The ZarzAe has issued a Tender notice for the procurement of a Engineering design services in the Poland. This Tender notice was published on 21 Jul 2015 and is scheduled to close on 31 Aug 2015, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 3310848, while the tender notice number is 254982-2015 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Poland

Summary: Engineering design services

Deadline: 31 Aug 2015

Posting Date: 21 Jul 2015

Other Information

Notice Type: Tender

TOT Ref.No.: 3310848

Document Ref. No.: 254982-2015

Financier: Self Financed

Purchaser Ownership: -

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Object of the contract
The contract is for service consisting of: elaboration of documentation for the project: Expansion of the provincial road No. 837 Sands: Żi?1/2łkiewka Village: Nielisz: Sitaniec the section Nielisz: Sitaniec from km 48 to km 64 000 3891 SCOPE DOKUMENTACJI1.1. Purpose opracowaniaPodstawowym objective is to: a) Develop a comprehensive multi-branch design documentationditto stage building and executive projects with geodetic and legal documents, decisions and all agreements and opinions, for a project entitled .: "Development of the provincial road No. 837 Sands: Żi?1/2łkiewka Village: Nielisz: Sitaniec the section Nielisz: Sitaniec from km 48 000 km 64 389 ", allowing to obtain a decision on whether to allow the implementation inRoad investment (decision ZRID) under the Act of 10 April 2003 ro special rules for the preparation and implementation of investments in the field of public roads (ie DZ. Laws 2014 pos. 40 with knife. d.) with obtaining the required opinion to the preparation of the application wnioskui and materials for application for the decyzji.b) Development of materials and achieve attachpancakes, necessary to the decision-prawne.c water permit) Development of materials necessary for the announcement of the tender for the execution of works required by the law on public procurement and subsequent implementation zadania.1.2. The composition commissioned DokumentacjiW part of the project documentation, provide the following stages and elements: 1.2.1. Building project(PB) road sector (including culverts), together with the opinions arrangements, the decisions necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] and the provisions of the Act [1] .1.2.2. Project Executive (PM) road sector (including culverts) together with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.3. Projekyou Construction (DB) construction industry: bridges and footbridges for pedestrians and bicycles along with opinions arrangements necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] and the provisions of the Act [1] .1.2.4. Project Executive (PM) construction industry: bridges and footbridges along with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.5. Construction project (PB) electrical industry (construction of road lighting), together with the opinions arrangements, the decisions necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] and the provisions of the Act [1] .1.2.6. Project Executive (PM) electric industry (construction of road lighting), together with the technical specificationperformance and acceptance of works (STWiORB) .1.2.7. Construction Projects (PB) and executive (PW) industries colliding with the planned new route, including, among others: the sanitary industry (water, gas, sewerage. Plumbing, etc.), energy, telecommunications, etc., Along with opinions arrangements necessary to obtain a decision the license for road investment projects underi?1/2of the Act [2] and the provisions of the Act [1] with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.8. The board collective utilities (all branches) .1.2.9. Project constant traffic organization approved by the relevant governing body movement, together with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.10. ProjectTemporary traffic organization, approved by the governance body motion for the following industries: road with culverts, construction: bridges / overpasses; Sanitary: gas, can. Plumbing, rain, water supply, energy, telecommunications, itd.1.2.11. A detailed inventory of woodlots with a plan felling (8 copies.). 1.2.12. Executive project of planting of greenery withWykonaniai receive technical specification of works (STWiORB) .1.2.13. Demolition project (if it is required) The project must perform a detailed inventory of buildings set for demolition, and demolition work to develop a program of development dock. techn. it possible to obtain the necessary license or filing demolitionand with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.14. Project Executive: Part estimates and przedmiarowa: a) Integrated investment estimate (taking into account all branches) drawn up by detailed with a base and STWiORB: items 1 to "n" with a summary of each branży.b) Integrated cost estimate: JWC) Scalons Bill of Quantities: JWD) The aggregate list of demolition material (in 3 copies.) 1.2.15. Geotechnical documentation in 4 copies.: For the diagnosis of soil-water conditions in order to determine geotechnical foundation conditions of the road according to [7.4], [7.3], [7.2], [7.1] .In addition test holes should be located in two sections for each 1 km road where the holes ZloKried will be on the axis, and one of its edges and in other sections of the characteristic (eg. the valley streams, expand, etc.). 1.2.16. Geological and engineering documentation in 4 copies.: For the diagnosis of soil-water conditions. For all objects for whom construction is required geological-engineering documentation, required to be developed dhe documents for the purposes of determining geotechnical conditions of their foundation: according to [7.4], [7.3], [7.2], [7.1] .1.2.17. All the necessary materials to a decision authorizing implementation of road investment (ZRID) and materials for temporary seizure of real estate, in particular: a. a set of documents and materials to the opinion, in accordance with Art. 11 b of the Acti?1/2[2], b. a set of documents and materials for application in accordance with Art. 11 d Act [2]: in this project including the statement referred to in Article 12 section 7 of the Act [1], current at the date of drafting. Construction project should meet the requirements of Art. 34 of the Act [1] and [1.1], c. request for a decision ZRID, d. Separate maps with the design division does notmobility, e. list of parcels included in the projected lane road (existing allocated for belt temporary seizure of real estate outside the projected existing lane road), est. to Wojewody.f decision. obtained from the owners / co-owners / Members / property managers, declaration of acceptance by them permission to enter their immovableerty for the construction or reconstruction exit, reconstruction of culverts, clearing or strengthening trenches, in the present study: Pattern statement will provide the Employer (unless the law at the time the documentation to the Employer will provide otherwise) .1.2.18. Conclusion of materials, according to article views. 11 b of the Act [2], to obtain a decision by ZRIDi?1/2Art. 11 d Act [2] plus 8 copies. Map referred to in Art. 11 d point. 1) the above. ustawy.1.2.19. Map for design purposes, scale 1: 1000 for the road and in the scale of 1: 500 for engineering objects in numerical version and 2-exam. the paper version checking on the basis of the borders of all parcels inside the area of the proposed road investment orand on the borders demarcation lines forming inwestycji.1.2.20 area. Opinion of the coordinating council agreed project documentation with graphic materials (ZUDP) on paper (min. 2 copies.) And electronic versions on the CD: 1 egz.1.2.21. Technical Map: operating for the expanded section of the provincial road prepared in accordance with [26] and dodatkowo map accordance with clause. 3.2.10. : On paper (5 copies.) And electronic versions on the motherboard: 2 egz.1.3. Laws acc. 2.52. FINDINGS TECHNICZNE2.1. The findings ogolne2.1.1. The scope of the proposed robot includes m. Al.: 1. Widening and strengthening of the existing road surface ... more poboczy.2 and strengthening. CORRECTION ™ oversize Ĺ, ukow.3. Expansion ™, bustruction, reconstruction or repair of objects of engineering in adapting to the road expansion project. Load objects according to [1.3] for class "A". .4. Construction, reconstruction or expansion bays autobusowych.5. The construction of bicycle paths along the entire length of the staging drogi.6. Construction, development or reconstruction of sidewalks and bicycle paths one - or bilateral terenis built-up areas and on rural roads construction of pedestrian-bicycle / tracks rowerowych.7. Expansion of the existing or construction of a new drainage system of the body surface road sections where there will be no surface water drainage, sewerage design deszczowej.8. Construction, development or redevelopment downhill on the plot Capeous for the road and construction: as far as possible within a lane: road maintenance, especially in areas earmarked for new buildings or provide access to half lying on the road, in order to reduce the number and frequency of zjazdow.9. The extension of intersections with roads of the same or another kategorii.10. Construction / reconstruction of road lighting Wymaganego the provisions of [1.2] .11. The reconstruction / protection to the extent necessary, foreign devices colliding with the planned new road and objects inżynierskimi.12. Development of green belt boundaries of the drogowego.13. The abolition of architectural barriers within the expanded section of the drogi.14. The construction of environmental protection facilities in accordance with the terms of Decidesji on environmental conditions, the decision of mayor of the municipality Nielisz ref. PG.7624 / 6/2012 dated 25.02.2015 r. (Attached to this OPZ) .15. Provision of communication services to all parcels located near road no 837.2.1.2. Contractor: 1. Development of a concept (in 2 copies. Hard copy and 1 copy. Version .pdf) taking into account in management ofremission lane road with drainage and support communication of plots adjacent to the provincial road, for which the Purchaser must be approved before the development of construction projects and wykonawczych.2. The preparation of the application of materials for application and obtaining opinion on the request for a decision on whether to allow the implementation of road investment in accordance withi?1/2Law [2], and in particular in accordance with Art. 11 d. Cited above. ustawy.3. Development operati?1/2w water law, and the preparation / obtain the necessary materials (together with any amendments and supplements at the stage of administrative proceedings by the competent authority) to obtain a decision by the Employer water permit for all devicesi?1/2water and discharge water to odbiornikow.Przekazanie the above. operati?1/2w along with the materials to the headquarters of the Purchaser on or before 30/05/2015 R4. Implementation of recognition whether the planned project is located in areas at particular risk of flooding, in case of confirmation of this state until the Contractor must prepare the necessary materials (including Ewentualnymi amendments and uzupeĹ, nieniami on the stage of the administrative procedure advances ™ by just competent authority) to obtain the Employer ... a Decision pursuant to Art. 88 l paragraph. 2 of the Act of 18 July 2001. Water Law (consolidated text Dz. U., 2012. 145 poĹşn. D.) Decision of the Director of the Regional Board of Water Management ... du ... more releasing from prohibitions referred to in arp. 88, paragraph l. 1 cited above. Act referred to areas of particular risk of powodzią.5. Obtaining any other approvals and reviews necessary for the development of PB PW and to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] .6. Obtaining a positive arrangement with the meeting of the coordination council (formerly opinion ZUDP) for the whole ofdcinka road covered zamowieniem.7. Obtain and provide to the Employer current digital map for design purposes in electronic and paper form at a scale of 1: 1000 and 1: 500 for engineering objects: bridges, culverts, overpasses to the extent necessary to develop the project with verification on the basis of the borders of all parcels inside the Focus Areafire the planned road investment and creating borders demarcation lines inwestycji.8 area. Execution of photographic documentation of all existing downhill and come to the gates separately for the left and right side of the road and passing it to the Employer at the date of submission of materials for arrangements referred to in section 2.4.4.5 of this OPZ. Eachi?1/2photograph must bear a serial number. On the basis of photographic documentation should be prepared tabular list of existing conventions and reach the gates. The list should include: a) side of the road, b) the serial number of the number of photos, c) mileage exit, d) the number of lots, e) the width of the exit / handle, f) radius of the arc wyokrąglającego, g) the material from whichthe ego is made at the border exit lane, h) the material used to make the exit lane road beyond the border, and) the purpose of such exit. exit an individual (to property or half), exit publiczny.9. Obtaining current industry technical terms from the owners or managers of equipment related to projected works: Conditions should be spent on ZDWin Lublin. They are subject to acceptance by the Technical Zamawiającego.Warunki and agree Industry (owners / managers of networks or devices) must be valid for at least 6 months from the date of the submission is Zamawiającemu.10. Make electronic copies (2 copies.) Developed the project documentation (in the editable and non-editable versions: .pdf), With the proviso that the electronic version must be identical to the version papierową.11. Analysis of communication service (in 2 copies.) All parcels located at the DW No. 837 on the cadastral map in the scale of 1: 1000 with opisem.12. It is recommended that designed components roads were located within the limits of the existing roadway. In exceptional cases, agreepreviously arranged with the Employer allowed to locate these elements beyond the borders of the existing runway drogowego.13. To obtain from its owners / co-owners / Members / property managers, oświadczeńo expression by them permission to enter their property for the construction or reconstruction of exit, reconstruction of culverts, clearing or strengthening trenches coveredch in this study: Pattern statement will provide the Employer (unless the law at the time the documentation to the Employer will provide otherwise) .14. When the receiver out of the way of rain water drainage ditches will constitute the drainage system Detailed, Contractor shall obtain approval in the form of a declaration through which property ownersthat goes w / the row and the property adjacent to exercise its renovation / remodeling and where these works will involve cutting down trees or shrubs, consent to their removal (permission for felling), unless the law at the time of transfer of the Employer Documentation They will provide inaczej.15. The contractor will provide Supervision during robot realysed on the basis of project documentation drawn up on the basis of this Agreement, and to the extent specified by law Construction Law (Art. 20 section 1 item 4 of the Act [1]) and in accordance with the arrangements set out in the Agreement. Author''s supervision will take place on the basis of option rights within the meaning of Art. 34 paragraph 5 of the Public Procurement Law. Order finishesCopyright nywania Supervision will depend on the needs Zamawiającego.Wykonawca is obliged to exercise the author''s supervision during the execution of works under the project documentation, expected date of completion of the investment: Up to 31 December 2023 R1) Supervision includes: a) Supervision nonresident (in the maximum quantity of 30 supervised): przygotowanie material to perform surveillance, time from design to construction of the office and back again, time to build in one day, settle matters related to the supervision of the powrocie.b) local author''s supervision (in the amount of maximum 30 supervised): Simple activities carried out at the premises of Design unit, if it follows the needs of the investment, for example, . an opinion, perform analysis or report writing which does not require the presence on the site etc.2) Supervision is exercised on the job Employer. Orders performing author''s supervision will depend on the needs of the Employer. That means that the Purchaser may opt out of all or part referred to in the Terms of Reference by the Employer maximum amountthe author''s supervision (right option) .3) Settlement following a serious ‡ ™ ™ will be based on submitted and implemented team stays on site or in the case of Supervisors Copyright topical after the receipt by the Purchaser ... dual subject to supervision, ie. the opinion, analysis, other writings niewymagaji?1/2 smokers presence ... you to budowie.4) ... cy Employer shall notify the Contractor ™ in writing about the planned launch ™ fiverealization of works covered by the project documentation at least two weeks before the planned date of commencement of work. Copyright Supervision Order execution will be at least 3 working days before the deadline set by the Contracting Authority execution supervision. Order execution Supervision will follow in writing. A written order will be simultaneously faxed nand the number indicated by the Contractor. At the same time the Purchaser has notified the Contractor of the order by phone. In special situations (eg. A disaster construction), demanding immediate presence of the author of the project in the conduct of the robot, a person who performs Supervision is required to perform author''s supervision on notice. In this case, the order executionCopyright and Supervision can take place by telephone with a later written confirmation of the zlecenia.16. Obtaining from each managers / owners of public utilities occurring in the existing and projected traffic lane, a written confirmation / arrangements about the lack of a collision with design ideas and agree on high-altitude location of the network Armojenia site, in accordance with the applicable standards. In the event of a collision existed way of its liquidation must be agreed with the Owner / Manager of the sieci.17. Copies of speeches technical conditions, arrangements shall be made to the Employer industry with appendices (appendices in electronic form: .pdf) .2.2. IstniejącyOdcinek state of the provincial road No.837 covered by the extension is located in the Lublin province, in the district of zamojskim.Początek of this section is located at km 48 030 in the town of Nielisz approx. 150 meters after the intersection with DP 837 DW No. 3203L. For further fragment the existing DW 837 runs through the village Bush, Złojec, Zarudzie, Białobrzegi, Bortatycze, High until the village Sitaniec, Where about 64 km 382, 00 intersects with the national road No. 17.Obiekty engineering within the existing provincial road No. 837 (the section covered by the development, according to records owned): 1. Drogowe.Przepust culverts at km 49 032średnica 60cm, length 9m, concrete, concrete pipe, culvert at km 49 356średnica 60cm, length 10m, concrete pipe, culvert at km 50 389śreDNIC 80cm, length 13m, reinforced concrete rurowyPrzepust at km 51 329średnica 100cm, length 18, 60m, reinforced concrete pipe, culvert at km 51 624, 63średnica 50cm, length 11, 30m, reinforced concrete, culvert at km 51 636, 21średnica 50cm, length 17, 20m, culvert at km 51 794średnica 80cm, length 13, 50m, reinforced concrete pipe, culvert at km 52 428średnica 80cm, length 12, 90m, reinforced concrete pipe, Przepustw km 52 763średnica 80cm, length 16, 20m, reinforced concrete pipe, culvert at km 53 194średnica 125cm, length 13, 40m, reinforced concrete pipe, culvert at km 53 962średnica 80cm, length 10, 60m, concrete pipe, culvert at km 54 782średnica 100cm, length 12, 80m, reinforced concrete pipe, culvert at km 55 222Średnica 80cm, length 13, 00m, reinforced concrete pipe, culvert at km 55 468średnica 80cm, długość 13, 80m, reinforced concrete pipe, culvert at km 55 515betonowy vaulted 100x125cm size, length 13, 20m, culvert at km 56 515betonowy vaulted 100x120cm size, length 14, 00m, culvert at km 57 200Betonowy vaulted 60x80cm, length 12, 50m, culvert at km 57 845przepust vaulted 200x180cm size, length 20, 00m, culvert at km 59 007są are two culverts on Wedednicy 80cm, length 10, 00m reinforced concrete pipe, culvert at km 59 402średnica 80cm, length of 9, 00m, reinforced concrete pipe, culvert at km 59 732średnica 80cm, length 10, 00m, reinforced concrete pipe, culvert at km 61 281średnica 60cm, length 11m, rurowyPrzepust concrete at km 63 110średnica 60cm, length 12m, concrete rurowy.Dokumentacja design must take into account the construction of new przepusComrade in culverts existing and possible construction of new culverts in places where you will need to complete the dewatering of the road surface with reference to the behavior of free movement of water between river intersected the body of the road (possible need to construct new culverts will be the result of a detailed analysis of runoff water pon the surrounding road catchments, made at the stage of preparation of technical documentation) .2. Bridges on the existing provincial road No. 837 (the section covered by the development, according to records possessed): In accordance with paragraph. 3.2.3. MostyRodzaje technical infrastructure at the waist existing and planned provincial road and its vicinity: a) Networksi?1/2sanitation (water supply network, sanitary drainage, gas) .b) energetyczne.c Network) teletechniczne.d Network) Network szerokopasmowa.Poza listed utilities networks with a fixed course and the property does not preclude the presence of other niezidentyfikowanych.Istniejące Field uwarunkowania.a) Conditions on land resulting from local planoin zoning or studies of conditions and directions of spatial dotyczy.b) Environmental conditions Environmental terenu.Warunki area should be adopted in accordance with the decision on environmental conditions issued by the mayor Nielisz ref. PG.7624 / 6/2012 of 02/25/2015 rc) Conditions arising from the protection of archaeological and conservation area.Wykonawca Get the current conditions for the Construction Design and Wykonawczego.W study should take into account the resulting conditions of the związane.d) The geological conditions terenu.Wykonawca obtain the necessary data for geological terms terenu.e) Conditions resulting from the planned construction or reconstruction of infrastructure drogowej.Potrzebne information and conditions resultingthe development of roadway and the area adjacent Contractor shall obtain in the performance of projektowej.2.3 documentation. Particular requirements for projektowania2.3.1. The objective of proper preparation of the offer: including the integration of all industry developments and detailed technical solutions: it is advisable to make your vision in the field, see a copy of the essential mapsactivity and where there is no doubt that in. Check with the network outcrops podziemnego.2.3.2 weapons. The Contractor shall obtain their own to ZDW industry in Lublin current technical conditions of the owners or managers of equipment related to the projected road works. They are subject to acceptance by the Zamawiającego.2.3.3. Technical requirements.1. Single carriageway Class Z, 2. In rural roads cross-section track, 3. The width of the roadway 7.0 m (2x3, 5 m), 4. Pavement bearing capacity of 115 kN / axle, 5. Shoulder width of 1.25 m reinforced stabilized aggregate broken mechanicznie.6. The contractor of the project will provide communication service to each plot, wherein: a) Congresses should be designed in the level of the pavement, i?1/2the link file to the existing gates and the width of the vehicles benefiting from the conventions, but no more than is apparent from i?1/2 78 and 79 [1.2] and the length from the edge of the road to the border of the roadway, where :: any convention both individual and public, should be examined in terms of altitude and location in the plan, should provide ZGOthe bottom of the precept, access to the property .: when, despite the accepted maximum longitudinal downward by the requirements of [1.2], the length of the meeting will be to go beyond the border the roadway, the design should anticipate the embankment on the property of which is being designed to exit, and if necessary, reconstruction of the fence / gate. For such reunionsto be represented graphically and descriptive customized solution. In other cases, if the length of the exit will be located within the lane, downhill skiing in the table provided for each convention separately, ordinates its solutions altitude in characteristic points of the axis of exit .: conventions should be perpendicular to the edge of the road in frons belt drogowego.b) Congresses individual for property design with a width of paved minutes. 4.0 m, unless the existing gate or exit has a smaller width, but not less than 3.0 month) Congresses public internal roads (municipal roads do not have a vested klasyi number) design with a width of min. 5.0 m with rays wyokrąglającymi min. 6.0i?1/2m: other parameters require approval Zamawiającego.d) Public Congresses (outside exits on internal roads) design with a width of paved minutes. 4.0 mi appropriate turn radii adapted to the nature of działalności.e) Congresses to half design with a width of paved minutes. 4.0 mi appropriate turn radii enabling wjazd machines rolniczych.f) Alpine Constructions :: reunions individual to the property (up land): concrete blocks from the edge of the road to the border lane road, continue on link file to an existing terrain with mechanically stabilized aggregate, unless the condition is different from the existing hard surface ( eg. concrete blocks, the aisles. bitumen), which should play / yarnełożyć in agreement with the property owner that leads to the exit and the Employer, : public gatherings on internal roads: Bitumen aisles, : public gatherings (outside exits on internal roads): concrete blocks from the edge of the road to the border lane road, further to the existing land link file mechanically stabilized aggregate, unless they can not realejącym is another hard surface (eg. cobble paved aisles. bitumen), which should play / postponed in agreement with the owner of the property which leads downhill and downhill to, : Employer half: the aisles. Bitumen from the edge of the road to the border of the roadway, further link file to an existing terrain with mechanically stabilized aggregate, unless in the standingsthat does not exist is another hard surface (eg. concrete cubes, aisles. bitumen), which should play / postponed in agreement with the owner of the property which leads downhill and Zamawiającym.7. The entire length of the extended section 837 CC bike paths should be designed by the naves. bitumen (in special cases, among others, due to the conditions gestoro territorial development, with the consent of the Employer, of concrete blocks bezfazowej), or in consultation with the Employer and the relevant municipalities, outside the built-up area (according to the design of a new permanent traffic arrangements described in this OPZ) to design a bike path with pedestrians or service roads of admission pedestrian and bicycle traffic. Location pathCompounds in uzgodnieniuz Zamawiającym.8. The built-up area (according to the design of a new permanent traffic arrangements described in this OPZ) in consultation with the Employer and the relevant municipalities, to design the construction, extension or reconstruction of sidewalks and duplex or in agreement with the Employer and the relevant municipalities to design bicycle paths involving pedestrians.9. Ensure the implementation of existing furtek.10 occur. The design of the roadway determined on the basis of: a. pavement deflection test method, b. an assessment of the ground, on the basis of documentation geotechnical investigations, c. evaluate the nature and quality materials and the usefulness of subsequent layers of the existing pavement structure, based on drilling road surfaces and body orathe assessment of the state of the surface by SOSN performed by the Contractor, d. category calculated move, based on the last measurement General, e. the provisions of [1.2], [1.3], [7.1], catalog redevelopment and rehabilitation of flexible pavements and semi KPRNPP-2013 (the development of Warsaw, August 2013) and other provisions in force on the submission is Zamawiającemu.11. DevelopmentsIA ... tie ‡ comprehensive, surface drainage of the road with the possible taking into account the construction ™ storm water drainage along with the discharge water outside lane, rownieĹĽ of culverts, to the receivers. Dehydration to design ‡ accordance with the norm ... PN-S-02204 automobile roads and the requirements of the decision to breakfast ... environmental conditions issued by the mayor Nielisz ref. PG.7624 / 6/2012 dated 02.25.2015 r. Dehydration way, the choice of diameter culverts, ditches, etc. performance. Hydrologicznymi.12 to confirm calculations. Storm water drainage design in accordance with the Water Law and the terms of the environmental decision (in the possession of the Employer) łączniez development of sampling water use and materials necessary to obtain the itemwolenia water permit for the execution of the objects belonging to the water facilities, including roadside ditches and developing materials necessary to obtain a permit for discharge of waste water into the environment of the entire projected lane road to the receivers. The technical project for the industry, will be an integral part of this ZamowienIA, without additional wynagrodzenia.13. Environmental protection equipment designed in accordance with the conditions set out in the decision on environmental conditions issued by the mayor Nielisz ref. PG.7624 / 6/2012 dated 25.02.2015 r. Projected grade line of the road surface adapted to the vertical alignment of the objects inżynierskich.14. Intersection with county and communal roads (posiadającymi class and number) designed to adapt to [1.2]. In justified cases any reduction in the width of lanes of traffic calming elements using ruchu.15. Adjustments to existing non-standard horizontal curves in complying with the requirements set out in [1.2] .16. Bus bays closed type of platforms (not as FOR INextension of inclusion in the traffic lane at the intersection) design in existing public transportation (in accordance with the approved project a permanent organization of movement: a project in the possession of the Employer), with the possibility of changing the location of bays at the request of Commons or residents of or after a detailed analysis of the designer, and after prior approval byZamawiającego.17. Predict the land for shelters using peronu.18 surface. The pavement structure when combined broaden the use geosyntetyki.19. At intersections with roads and other provincial constitute a major source of turning left (above 20% relation), use the lanes for vehicles turning left and sanctuaries for Pieszych, when a transition occurs for pieszych.20. Road lighting design required by Regulation [2] .21. At pedestrian crossings built-up areas apply sanctuaries for pieszych.W the absence of street lighting should be designed to azylach active and lighting pylons pedestrian crossings powered by solar panels / systems solPregnant. In addition to built-up areas not designed for pieszych.22 azyli. At intersections, bus bays and public meetings and individual contractor of the project is to ensure visibility conditions [1.2] NOTE: The above technical parameters should be verified with the participation of the Employer at the stage of development of the Project Construction. With the consent of the Employeri?1/2allowed to change the above. technicznych.2.4 requirements. Requirements for the exercise studies included zamowieniem2.4.1. The rules and conditions for the realization of the subject zamowienia2.4.1.1. Contractor is obliged to know and apply all the rules, guidelines and instructions related to the implementation of the procurement in the version in force for the duration of umowy.2.4.1.2. The Contractor shall provide author''s supervision during the works carried out on the basis of project documentation drawn up on the basis of this Agreement, and to the extent specified by law Construction Law (Art. 20 section 1 item 4 of the Act [1]), and in accordance with the arrangements set out in Umowie.2.4 .1.3. Documentation Contractor agrees to reproduce and publish thekumentacji in any form on the Internet and materials informacyjnych.2.4.2. Requirements for dokumentacji2.4.2.1. The Contractor undertakes to execution of the contract with due diligence in a manner consistent with applicable regulations and the principles of modern knowledge technicznej.2.4.2.2. Project documentation should be done in chainage force ini?1/2provincial road No 837 from a change if wystąpią.2.4.2.3. Projects for the construction / reconstruction of infrastructure related equipment and non-road (gas networks, energy, telecommunications, water supply, sewage, etc.) must absolutely contain the current technical conditions for the construction or remodeling (removal of collision). The Contractor isi?1/2responsible for updating the terms for the relevant industries. Technical conditions and arrangements Industry (owners / managers of networks or devices) must be valid for at najmniej6 months from the date of transmission of the Employer. Ww. conditions and arrangements constitute an integral part of the projects branżowych.Przy agreement with the observations documentation should be in the docktation take these into account and include a statement of their spełnieniu.2.4.2.4 Designer. Made of sector dossier is technically mutually coordinated and complete from the point of view of the objective which is to serve. Include checks will be required to confirm design solutions in the field arising from the provisions required opinions, agreements, consent and the defendantolenia the extent arising from recipes, as well as a list of studies and documentation that make up the complete object zamowienia.Dokumentacja will have the Contractor''s declaration referred to in Art. 20 of the Act [1], signed by the designers responsible for meeting these requirements, it has been performed in accordance with the contract, the applicable laws, rules knowsbetween technical and able to complete from the point of view of the objective which has służyć.2.4.2.5. The Contractor will join the Building Design copies of licenses designers and verification. In addition, outside the set of documentation must be submitted to the competent Chamber zaświadczeńz of Civil Engineers: certificates must be valid on the date of preparation and the submission is projektowej to Zamawiającego.2.4.2.6. Originals obtained documents, opinions, agreements, etc. Whose copies were included in the project documentation should be complete in a separate study and include a list of contents to pass the Purchaser within the time limit as the whole subject of the contract covered by this OPZ.2.4.2.7. The Contractor shall perform design studies in robei?1/2graphics, which meets the following wymagania.a) ensures readability, clarity and uniqueness of content, b) a part of descriptive and computational should be written on a computer, c) is consistent with the requirements of the relevant regulations, standards and guidelines, d) the format of drawing sheets will be limited to the minimum necessary and submitted to the A-4 (A-3 for Designers Organizeation Movement), e) individual elements of orders must be submitted in a separate folder with a permanent handle adapted to the size of the item. On the briefcase should put the task name and the name of the item in the middle of the folders should be shown a list of its contents (separate part of the environmental, geotechnical, geological, economic, technical), f) as the drawing will bei?1/2made clearly and legibly, g) drawings will be made according to the rules of technical drawing h) any drawing shall bear the metric, like the title pages and covers individual components to develop the project, before handing design projects to receive the Contractor shall submit to the Employer for approval the proposed list of folders, titlesof subsequent studies and general studies graphic design projektowych.2.4.2.8. The Contractor shall use methods to perform measurements and tests at inventories and calculation methods and computer software used for evaluation of the technical condition and design work complies with the requirements of the contract, provision Polish standards. Computer software should have theymagane law, licenses for use. The scope of your license for the use of computer programs must be consistent with the scope and the way you use the software provided by the Contractor to carry out studies projektowych.2.4.2.9. The contractor will be responsible for the protection and design projects for all the starting materials used and received in the trakof design work. The contractor will maintain consultancies and starting materials until the transfer of their Zamawiającemu.Wykonawca will hold for at least 10 years from the date of the final copy archive of all design projects wchodzącychw projektowej.2.4.3 the documentation. Contractors cooperation with ZamawiającymWykonaWCA will support the Employer in administrative proceedings in order to obtain the required decisions, agreements and opinii.Wykonawca will cooperate and assist the Contracting Authority in the conduct of any public consultation in the preparation of information materials and counseling merits and had to answer a question at the stage of obtainingi?1/2all administrative decisions (eg. ZRID, the decision of water permit, etc.) and on the stage of selection of the Contractor and the Engineer Kontraktu.Do robot Contractor shall: a) organization of and participation in meetings (held at his request or the request of the Employer) with representatives of local authorities, inhabitants of the lands on which the investment is located innymi stakeholders regarding possibly. public consultations, site visits and project presentations and other arrangements, to the extent and under the terms of legislation and guidelines applicable and implemented during the term of the contract; b) participate in the Technical Councils (organized at his own request or demand Employer) and other spotkaniach at the request of the Contracting Authority; c) preparing minutes of consideration various comments and proposals to the under development of design documentation received by the Contractor, the minutes of the public consultation and passing them on an ongoing basis Zamawiającemu.d) The Contractor will represent the Employer in dealing with local authorities at all levels in the arearesulting from the execution of the subject umowy.e) The Contractor will cooperate to the extent necessary to carry documentation with other Contractors working on behalf of Zamawiającego.f) The Contractor undertakes to ensure the confidentiality of all information received from the Purchaser in connection with the implementation of this zamowienia.g) Pages They will work contracti?1/2on matters of substance and formal which occur during the implementation of the orders. To this end, the Parties shall appoint its przedstawicieli.h) The Contractor is obliged to submit a comprehensive written explanation along with the additions previously developed documentation concerning. Queries asked documentation developed during the tender proceedings conductedch by ZDW in Lublin for the selection of contractors and contract engineer: within 3 working days from the day send a request by e-mail or pocztą.2.4.4. Pracy2.4.4.1 control of execution. Documentation during development and prior to transfer to the Purchaser should have positive opinions of the Technical Board ZDW in Lublinie.Na stage of develoDocumentation of the Contractor is obliged to agree with the Purchaser to-date design solutions adopted in particular concerning: a) how communications service real estate adjacent to the staging provincial road along with showing any possibility directions to them from other public roads, b) site plan with the geometry of the road, c ) methoddrainage and water discharge to the receiver, d) the objects of engineering design solutions, e) design solutions in the field of road intersections and inclusions side, f) surface structure, g) any tanks for rainwater itp.2.4.4.2. Projektowych.Dla work schedule to ensure the ability to monitor the progress of design work, the Contractor shallany is to develop a project work schedule and deliver it in paper (3 copies.) to the Contracting Party within 14 days of receipt of the signed bilateral Umowy.Zamawiający approve the schedule of design work, as long as it complies with the requirements of the Agreement within 14 days from the date of submission to the zatwierdzenia.Wykonawca an on-demandoveruse must immediately replenish / improvement submitted for approval to the work schedule projektowych.Harmonogram design work should include deadlines for the various line items under this OPZ, as well as: a) the timing of starting materials to obtain the proper realization of the objectorders, including obtaining maps for design purposes, b) the terms of trade of technical conditions of the owners / managers of public utilities and road managers, c) the deadlines for the submission to be agreed by the Employer design solutions listed in section 2.4.4.1. in particular development of geological documentation and geotechnical along with measurements pavement deflection and provide a reconciliation of the Purchaser of materials for pavement construction on or before 30/05/2016 rd) deadlines develop items specified in 4.2.1. : 4.2.5..Zatwierdzony schedule project work is an integral part of umowy.Zamawiający reserves the right to withdraw from the contract due to the fault of the Contractor in atevent that the delay in the implementation part of the subject of subsequent orders included in the approved schedule, exceed 30 days from the date indicated in this harmonogramie.2.4.4.3. PracWykonawca progress report is required to prepare monthly progress report design and deliver him to the headquarters of the Purchaser on paper to tell day 5each miesiąca.Do each report must be accompanied by a copy of all instances to obtain materials, data, technical terms, opinions and arrangements together with a copy obtained materials, data, technical terms, agreements and opinions for the month covered by the Raportem.2.4.4.4. The Contractor is obliged to obtain all the necessary opinions, agreements and checks projektu in particular trade agreements, arrangements coordinating councils (former opinion ZUDP), Regional Conservator, Regional Director of State Forests, WZMiUW in Lublin, offices of Towns and Municipalities, management / owners Drog, owners / management boards of network and urządzeń.2.4.4.5. Contractor is obliged to obtain in ZDW in Lublin: 1. Solutions projektowe at PB, and PW for objects of engineering, site plan expansion of the road: uzgodnienie.Do agreed site plan must be submitted and made photographic documentation drawn up a list of existing conventions and to come to furtek.2. The construction of roads, sections normal: uzgodnienie3. The project electrical industry: lighting, STWiORB, Cost estimates and takeoffs robot: akceptacja4. Prior to submitting documentation of individual elements of the Employer, the solutions adopted must be presented and justified its validity on the Technical Board ZDW in Lublin with the participation of local governments and other representatives, ie. Get the Council to agree Technicznej.5. Design solutions in terms of geometryi?1/2PB level should obtain a positive opinion of the managing body of the provincial road traffic (before obtaining site plan negotiated the extension of the road), and Projects Organization Permanent and Temporary Movement: approval of the organu.2.5. The provisions of związaneDokumentacja design is to meet the requirements set out herein and in the course orders FOR INpisach legal, standards, normatywach, catalogs, wytycznychi other, necessary for the implementation of the orders in force at the date of transfer of Zamawiającemu.Wykonawca documentation is required to know and follow all rules related to the implementation of the procurement in the version in force during the contract period, and in particular the following .i?1/2with poĹşniejszymi changes: the Act: [1] Law of 7 July 1994. Construction Law (uniform text. Laws of 2013. pos. 1409 poĹşn. d.) [1.1] ... The decree of the Minister of Transport, Building and Maritime of 25 April 2012. szczegoĹ, owego on the scope and form of construction project (Dz. U. of 2012. 462 of poĹşn. d.) [1.2] Ordinance of the Minister of Transp ...ortu and Maritime Economy of 2 March 1999 on technical conditions to be met ‡ public roads and their location (Dz. U. of 1999. No. 43 pos. 430 with poĹşn. d) [1.3] Ordinance of the Minister of Transport ... and Maritime Economy of 30 May 2000 on technical conditions to be met ‡ Road facilities and their location ENGINEERINGing (Dz. U. of 2000. No. 63 pos. 735 with later. d.) [1.4] Minister of Infrastructure Regulation of 23 June 2003. on information regarding safety and protection of health and safety plan and health (Journal . Laws of 2003. No. 120, item. 1126) [1.5] Ordinance of the Minister of Transport, Construction and Maritime Economy of 25 April 2012. inthe fixing of terms of geotechnical foundation of buildings (Dz. U., 2012. 463 with later. d.) [1.6] Ordinance of the Minister of Planning and Construction of 21 February 1995. on the type and scope of geodetic: cartographic and geodetic activities in force in construction (Dz. U. of 1995. No. 25 pos. 133 with later. amendments.) [1.7] ... The decree of the Minister of Infrastructure of 12 April 2002. On the technical conditions to be met ‡ buildings and their location (Dz. U. of 2002. No. 75, pos. 690 of poĹşn. D. ). [1.8] ... The decree of the Minister of Infrastructure dated 23 June 2003. on patterns: an application for permission to build ™, resort experience that he holds to FITAnia property for construction purposes and the decision on the construction permit (Dz. U. of 2003. No. 120, item. 1127 with later. d.) [1.9] The Minister of Environment dated 20 April 2007. on technical conditions should correspond to hydraulic structures and their location (Dz. U. No. 86, item. 579) [2] The Act of 10 April 2003. on special requesth preparation and realization of investments in the field of public road (consolidated text. Dz. U. 2014, item 40). [3] The Act of 21 March 1985. Public Roads (consolidated text Dz. U. of 2015. pos. 460 ) [4] Law of 20 June 1997. Traffic Law (consolidated text Dz. U. 2012. No. 1137 with later. d.)) [4.1] Ordinance of the Minister of Infrastructure of 23 inrześnia 2003. on the detailed conditions of road traffic management and to exercise supervision over the management (Dz. U. of 2003. No. 177, item. 1729) [4.2] Regulation Ministers of Infrastructure and Internal Affairs and Administration of dnia31 July 2002. on road signs and signals (Dz. U. of 2002. No. 170, item. 1393 with later. d.). [4.3] Council RegulatZeni Minister of Infrastructure of 22 June 2011. on szczegoĹ, owych technical terms for signs and road sygnaĹ, ow devices and equipment ... "security" State of traffic and terms of placing them on the road (Dz. U. of 2011. No. 133 pos. 772 of poĹşn. d.) [5] The Act of 27 April 2001. Law protection of the environment (consolidated text. Laws of 2013. Item 1232)[6] The Act of 18 July 2001. Water Law (Dz. U. of 2012. 145 jt with poĹşn. D.) [7] Act of 9 June 2011. Geological and Mining Law (Dz. U. 2011. No. 163, poz.981, with poĹşn. d.) [7.1] ... The decree of the Minister of Environment of 23.12.2011 r. on szczegoĹ, owych requirements ", which should match ‡ hydrological and geo-ENGINEERINGi?1/2(Dz. U. No 291, item. 1714 to 2011). [7.2] ... The decree of the Minister of Transport, Construction and Maritime Economy of 25 April 2012. On establishing geotechnical conditions of foundation of buildings (Dz. U. 2012. 463 126 1998., pos. 839 with poĹşn. d.) [7.3] ... The decree of the Minister of Environment of 19 December 2001. on geological work projectss (Dz. U. No 153, item. 1777 with later. d.) [7.4] Manual testing of subsoil road and bridge construction. Part 1 and 2. GDDP, Warsaw 1998. [8] The Act of 28 September 1991. On forests (ie Dz. U. of 2014 poz.1153 with later. D.) [9] The Act of March 27, 2003 r. on Spatial Planning and Development (Dz. U. of 2012 jt 647 with later. d.) [10] Lawon 17 May 1989. Geodetic and Cartographic Law (consolidated text. Laws of 2015. pos. 520) [10.1] Regulation of the Minister of Internal Affairs and Administration and the Minister of Agriculture and Food Economy of 14 April 1999. on demarcation real estate (Dz. U. of 1999. No. 45 pos. 453) [10.2] Regulation of the Minister of Regional Development and constructionpation of 29 March 2001. on the land and building (consolidated text Dz. U. of 2015. pos. 542) [10.3] ... Ordinance of the Minister of Internal Affairs ™ Affairs and Administration of 9 November 2011. in a standard on the technical execution of geodetic measurements situational and height networking sites and the development and transfer of these measurements to the countries'' statesof this geodetic and cartographic (Dz. U of 2011., No. 263, item. 1572). [10.4] ... Ordinance of the Minister of Regional Development and Construction of 2 April 2001. on geodetic records of public utilities and syndromes, o reconciliation project documentation (Dz. U. of 2001. No. 38 pos. 455) [10.5] ... The decree of the Minister of Regional Development and Budownictwa of 16 July 2001. on filing a surveying and mapping, recording and storage systems ... smokers copy of the security database, as well as the general terms TripAdvisor ™ for sharing these databases (Dz. U. of 2001. No. 78 pos. 837) [11] The Act of 21 August 1997. about the economy estate photos (consolidated text Dz. U. of 2014. pos. 518) [11.1] Regulation of the Council of Ministers of 7 December 2004. On the manner and procedure of carrying out real estate divisions (Dz. U. of 2004. No. 268, item. 2663) [12] Act of 19 October 1991. Of Management of Agricultural Property of the Treasury (consolidated text Dz. U. of 2012. jt 1187 with later. d.) [13] The Act of 13 October 1998. rulesprowadzające laws reforming public administration (Dz. U. of 1998. No. 133 pos. 872 with later. d.) [14] Law of 29 January 2004. Public Procurement Law (Dz. U. of 2013. 907, jt with later. d.) [14.1] Regulation of the Minister of Infrastructure of 18 May 2004. on determining methods and bases for preparation of the investment cost estimate, calculating planoimportant costs of design works and planned costs of works specify down in the functional and utilitarian (Dz. U. of 2004. No. 130, item. 1389) [14.2] ... the Ordinance of the Minister of Infrastructure of 2 September of 2004. in szczegoĹ, owego on the scope and form of design documentation, technical specifications performance and acceptance of works and progRAM functionality: uĹĽytkowego (Dz. U. of 2013. jt 1129) [15] Act of 15 December 2000. on ... self-governing professional roof architects, and urban planners inĹĽynierow construction (Dz. U. of 2013. 932 jt) [16] The Act of 23 April 1964. Civil Code (Journal of Laws of 1964. No. 16, pos. 93, poĹşn. d.) [17] The Act of 17 November 1964. Code of Civil Procedure advances ™ ( Acts. U. of 1964. No. 43 pos. 296 with later. d.) [18] Law of 14 June 1960. Code of Administrative Procedure (consolidated text Dz. U. of 2013. pos. 267 with later. d.) [19] Surveying Instructions and guidelines Lublin Provincial Office. [20] force at the time of preparing the documents applicable standards, guidelines and instructions. [21] The Act of 3 October 2008.the provision of information about the environment and its protection, public participation in environmental protection and environmental impact assessments (consolidated text. U.2013.1235 with later. d.). [22] Polish Standard PN-69 / M-02057 standard gauge railways. Extremely building. [23] The Act of 28 March 2003. On railway transport (consolidated text. Laws 2013 poz.1594 with later. Amendments.). [24] Ordinance No. 38 of the Minister of Infrastructure dated 26 October 2010. On the appointment of military load classification of bridges located in stretches of public roads (Official Journal of Minister of Infrastructure No. 13, pos. 37, 2010). [25] Order No. 11 of the Minister of Infrastructure of 4 February 2008. on the implementation of the technical requirementsno-defense in the preparation of road infrastructure for defense needs countries'' state. [26] ... The decree of the Minister of Infrastructure dated 16 February 2005. on the method of numbering and records of public roads, bridges, tunnels, culverts and ferries and redial register given to roads, bridge and tunelom.3 objects. FINDINGS FORMALNE3.1. Requirements ogolne1. Construction Projects (PB): this is the development of a detailed design, which depending on your needs are: clarifying all the final elements of the planned investment task, obtaining a decision ZRID according to [2] the preparation of implementing projects (PW) .Projekty Building (PB) should be developed in accordance with: [1], [1.1], [14.2], [2] andDecision on environmental conditions annexed to this OPZ.2. The current map for design purposes in 1: 1000 scale (1: 500 for engineering objects) in numerical form and hard copy, the Contractor shall obtain their own staraniem.3. Current and specified ranges collision foreign devices with the planned construction of a road, on the basis of the detailed TERMStechnical ow rebuilding or protection from their owners, the Contractor shall provide the Employer to zaopiniowania.4. The construction of storm water drainage design in accordance with the Water Law Act, including the development of sampling water permit for the execution of outlets storm water drainage to środowiska.5. Construction project must be accompanied by a photocopy of powers Projektanta and checking, and a statement designer and the verifier to draw up a construction project in accordance with the applicable regulations and principles of technical knowledge, and also include information on the safety and health protection. Documentation pages must be numbered including attachments and rysunkami.6. Construction Projects should be oprawione in a way that prevents zdekompletowanie.7. Estimates of przedmiarami the road construction industry and other sectors are to be merged into a single estimate and Takeoff and made in the same style for all industries in the form agreed with Zamawiającym.3.2 opracowania3.2.1 range of business drogowa3.2.1.1 budowlanyZakres development project includes the construction of 8 copies. Projecti?1/2road construction industry to the extent necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] and the provisions of the Act [1] .The project construction should include: 1. The descriptive part, including m. Al.: A) the basis for the development of the project, b) the object and scope of the study, c) types of planned works (construction, extension, .itp.) According to the Prawem construction, d) technical parameters of the proposed road: the design speed, axle load limits, the width of traffic lanes designed pavement construction, soil conditions and conditions wodne.e) status quo (width of carriageway, roadside, roadway, description and assessment of the existing pavement structure, types of land and water conditions, the justification for derogationsi?1/2from design norms), f) design solutions roads and culverts, g) construction of roads, h) the manner of dehydration and) forecasts of traffic flows and their structure, j) order Robotka) adopted width of the roadway, l) description of earthworks, m) Description Technological robot, n) safety equipment, o) work industry (solutions collision with weapons engineeringm, trees), p) buyouts and demolition, q) environmental protection equipment, r) historical objects, p) the seizure of land, t) specifications object characterizing the impact on the environment, on) a summary of the proposed elements, ie. the length of sidewalks, number of intersections, the number of bays, sewer length, number and type of objects inżynierskich.v) plan, and information on safetySheet and protection zdrowia.2. Part of the drawing, including: a) the indicative plan on a scale of 1:25 000 or 1:10 000 with: bearing the beginning and end of the course section of road covered by the project, given the planned location of the road in red and a network of other roads (marked other colors) together with the numbering of roads, b) Location plan in the scale of 1: 500 accounts preparedny current numerical map for design purposes with: marked in color boundaries of existing and projected lane road, the main route location points with their geodetic, existing and projected objects and devices on the way, as well as transverse roads at length about 20m from the border belt road routes provinceewodzkiej including their chainage, chainage taking into account the characteristic points, projected elements of the road as roadway, road maintenance, conventions (including their chainage), green belts, etc. and planned safety barriers with constant traffic organization project, with a beginning and chainage end chainage barriers and intersections, downhill and road maintenance, road axis along with the parameters arcs and transition curves, the road axis height coordinates along with the parameters arcs and transition curves, elevation height in the axis of the characteristic points (eg. kinks grade line), the list of benchmarks along with the address and the amount, location, cross-sections poprzecznych.c) longitudinal profile on a scale not mniLighter than 1: 100/1: 1000 drafted along the axis of the road planned by leveling a state of applying: ordinate planned, designed and slopes downward vertical alignment of the road with a poziomychi arcs of vertical, vertical alignment drainage facilities along with ordinates, the strengthening of ditches and slopes, locating the lowest point road longitudinal profile in cross Uliczadifferent in horizontal curves, for whom cant if applied at the same time there is a concave vertical arc, ordinate existing picket characteristic points of the road as the beginning, the end, the measure horizontal and vertical arcs, inlets, conventions, intersections, bus bays, etc., the length of straight lines and arcs, hektometrow, the position of the objects of engineering, elevations in punktach characteristic zjazdow.d axis) Sections within the normal road roadway 1:50 giving: an outline of the proposed surface of the roadway, curbs, sidewalks and lawns, the limit of the roadway, adopted downward transverse location and the reconstructed an existing wired network and equipment underground, the type and thickness of subsequent layers ofin the construction of roads with the length (mileage) the occurrence of a given section normal e) Collective map all existing branż.3. Arrangements and reviews, including: a) the protocol of the meeting of the coordinating council (formerly ZUDP): min. 2 originals, b) other arrangements arising from the minutes of meetings of the coordination, c) the opinions of the competent authorities of cities and municipalities into thges situational solutions, d) a reconciliation of other categories of road managers, project solutions in the field of road junctions relevant categories, e) a reconciliation of the owners of design solutions ditches, culverts, f) managers or owners of networks and technical infrastructure present in the study, other units such. interested WŁAwater-owner, technical infrastructure, itp.3.2.1.2 project WykonawczyProjekt executive, should complement and refine the construction project so that it can be established takeoff works, cost estimation, tender preparation by the contractor and the implementation of a robot. Executive project should include drawings made with highi?1/2accurate and sufficient detail needed for later execution of works. In addition, detailed design should include the results of design calculations and ilościowych.Opracowanie includes the execution in 6 copies. Executive branch road project consisting of: 1. Parts descriptive and computing with a set of necessary arrangements, Part opisowo-computing project should include: a) the basis for the development of the project, b) the object and scope of the study, c) the nature of the proposed work (construction, extension, etc.) according to the building, d) existing and projected traffic flows e) technical parameters road: the design speed, axle load limits, the width of traffic lanes designed structure makesurface the, ground conditions and water conditions, etc., f) a description of the existing condition (width of carriageway, roadside, roadway, description and assessment of the existing pavement structure, types of land and water conditions, reasons for deviations from the norms of design), and in particular cross sections of the existing development of land and existing roadway, the existingren: at least the width of the roadway, at distances min. 50m and in all the areas characteristic (including feet, crossings, etc.: The width necessary for the project), existing bituminous surface: at least the width of the crown of the road in all bends, the crown of the road and on the edges of the individual elements zagosgrant in the crown of the road (as well as the means and the edges of the existing ruts) at distances min. What 25m and in all the areas characteristic (including courses, facilities engineering, intersections, etc.), existing conventions, the existing fence and gate, the existing greenery in a lane, the accuracy of measurements surface / - 1cm, the results of the inventory should be finishestilizin to perform cross-sections and should not constitute a separate annex to the development of the design, structure and substrate of the existing surface used to calculate the gain nawierzchni.inwentaryzację construction and reconstruction of existing reference points and pillars, g) design solutions roads and culverts, h) construction-drillzchni (specify method of calculation and design), and) a list of the coordinates of points. main designed section, j) way dehydration, k) sequence of the robot, l) description of robot technology, m) safety equipment, n) environmental protection equipment, o) descriptions of topographic reference points (geodetic coordinates of points, diagram links point to the existing obiektow), p) calculations Earthworks (analytically), q) of Earthworks table, a table of weightings and plantowań, y) table millings, p) list of exits and junctions, culverts, t) a list of elements designed, ie. the length of sidewalks, number of intersections, the number of bays, sewer length, number and type of objects inżynierskich.u) construction industry in providing security collisionand weapons engineering and trees in the way indicated by their owners or users v) the surface of expropriation under the proposed elements drogi.2. The drawing part comprising: a) an indicative plan in a scale of 1:25 000 and 1:10 000 with marked: the beginning and the end and planned road course, given location of the planned road in the color sectionerwonym and a network of other roads (marked with different colors) together with the numbering of roads, b) a site plan, scale 1: 500 Connect to the current chainage of road network: location, route main points (coordinates) or topographical sketches with a link to the existing points of permanent land use area (also on the map of existing situational-highościowej), existing and projected objects and devices on the way, as well as transverse roads over a length of about 20 m from the border lane provincial road along with their chainage, chainage taking into account the characteristic points, projected elements of the road as roadways, driveways (together with the their chainage), green belts, etc., andochronnymiz barriers projected draft a permanent organization of traffic, giving chainage beginning and

Documents

 Tender Notice


Similar Tenders

GiZ Tenders India

Procurement Documents for Poland

Access a comprehensive library of standard procurement documents specific to Poland. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Poland

Explore Procurement Documents for Poland


Want To Bid in This Tender?

Get Local Agent Support in Poland and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?