Procurement Summary
Country: Poland
Summary: Ensuring the Proper Functioning of the Pump Station - Adaptation of Measurement Systems to the Requirements of Energa Operator at Pump Stations in the Area of Operation of Zz in Elbląg
Deadline: 06 Jul 2026
Posting Date: 01 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142414582
Document Ref. No.: 372359-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
51210000 - Installation services of measuring equipment
45310000 - Electrical installation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Ensuring the proper functioning of the pump station - Adaptation of measurement systems to the requirements of Energa Operator at pump stations in the area of operation of ZZ in Elbląg 1. The subject of the order is the provision of a service called “Ensuring proper functioning pump stations - Adaptation of measurement systems to the requirements of Energa Operator at pump stations in the area of operation of ZZ in Elbląg. The purpose of the task is to adapt the electricity measurement and billing systems installed at 10 pump stations located in the area of operation of ZZ Elbląg to the requirements of Energa Operator contained in the Instruction for Operation and Operation of the Distribution Network (IRiESD) p. II.4.7.1 and p. II.4.7.3. available on the website of OSD Energa Operator S.A. The reconstruction of measurement systems involves: on replacing semi-indirect systems with energy measurement on the LV side with indirect systems with energy measurement on the MV side, equipped with current and voltage transformers in all three phases. Scope of work: 1) Preparation and approval of documentation regarding the measurement system with the distribution system operator Energa Operator in accordance with the requirements of IRiESD. 2)Reconstruction of the measurement system based on the documentation agreed by the contractor with the distribution system operator. Any materials necessary to rebuild the measurement system and the costs of disconnecting the voltage for the duration of the system reconstruction on the contractor's side. 3) Carrying out control and measurement works along with measurement protocols. 4)Detail...
Document Type: Contract Notice Reference Number: G.CHAR.270.12.48.2026 Contract Type: services Authority Type: body-pl Doc Title: Ensuring the proper functioning of pump stations - Adaptation of measurement systems to the requirements of Energa Operator at pump stations in the area of operation of ZZ in Elbląg Dispatch Date: 2026-05-29 Publish Date: 2026-06-01 Submission Date: 2026-07-06
Documents
Tender Notice