 2002, which will reach end of life between Oct 2027 and March 2028. Foundations (upon satisfactory condition assessment) and Towers (upon satisfactory condition assessment) would be re-used. Engineering & Procurement activities would occur in the 2025-2026 timeframe, with construction activities for repowering occurring in the 2027-2028 timeframe

Documents

 Tender Notice


GiZ Tenders India

Procurement Documents for Canada

Access a comprehensive library of standard procurement documents specific to Canada. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Canada

Explore Procurement Documents for Canada


Want To Bid in This Tender?

Get Local Agent Support in Canada and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?