Login
Register
Complete Your Profile
Change Password
Request a Password Reset
Download Documents
Download Documents
Get Help to Participate in This Tender
Our team will contact you shortly.
Your activation form is pending.
Please submit it to start receiving email alerts.
Submit NowChange Password
For better security, update the account password.
The ZarzAe has issued a Tender notice for the procurement of a Engineering design services in the Poland. This Tender notice was published on 07 Jul 2015 and is scheduled to close on 14 Aug 2015, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 3226663, while the tender notice number is 235730-2015 and Registering on the platform.
Procurement Summary
Country: Poland
Summary: Engineering design services
Deadline: 14 Aug 2015
Posting Date: 07 Jul 2015
Other Information
Notice Type: Tender
TOT Ref.No.: 3226663
Document Ref. No.: 235730-2015
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
1. The contract is for service consisting of: Developing a documentation for the project: "Development of the provincial road No. 835 Lublin: High: Biłgoraj: Sieniawa Przeworsk: Kańczuga: Dyni?1/2w: grabownica starzeńska on the section from km 10 to km 26 014 000" 1. SCOPE DOKUMENTACJI1.1. Purpose opracowaniaPodstawowym objective is to: a) Develop a multi-sectorcomprehensive design documentation stage building and executive projects with geodetic and legal documents, decisions and all agreements and opinions, for a project entitled .: "Development of the provincial road No. 835 Lublin: High: Biłgoraj: Sieniawa Przeworsk: Kańczuga: Dyni?1/2w: Grabownica Starzeńska on the section from km 10 to km 014 26 000 "with budowąi expansion of engineering objects and the security or development of foreign devices colliding with the planned new road, allowing to obtain a decision on whether to allow the implementation of road investment (decision ZRID) under the Act of 10 April 2003r.o special rules for the preparation and implementation of investments in the area public roads (ieDZ. U. 2014 pos. 40) along with obtaining the required opinion on the request and preparation of materials for application and application for the decyzji.b) Development of materials and getting attachments necessary to issue a decision on the environmental uwarunkowaniach.c) Development of materials and attachments obtain necessary permission to issue a decision Water-prawne.d) OpFlares materials necessary to tender for the execution of works required by the law on public procurement and subsequent implementation zadania.1.2. The composition commissioned DokumentacjiW part of the project documentation, provide the following stages and elements: 1.2.1. Construction project (PB) road sector (including culverts), together with the opinions arrangementsniami necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] and the provisions of the Act [1] .1.2.2. Project Executive (PM) road sector (including culverts) together with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.3. Construction Projects (DB) construction industry: pedestrian and cycling bridge (ifi?1/2necessary) together with the opinions, the necessary arrangements ™ dnymi to a decision authorizing implementation ™ road investment in accordance with the law ... [2] and the provisions of the Act [1] .1.2.4. Project Executive (PM) construction industry: kĹ, adka pedestrians and cyclists (if you will be required ™) with technical specifications ... ... performance and acceptance of works (STWiORB) .1.2.5. The project Budopoured (PB), electronics industry (construction of road lighting), together with the opinions arrangements necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] and the provisions of the Act [1] .1.2.6. Project Executive (PM) electric industry (construction of road lighting), together with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.7. Construction Projects (PB) and executive (PW) industries colliding with the planned new route, including, among others: the sanitary industry (water, gas, etc.), energy, telecommunications, etc., Along with opinions arrangements necessary to obtain a decision not to permit the realization of investment road accordance with the Act [2] and the provisions of the Act [1] with specificitying the technical performance and acceptance of works (STWiORB) .1.2.8. The board collective utilities (all branches) .1.2.9. Project constant traffic organization approved by the relevant governing body movement, together with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.10. Project temporary traffic organization, approved by the authorityi?1/2Managing movement should do for all industries: road, sanitary: gas, Kan. Plumbing, : water supply, electricity, telecommunications, itd.1.2.11. A detailed inventory of woodlots with a plan felling (8 copies.). 1.2.12. Executive project of planting greenery along with the technical specifications wykonaniai collection of works (STWiORB) .1.2.13. Designyburzeń (if it is required) The project must perform a detailed inventory of buildings set for demolition, and demolition work to develop a program of development dock. techn. it possible to obtain the necessary license or filing demolition with the technical specifications for execution and acceptance of works (STWiORB) .1.2.14. Project Executive: Part estimates and przedmiarowa: a) Integrated investment estimate (taking into account all branches) drawn up by detailed with a base and STWiORB: items 1 to "n" with a summary of each branży.b) Integrated cost estimate: JWC) Integrated Bill of Quantities : JWD) The aggregate list of demolition material (in 3 copies.) 1.2.15. DockGeotechnical umentacja in 4 copies.: for the diagnosis of soil-water conditions in order to determine geotechnical foundation conditions of the road according to [7.4], [7.3], [7.2], [7.1] .In addition test holes should be located in two sections for each 1 km of the road, where the openings will be located on the axis and one of its edges and at other points chateristic (eg. the valley streams, expand, etc.). 1.2.16. Geological and engineering documentation in 4 copies.: For the diagnosis of soil-water conditions. For all objects for whom construction is required geological-engineering documentation, required documentation must be developed for the purpose of determining geotechnical conditions of their foundation: according to[7.4], [7.3], [7.2], [7.1] .1.2.17. All the necessary materials to a decision authorizing implementation of road investment (ZRID) and materials for temporary seizure of real estate, in particular: a. a set of documents and materials to the opinion, in accordance with Art. 11b of the Act [2], b. a set of documents and materials for application in accordance with Art. 11d of the Act [2]: in thisi?1/2construction project together with the declaration, referred to in Article 12 section 7 of the Act [1], current at the date of drafting. Construction project should meet the requirements of Art. 34 of the Act [1] and [1.1], c. request for a decision ZRID, d. Separate maps with the design division of property, e. list of parcels included in the projected lane road (existingi?1/2i?1/2belt allocated for temporary seizure of real property located outside the existing lane road projected) est. to Wojewody.f decision. obtained from the owners / co-owners / Members / property managers, declaration of acceptance by them permission to enter their property for the construction or reconstruction of exit, reconstruction of culverts, cleaning or umocntings ditches, in the present study: Pattern statements provide the Purchaser (unless the law at the time the Documentation of the Purchaser shall provide otherwise) .1.2.18. The impact of the project on środowiskoOpracowanie materials and obtain attachments required for the issue by the competent authority environmental decisionwith the development of a report on the impact of the project on the environment (range of materials necessary to obtain a decision on environmental conditions must also meet the requirements set out in the Guidelines of Minister of Regional Development in the handling of the environmental impact assessment for projects co-financed from national or re-regional operational programs) .The developed by the Contractor of materials, attachments and an application for a decision on environmental conditions, the Purchaser wystąpiz propose this decyzję.1.2.19. Conclusion of materials, according to article views. 11b of the Act [2], to obtain a decision ZRID by Art. 11d of the Act [2] plus 8 copies. Maps in the scale of 1: 500 of whichj referred to in Art. 11d point 1) of the above. ustawy.1.2.20. Map for design purposes, scale 1: 500 in numerical version and 2-exam. the paper version checking on the basis of the borders of all parcels inside the area of the proposed road investment and creating borders demarcation lines inwestycji.1.2.21 area. Opinion of the meeting of the coordination arrangements dockumentacji design along with graphic materials (ZUDP) on paper (min. 2 copies.) and electronic versions on the CD: 1 egz.1.2.22. Technical Map: operating for the expanded section of the provincial road prepared in accordance with [26] and additionally map accordance with clause. 3.2.11. : On paper (5 copies.) And electronic versions on CD: 2 egz.1.3.i?1/2Laws acc. 2.52. FINDINGS TECHNICZNE2.1. The findings ogolne2.1.1. The scope of the proposed robot includes m. Al.: 1. Broadening and strengthening of the existing road surface and the strengthening of poboczy.2. Łukow.3 non-normative correction. Expansion, construction, reconstruction or repair of objects of engineering in adapting to the road expansion project. Load objectsi?1/2according to [1.3] for class "A". .4. Construction, reconstruction or expansion bays autobusowych.5. The construction of bicycle paths along the entire length of the staging drogi.6. Construction, development or reconstruction of sidewalks and bicycle paths one - or two-sided in urban areas, and rural roads construction of pedestrian and bicycle routes / tracks rowerowych.7. Expansion of existingpreset or build a new system of surface drainage of road sections where there will be no surface water drainage, sewerage design deszczowej.8. Construction, development or redevelopment downhill on the plot adjacent to the road and construction: as far as possible within a lane: road maintenance, especially on terenach intended for new buildings or provide access to the pol located on the road, in order to reduce the number and frequency of zjazdow.9. The extension of intersections with roads of the same or another kategorii.10. The construction site for the control of weighing pojazdow.11. Construction of the bridge cycling (if necessary) .12. Construction / reconstruction of road lighting required yarnepisami [1.2] .13. The reconstruction / protection to the extent necessary, foreign devices colliding with the planned new road and objects inżynierskimi.14. Development of green belt boundaries of the drogowego.15. The abolition of architectural barriers within the expanded section of the drogi.16. The construction of environmental protection facilities in accordance with the terms of the Decision on environronmental conditions (based on developed by the Contractor of materials, attachments, and a proposal for a decision on environmental conditions of the Purchaser apply for this decision) .17. Provision of communication services to all parcels located in the provincial road No. 835.18. Beginning planned section of situational and high altitude must be agreed fromDNIC with the Board Dear Mostow in Lublin, ul. Krochmalna 13J, 20-401 Lublin.Koniec planned section of road in terms of situational-altitude must bind to a project entitled .: "Development of the provincial road No. 835 Lublin: High: Biłgoraj: Sieniawa Przeworsk: Kańczuga: Dyni?1/2w: grabownica starzeńska on the section from km 26 000 to km 43 162 "developed bycompany: Office Design Service "DROGPROJEKT" Ltd. ul. Bursaki 19; 20-150 Lublin. Documentation is owned by Zamawiającego.2.1.2. Contractor: 1. Development of a concept (in 2 copies. Hard copy and 1 copy. Version .pdf) taking into account the development of the lane road with drainage and support communication of plots adjacent to the road voivodshipRepublic, for which the Purchaser must be approved before the development of construction projects and wykonawczych.2. The preparation of the application of materials for application and obtaining opinion on the request for a decision on whether to allow the implementation of road investment in accordance with the Act [2], and in particular in accordance with Art. 11d. the above. ustawy.3. Developing materials and achieve attachspeaker mentioned in Art. 74 of the Act [21], necessary for the application for a decision on the environmental conditions, ie. A) the information sheet of the project, b) certified by the competent authority copies of cadastral maps covering the projected area on which the project will be implemented and covering an area who will affect the project, c)i?1/2Annex graphic depicting a range of influence of the project, d) copies of land records covering the projected area on which the project will be implemented and covering an area przedsięwzięcie.Wykonawca who will be affected, regardless of the outcome of the dot. necessity or withdraw from the need to evaluate the troopsVanya projects on the environment, will develop a report on the impact of the project on środowisko.Ponadto The Contractor shall actively participated in the administrative proceedings, whose aim will be to issue an environmental decision by :: payment of any clarifications, additions, amendments to the prepared material attachments, : Participation in any meetings organized within the framework of the above. proceedings based administracyjnego.Na developed by the Contractor of materials, attachments and an application for a decision on environmental conditions, the Purchaser shall apply for the decyzję.4. Development operati?1/2w water law, and the preparation / obtain the necessary materials (including anyand amendments and uzupeĹ, nieniami on the stage of the administrative procedure advances ™ by just competent authority) to obtain the Employer ... a Decision water permit for all equipment ... devices "water and discharge water to odbiornikow.Przekazanie the above. operati?1/2w to the Employer ... dual headquarters within 30 days of submission of the Contractor''s decision to World considered environmentalrunkowaniach.5. Implementation of recognition whether the planned project is located in areas at particular risk of flooding, in case of confirmation of this state until the Contractor must prepare the necessary materials (together with any amendments and supplements at the stage of administrative proceedings by the competent authority) to obtain theEmployer ... a Decision pursuant to Art. 88l paragraph. 2 of the Act of 18 July 2001. Water Law (Codification Dz.U.2012.145 of poĹşn. D.) Decision of the Director of the Regional Board of Water Management ... du ... more releasing from prohibitions referred to in Art. 88l paragraph. 1 cited above. Act specifies down to areas of particular risks of flooding ... .6. Obtaining any other uzgodnieĹ "and review the necessaryędnych to develop PB PW and to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] .7. Obtaining a positive arrangement with the meeting of the coordination council (formerly opinion ZUDP) for the entire stretch of road covered by the zamowieniem.8. Obtain and provide to the Employer current digital map for design purposes in the form of electricalonicznej and paper on a scale of 1: 500 to the extent necessary to develop the project with verification on the basis of the borders of all parcels located within the area of the planned road investment and creating borders demarcation lines inwestycji.9 area. Execution of photographic documentation of all existing downhill and come to the gates separatelyfor the left and right side of the road and passing it to the Employer the date of submission of materials for arrangements referred to in section 2.4.4.5 of this OPZ. Each photo must bear a serial number. On the basis of photographic documentation should be prepared tabular list of existing conventions and reach the gates. The list should include: a) side of the road, b) The serial number of the number of photos, c) mileage exit, d) the number of lots, e) the width of the exit / handle, f) radius of the arc wyokrąglającego, g) the material used to make the exit lane boundary, h) the material they are made exit beyond the limit of the roadway, and) the purpose of such exit. exit an individual (to property or half), exit publiczny.10. Getting the current industry technical terms from the owners or managers of equipment related to projected works: Conditions should be spent on ZDW in Lublin. They are subject to acceptance by the Technical Zamawiającego.Warunki and agree Industry (owners / managers of networks or devices) must be valid for at least 6 months from the date of transferZamawiającemu.11 documentation. Make electronic copies (2 copies.) Developed the project documentation (in the editable and non-editable versions: .pdf), with the proviso that the electronic version must be identical to the paper version (eg together with the signatures of people who develop documentation) .12. Analysis of communication service (in 2 copies.) All actsk DW located at No. 835 on the cadastral map in the scale of 1: 1000 with opisem.13. It is recommended that designed components lane road development were located within the limits of the existing roadway. In exceptional cases, previously agreed with the Employer allowed to locate these elements beyond the borders of the existing runway drogowego.14. Obtaining of owners / co-owners / Members / property managers, oświadczeńo expressing their consent for entry to their property in order to build or rebuild the exit, reconstruction of culverts, clearing or strengthening trenches involved in this study: Pattern statements provide the Purchaser (unless rules law at the time of transferi?1/2Documentation of the Purchaser otherwise stated) .15. When the receiver out of the way of rain water drainage ditches will constitute the drainage system Detailed, Contractor shall obtain approval in the form of a statement of property owners through which passes w / in row and the property adjacent to exercise its renovation / remodeling and where they worki?1/2They will involve cutting down trees or shrubs, consent to their removal (permission for felling), unless the law at the time of transfer of the Purchaser constitute inaczej.16 Documentation. The Contractor shall provide author''s supervision during the works carried out on the basis of project documentation drawn up on the basis of this Agreement, and to the extent specified by mouthhoses Construction Law (Art. 20 section 1 item 4 of the Act [1]). Author''s supervision will take place on the basis of option rights within the meaning of Art. 34 paragraph 5 of the Public Procurement Law. Copyright Supervision Order execution will depend on the needs Zamawiającego.Wykonawca is obliged to exercise the author''s supervision during the execution of works covered by the documenta... ... tion projects, the expected date of completion "destination of the investment: 31 December 2020r.1) Supervision includes: a) Supervision nonresident (in quantity of the maximum 30 supervised): preparation of material for peĹ, nienia supervision, journey time from the office of design for the construction ™ and forth, time to build in one day, zaĹ, atwienie Relationship issues related to the supervisory ...I after powrocie.b) Supervision local (in the amount of maximum 30 supervised): Simple activities carried out at the headquarters of Unit Project, if it follows the needs of the investment, eg. an opinion, to perform the analysis or the development of writing which does not require the presence on the site like. 2) Supervision is exercised on the job Employer. Orders inykonywania''s supervision will depend on the needs of the Employer. That means that the Purchaser may opt out of all or part referred to in the Terms of Reference by the Employer maximum amount of the author''s supervision (right option) .3) Settlement will occur on the basis of commissioned and made the team stays on site or in the case of the author''s supervision miejscowegof the receipt by the Purchaser subject to supervision, ie. the opinion, analysis, other writings do not require the presence of at budowie.4) The Employer shall notify the Contractor in writing about the planned start of the works covered by the project documentation at least two weeks before the planned date of commencement of work. The commissioning of the author''s supervision will be at least nand 3 working days before the deadline set by the Contracting Authority execution supervision. The commissioning of supervision will follow in writing. A written order will be simultaneously faxed to the number indicated by the Contractor. At the same time the Purchaser has notified the Contractor of the order by phone. In special situations (eg. A disaster construction) requiring niezwłocznej presence of the author of the project in the carrying robot, a person who performs Supervision is required to perform author''s supervision on notice. In this case, the commissioning of the author''s supervision can take place by telephone with a later written confirmation of the zlecenia.17. Obtaining from each managers / Owner Network occurring Armojenia land in the existing and projected traffic lane, a written confirmation / arrangements about the lack of a collision with design ideas and agree on high-altitude location of utility networks in accordance with current standards. In the event of a collision existed way of its liquidation must be agreed with the Owner / Manager of the sieci.18. Copies of speeches aboutissue of technical terms, arrangements shall be made to the Employer industry with attachments (annexes in electronic form: .pdf) .2.2. IstniejącyOdcinek state of the provincial road No. 835 covered by the extension is located in the Lublin province, in the district of Lublin. The beginning of this section is in km approx. 10 014 at granicyz m. Lublin. For further fragment the existing DW 835 runs through Glusk district and Jabłonna. End of studies at km 26 000.Obiekty engineering within the existing provincial road No. 835 (the section covered by the development, according to records owned): 1. 10 572 km of dimensions. Φ 90cm and length. 10, 00m: reinforced concrete rurowy2. 11 376 km of dimensions. Φ 80cm and dł.11, 00m: reinforced concrete rurowy3. km 11 719 inwhite. Φ 90cm and length. 11, 00m: reinforced concrete rurowy4. 12 217 km of dimensions. Φ 80cm and length. 12, 00m: reinforced concrete rurowy5. 12 643 km of dimensions. Φ 90cm and dł.10, 00m: reinforced concrete rurowy6. km 13 173 of dimensions. Φ 80cm and dł.10, 00m: reinforced concrete rurowy7. 13 448 km of dimensions. Φ 100cm and dł.12, 00m: reinforced concrete rurowy8. 13 973 km of dimensions. Φ 80cm and dł.11, 00m: reinforced concrete rurowy9. 14 416 km of dimensions. Φ 100cm and dł.15, 00m:i?1/2rurowy10 reinforced concrete. 14 754 km of dimensions. Φ 80cm and length. 10, 00m: reinforced concrete rurowy11. 15 286 km of dimensions. Φ 150cm and length. 17, 00m: reinforced concrete rurowy12. 15 802 km of dimensions. Φ 80cm and length. 13, 50m: reinforced concrete rurowy13. 16 445 km of dimensions. Φ 2x80cm and length. 11, 00m: reinforced concrete rurowy14. 17 408 km of dimensions. Φ 2x80cm and length. 12, 00m: reinforced concrete rurowy15. 17 942 km of dimensions. Φ 80cm and length. 11, 00m: reinforced concreterurowy16. 18 556 km of dimensions. Φ 2x80cm and length. 15, 00m: reinforced concrete rurowy17. 19 025 km of dimensions. Φ 2x80cm and length. 12, 00m: reinforced concrete rurowy18. 19 588 km of dimensions. Φ 80cm and dł.19, 00m: reinforced concrete rurowy19. 19 967 km of dimensions. Φ 80cm and length. 12, 00m: reinforced concrete rurowy20. km 20 130 of dimensions. Φ 90cm and dł.12, 00m: reinforced concrete rurowy21. km 21 250 of dimensions. Φ 2x80cm and length. 12, 00m: reinforced concrete rurowy22. kmi?1/221 593 of size. Φ 2x100cm and length. 12, 00m: reinforced concrete rurowy23. 22 605 km of dimensions. Φ 2x100cm and length. 12, 00m: reinforced concrete rurowy24. 22 840 km of dimensions. Φ 2x 80cm and length. 12, 00m: reinforced concrete rurowy25. 23 561 km of dimensions. Φ 80cm and length. 12, 00m: reinforced concrete rurowy26. 23 891 km of dimensions. Φ 2x 100cm and dł.12, 00m: reinforced concrete rurowy27. 24 515 km of dimensions. Φ 2x100cm and length. 12, 00m: reinforced concrete rurowy28. km24 935 of wym.Φ2x 90cm and dł.12, 00m: reinforced concrete rurowy29. 25 364 km of dimensions. Φ 100cm and length. 12, 00m: rurowyDokumentacja reinforced concrete design must take into account the construction of new culverts in places culverts existing (according to the records and in places istn. Culverts buried, not exposed in the records held by ZDW) and the possible construction of new culverts in the cityjscach, where you will need to complete the dewatering of the road surface with reference to the behavior of free movement of water between river intersected the body of the road (possible need to construct new culverts will be the result of a detailed analysis of the surrounding water runoff catchments way, made at the stage of preparation of documentation technicic) .Założenia projektowe1) Load objects according to [1.3] for class "A" .Rodzaje technical infrastructure at the waist existing and planned provincial road and its vicinity: a) Network sanitation (water supply network, sewage. Plumbing, gas) .b ) Network energetyczne.c) teletechniczne.d Network) Network szerokopasmowa.Poza listed utilities networksa fixed course and the property does not preclude the presence of other niezidentyfikowanych.1. Existing Field uwarunkowania.a) Conditions relating to land due to local zoning plans or studies of conditions and directions of spatial dotyczy.b) Environmental conditions Environmental terenu.Warunki area should be adoptedAC accordance with issued by the competent authority decyzjąo environmental conditions. Preparation of the application and all material attachments necessary to achieve the above. the decision belongs to Wykonawcy.Warunki arising from the protection of archaeological and conservation of the area: The Contractor shall obtain the current conditions for the Construction Design and Wykonawczego.W study should UWZględnić obtained conditions of the związane.c) The geological conditions terenu.Wykonawca obtain the necessary data for geological terms terenu.d) Conditions resulting from the planned construction or reconstruction of infrastructure drogowej.Potrzebne information and conditions resulting from land-use lane road and the area adjacent Contractor shall obtain in the context of enforceable documentprojektowej.2.3 ation. Particular requirements for projektowania2.3.1. The objective of proper preparation of the offer: including the integration of all industry developments and detailed technical solutions: it is advisable to make your vision in the field, see a copy of the basic map and where there is no doubt that in. Check with outcrops network of underground weaponsgo.2.3.2. The Contractor shall obtain their own to ZDW in Lublin industry technical conditions of the owners or managers of equipment related to the projected road works. They are subject to acceptance by the Zamawiającego.2.3.3. Techniczne.1 requirements. Two-way single carriageway GP.2 class. Is a cross section of the road: a track in the area undevelopedm, street or połuliczny in urban areas, 3. The width of the lane 2x3, 5m, 4. Pavement bearing capacity of 115 kN / axle, 5. Shoulder width of 1.50 m reinforced stabilized aggregate broken mechanicznie.6. The contractor of the project will provide communication service to each plot, wherein: a) Congresses should be designed in the level of the pavement, the link file to the existing gatesgates and the width of the vehicles benefiting from the conventions, but no more than is apparent from i?1/2 78 and 79 [1.2] and the length from the edge of the road to the border of the roadway, where :: any convention both individual and public, should be examined in terms of altitude and location in the plan should provide in accordance with the precept, access to the estatei .: the case, despite the accepted maximum longitudinal downward by the requirements of [1.2], the length of the meeting will be to go beyond the border the roadway, the design should anticipate the embankment on the property of which is being designed to exit, and if necessary, reconstruction of the fence / gate . For such congresses should be presented in the form of graficzfull and descriptive customized solution. In other cases, if the length of the exit will be located within the lane, downhill skiing in the table provided for each convention separately, ordinates its solutions altitude in characteristic points of the axis of exit .: conventions should be perpendicular to the edge of the road in the border belt drogowego.b) Congresses priAlne to the property design with a width of paved minutes. 4, 0m unless the existing gate or exit has a smaller width, but not less than 3, 0m.c) Public Congresses internal roads (roads that do not have municipal given to the class and number) design with a width of min. 5, 0m with rays wyokrąglającymi min. 6.0m: other parameters require acceptanceand Zamawiającego.d) Public Congresses (outside exits on internal roads) design with a width of paved minutes. 4, 0m and the corresponding turn radii adapted to the nature of działalności.e) Congresses to half design with a width of paved minutes. 4, 0m and the corresponding turn radii for entry machines rolniczych.f) Constructions exito :: reunions individual to the property (up land): concrete blocks from the edge of the road to the border of the roadway, further link file to an existing terrain with mechanically stabilized aggregate, unless the state is different from the existing hard surface (eg. concrete blocks, the aisles. Bituminous), which should play / postponed in agreement with the owner, Mouchomości of which leads to the exit and the Employer, : public gatherings on internal roads: Bitumen aisles, : public gatherings (outside exits on internal roads): concrete blocks from the edge of the road to the border lane road, continue on link file to an existing terrain with mechanically stabilized aggregate, unless the state is different from an existing hard surface (e.g.. concrete cube, the aisles. Bituminous), which should play / postponed in agreement with the owner of the property which leads downhill and downhill to, : Employer half: the aisles. Bitumen from the edge of the road to the border of the roadway, further link file to an existing terrain with mechanically stabilized aggregate, unless the condition is different from the existing pavement tWard (eg. concrete cubes, aisles. bitumen), which should play / postponed in agreement with the owner of the property which leads downhill and Zamawiającym.7. The entire length of the extended section 835 CC bike path should be designed by the naves. bitumen (in special cases, inter alia, due to the terms of the administrators of utility networks, with the consent of Zamawiającego, of concrete blocks bezfazowej), or in consultation with the Employer and the relevant municipalities, outside the built-up area (according to the design of a new permanent traffic arrangements described in this OPZ) to design a bike path with pedestrians or service roads with pedestrian traffic allowed and rowerowego.8 . The built-up area (according to the design of a new permanent orgation movement described in this OPZ) in consultation with the Employer and the relevant municipalities, to design the construction, extension or reconstruction of paving one or bilateral or in agreement with the Employer and the relevant municipalities to design bicycle paths involving pieszych.9. Ensure that the reach of existing furtek.10. The design of the roadway determined in mistfive of: a. pavement deflection test method, b. an assessment of the ground, on the basis of documentation geotechnical investigations, c. evaluate the nature and quality materials and the usefulness of subsequent layers of the existing pavement structure, based on surface drilling and casing the road and pavement condition evaluation by SOSN performed by the Contractor, d. calculated category of motionBased on the last measurement General, e. the provisions of [1.2], [1.3], [7.1], catalog redevelopment and rehabilitation of flexible pavements and PoĹ, sztywnych KPRNPP-2013 (the development of Warsaw, August "2013) and other provisions obligatory ... chew ... which on the day of the submission is ... Newborn Employer. 11. Solution ... tie ‡ comprehensive, surface drainage of the road with the possible taking into account the construction k ™analizacji rain along with discharge water outside lane, also from culverts, to the receivers. Dehydration design in accordance with PN-S-02204 automobile roads and the requirements of the environmental decision. Dehydration way, the choice of diameter culverts, ditches, etc. performance. Hydrologicznymi.12 to confirm calculations. Storm water drainage projektować taking into account the requirements of the Water Act and in accordance with the conditions laid down in the decision on environmental conditions including the development of sampling water use and materials necessary to obtain a permit for the execution of the objects belonging to the water facilities, including roadside ditches and develop materials necessary for atgain permit for discharge of waste water into the environment of the entire projected lane road to the receivers. The technical project for the industry, will be an integral part of this contract, without additional wynagrodzenia.13. Environmental protection equipment designed in accordance with the conditions laid down in the decision on environmental determinantsniach, including the construction of ecological culverts and any other animal crossings will be required if the above-mentioned provisions. decyzji.14. The proposed grade line of the road surface adapted to the vertical alignment of the objects inżynierskich.15. Intersection with county and communal roads (having class and number) design in adapting to [1.2]. In justified przypadkach allows any reduction in the width of lanes of traffic calming elements using ruchu.16. Adjustments to existing non-standard horizontal curves in complying with the requirements set out in [1.2] .17. Bus bays closed type of platforms (not as an extension to include traffic lane at the intersection) design in existing ApertureFuelling public transport (in accordance with the approved project a permanent organization of movement: a project in the possession of the Employer), with the possibility of changing the location of bays at the request of Commons or residents of or after a detailed analysis of the designer, and after prior approval by Zamawiającego.18. Predict the land for shelters using peronu.19 surface. In Konstrukcji surface when combined broaden the use geosyntetyki.20. At intersections with roads and other provincial constitute a major source of turning left (above 20% relation), use the lanes for vehicles turning left and refuges for pedestrians, if there is a passage for pieszych.21. At pedestrian crossings in areas zabudoapply important refuges for pieszych.W the absence of street lighting should be designed to azylach active and lighting pylons pedestrian crossings powered by solar panels / solar systems. In addition to built-up areas not designed for pieszych.22 azyli. At intersections, bus bays and public meetings and individual, Contractori?1/2the project aims to provide visibility conditions [1.2] NOTE: The above technical parameters should be verified with the participation of the Employer at the stage of development of the Project Construction. With the consent of the Purchaser is permitted to change the above. technicznych.2.4 requirements. Requirements for the exercise studies included zamowieniem2.4.1. The rules and conditions for the realization of the objectzamowienia2.4.1.1. Contractor is obliged to know and apply all the rules, guidelines and instructions related to the implementation of the procurement in the version in force for the duration of umowy.2.4.1.2. The Contractor shall provide author''s supervision during the works carried out on the basis of project documentation drawn up on the basis of this agreement and for thee specified by the law Construction Law (Art. 20 section 1 item 4 of the Act [1]), and in accordance with the arrangements set out in Umowie.2.4.1.3. Documentation Contractor agrees to reproduce and publish documentation in any form on the Internet and materials informacyjnych.2.4.2. Requirements for dokumentacji2.4.2.1. The Contractor agrees to carry out similar itemotu agreement with due diligence in a manner consistent with applicable regulations and the principles of modern knowledge technicznej.2.4.2.2. Project documentation should be done in chainage force on the provincial road No. 835 and stating changes if they occur, with a reconciliation of the road manager for the city of Lublin, chainage and plan of situation and altitude in the granicy city of Lublin at the junction of the planned expansion of drogi.2.4.2.3. Projects for the construction / reconstruction of infrastructure related equipment and non-road (gas networks, energy, telecommunications, water supply, sewage, etc.) must absolutely contain the current technical conditions for the construction or remodeling (removal of collision). The Contractor is aboutdpowiedzialny for updating the terms for the relevant industries. Technical conditions and arrangements Industry (owners / managers of networks or devices) must be valid for at najmniej6 months from the date of transmission of the Employer. Ww. conditions and arrangements constitute an integral part of the projects branżowych.Przy agreement with the observations documentation must be in DOCUMEntacji take these into account and include a statement of their spełnieniu.2.4.2.4 Designer. Made of sector dossier is technically mutually coordinated and complete from the point of view of the objective which is to serve. Include checks will be required to confirm design solutions in the scope resulting from recipes, the opinion requested, arrangements, consents and letdown in the scope resulting from the recipes, as well as a list of studies and documentation that make up the complete object zamowienia.Dokumentacja will have the Contractor''s declaration referred to in Art. 20 of the Act [1], signed by the designers responsible for meeting these requirements, it has been performed in accordance with the contract, the applicable laws, rules knowledges technical and able to complete from the point of view of the objective which has służyć.2.4.2.5. The Contractor will join the Building Design copies of licenses designers and verification. Moreover, beyond the construction project must be submitted to the Purchaser set of certificates from the competent Chamber of Civil Engineers: certificates must be valid on the date of preparation and transmissionania Zamawiającego.2.4.2.6 project documentation. Originals obtained documents, opinions, agreements, etc. Whose copies were included in the project documentation should be complete in a separate study and include a list of contents to pass the Purchaser within the time limit as the whole subject of the contract covered by this OPZ.2.4.2.7. The Contractor shall perform Developania design in graphic design, which meets the following wymagania.a) ensures readability, clarity and uniqueness of content, b) a part of descriptive and computational should be written on a computer, c) complies with the requirements of the relevant regulations, standards and guidelines, d) sheet format Drawing will be limited to the minimum necessary and submitted to the A-4 (A-3 To draft traffic management), e) individual elements of orders must be submitted in a separate folder with a permanent handle adapted to the size of the item. On the briefcase should put the task name and the name of the item in the middle of the folders should be shown a list of its contents (separate part of the environmental, geotechnical, geological, economic, technical), f) Part of the drawing will be made clearly and legibly, g) drawings will be made according to the rules of technical drawing h) any drawing shall bear the metric, like the title pages and covers individual components to develop the project, before handing design projects to receive the Employer to the Contractor shall submit Proposed approvalany list of folders, titles of subsequent studies and general studies graphic design projektowych.2.4.2.8. The Contractor shall use methods to perform measurements and tests at inventories and calculation methods and computer software used for evaluation of the technical condition and design work complies with the requirements of the contract, provision Polish standards. Software computpassengers should have the legally required licenses for use. The scope of your license for the use of computer programs must be consistent with the scope and the way you use the software provided by the Contractor to carry out studies projektowych.2.4.2.9. The contractor will be responsible for the protection and design projects for all the starting materials PriUsed and received during the design work. The contractor will maintain consultancies and starting materials until the transfer of their Zamawiającemu.Wykonawca will hold for at least 10 years from the date of the final copy archive of all design projects included in the dossier projektowej.2.4.3. Cooperation executionawcy of ZamawiającymWykonawca will support the Employer in administrative proceedings in order to obtain the required decisions, agreements and opinii.Wykonawca will cooperate and assist the Contracting Authority in the conduct of any public consultation in the preparation of information materials and counseling substantive and gave answers to Zapycheap at the stage of obtaining all administrative decisions (eg. ZRID, the decision of water permit, etc.) and on the stage of selection of the Contractor and the Engineer Kontraktu.Do robot Contractor shall: a) organization of and participation in meetings (held at his request or the request of the Employer) with representatives of local authorities, residents whose lands on zlokalized is an investment and other stakeholders, concerning possibly. public consultations, site visits and project presentations and other arrangements, to the extent and under the terms of legislation and guidelines applicable and implemented during the term of the contract; b) participate in the Technical Councils (organized on his own request or demand from theamawiającego) and other meetings at the request of the Contracting Authority; c) preparing minutes of consideration various comments and proposals to the under development of design documentation received by the Contractor, the minutes of the public consultation and passing them on an ongoing basis Zamawiającemu.d) The Contractor will represent the Employer in contacts with the local authorities of allheavy levels in the scope resulting from the execution of the subject umowy.e) The Contractor will cooperate to the extent necessary to carry documentation with other Contractors working on behalf of Zamawiającego.f) The Contractor undertakes to ensure the confidentiality of all information received from the Purchaser in connection with the execution of orders .g) Pagesi?1/2the agreement will cooperate on matters of substance and formal which occur during the implementation of the orders. To this end, the Parties shall appoint its przedstawicieli.h) The Contractor is obliged to submit a comprehensive written explanation along with the additions previously developed documentation concerning. Queries asked of documentation developed in the course of proceedingsi?1/2tender conducted by ZDW in Lublin for the selection of contractors and contract engineer: within 3 working days from the day send a request by e-mail or pocztą.2.4.4. Pracy2.4.4.1 control of execution. Documentation during development and prior to transfer to the Purchaser should have positive opinions of the Technical Board ZDW in Ljubljanainie.Na stage of development documentation the Contractor shall, on the date agreed with the Employer adopted design solutions in particular concerning: a) how communications service real estate adjacent to the staging provincial road along with showing any possibility directions to them from other public roads, b) a site plan with geometrią road, c) the method of drainage and water discharge to the receiver, d) the objects of engineering design solutions, e) design solutions in the field of road intersections and inclusions side, f) surface structure, g) any tanks for rainwater itp.2.4.4.2. Projektowych.Dla work schedule to ensure the ability to monitor project progressof these, the Contractor shall develop a schedule of design work and deliver it in paper (3 copies.) to the Contracting Party within 14 days of receipt of the signed bilateral Umowy.Zamawiający approve the schedule of design work, as long as it complies with the requirements of the Contract, within 14 days from the date of submission to the zatwierdzenia.Wykonawca at the request of the Purchaser is obliged to promptly supplement / improve submitted for approval to the work schedule projektowych.Harmonogram design work should include deadlines for the various line items under this OPZ, as well as: a) the timing of starting materials to obtain the properrealization of the object orders, including obtaining maps for design purposes, b) the terms of trade of technical conditions of the owners / managers of public utilities and road managers c) deadlines for the submission to be agreed by the Employer design solutions listed in section 2.4.4.1. and in particular the development of geological and geo documentationTechnical together with measurements of surface deflection and provide a reconciliation of the Purchaser of materials for pavement construction on or before 30.05.2016r.d) deadlines for the development of items by umowy.Zatwierdzony schedule project work is an integral part of umowy.Zamawiający reserves the right to withdraw from the contract due to the fault Contractors in the case, i?1/2when the delay in the implementation part of the subject of subsequent orders included in the approved schedule, exceed 30 days from the date indicated in this harmonogramie.2.4.4.3. Prac2.4.4.4 progress report. Contractor is obliged to prepare a monthly report on the progress of project work and deliver it to the Contracting Party in paper form by the 5th dayeach miesiąca.Do each report must be accompanied by a copy of all instances to obtain materials, data, technical terms, opinions and arrangements together with a copy obtained materials, data, technical terms, agreements and opinions for the month covered by the Raportem.2.4.4.5. The Contractor is obliged to obtain all the necessary opinions, agreements and of proofs project in particular trade agreements, arrangements coordinating councils (former opinion ZUDP), Regional Conservator, Regional Director of State Forests, WZMiUW in Lublin, offices of Towns and Municipalities, management / owners Drog, owners / management boards of network and urządzeń.2.4.4.6 . Contractor is obliged to obtain in ZDW in Lublin: 1. Solutionand design at PB, and PW for objects of engineering, site plan expansion of the road: uzgodnienie.Do agreed site plan must be submitted and made photographic documentation drawn up a list of existing conventions and to come to furtek.2. The construction of roads, sections normal: uzgodnienie3. The project electrical industry: lighting, StateORB, estimates and takeoffs robot: akceptacja4. Prior to submitting documentation of individual elements of the Employer, the solutions adopted must be presented and justified its validity on the Technical Board ZDW in Lublin with the participation of local governments and other representatives, ie. Get the Council to agree Technicznej.5. Design solutions in terms of geometryi?1/2PB level should obtain a positive opinion of the managing body of the provincial road traffic (before obtaining site plan negotiated the extension of the road), and Projects Organization Permanent and Temporary Movement: approval of the organu.2.5. The provisions of związaneDokumentacja design is to meet the requirements set out in this description of the subject orders and wprzepisach legal, standards, normatywach, catalogs, wytycznychi other, necessary for the implementation of the orders in force at the date of transfer of Zamawiającemu.Wykonawca documentation is required to know and follow all rules related to the implementation of the procurement in the version in force during the contract period, in particular, listed belowAD, with poĹşniejszymi changes: the Act: [1] Law of 7 July 1994. Construction Law (Journal of Laws of 2013. Pos. 1409 poĹşn. D.) [1.1] ... The decree of the Minister of Transport, Construction and Maritime Economy of 25 April 2012. szczegoĹ, owego on the scope and form of construction project (Dz. U. of 2012. 462 of poĹşn. d.) [1.2] Ordinance of the Minister of Transpo ...RTU and Maritime Economy of 2 March 1999. on the technical conditions to be met by public roads and their location (Journal of Laws of 1999. No. 43 pos. 430 with later. d) [1.3] Ordinance of the Minister of Transport and Maritime Economy of 30 May 2000. on the technical conditions to be met by traffic engineering objects and their locationE (Journal of Laws of 2000. No. 63 pos. 735 with later. d.) [1.4] Minister of Infrastructure Regulation of 23 June 2003. the information on the safety and health protection and safety plan and health (Journal of Laws of 2003. No. 120, item. 1126) [1.5] Ordinance of the Minister of Transport, Construction and Maritime Economy of 25 April 2012. on ustalania terms of geotechnical foundation of buildings (OJ 2012.463 with later. d.) [1.6] Ordinance of the Minister of Planning and Construction of 21 February 1995. on the type and scope of geodetic: cartographic and geodetic activities valid in construction (Journal of Laws of 1995. No. 25 pos. 133z late. d.) [1.7] OrdinanceINTRODUCTION Minister of Infrastructure of 12 April 2002. on the technical conditions to be met by buildings and their location (Journal of Laws of 2002. No. 75, pos. 690 with later. d.). [1.8] Minister of Infrastructure Regulation of 23 June 2003. on patterns: an application for a building permit, a statement on the held to dispose of the propertyi?1/2for construction purposes, and a decision on the permit to build ™ (Journal of Laws of 2003. No. 120, item. 1127 with poĹşn. Chg.) [1.9] ... The decree of the Minister of Environment of 20 April 2007. on the technical conditions to be met ‡ hydraulic structures and their location (Dz.U.Nr 86, pos. 579) [2] The Act of 10 April 2003. with special rules for the preparation and impletion investments in the public road (consolidated text. OJ 2014 poz.40) [3] Act of 21 March 1985. Public Roads (Journal of Laws of 2015. pos. 460) [4] Law of 20 June 1997. Road Traffic Law (Journal of Laws of 2012. No. 1137 of poĹşn.zm.)) [4.1] ... The decree of the Minister of Infrastructure of 23 September of 2003. the detailsterms of cattle traffic management on roads and exercising supervision over the management (Journal of Laws of 2003. No. 177, item. 1729) [4.2] Regulation Ministers of Infrastructure and Internal Affairs and Administration of 31 July 2002. on road signs and signals (Journal of Laws of 2002. No. 170, item. 1393 with later. d.). [4.3] Ordinance of the Minister of Infrastructure ofJune 22, 2011. on the detailed technical conditions for traffic signs and signals and road traffic safety equipment and conditions of their placement on roads (Journal of Laws of 2011. No. 133 pos. 772 with later. d.) [5] The Act of 27 April 2001. Environmental Protection Law (Journal of Laws of 2013. Item 1232) [6] Law of 18 July 2001. The right to waterAD (Journal of Laws of 2012.145 jt with later. d.) [7] Act of 9 czerwca2011r. Geological and Mining Law (Journal of Laws of 2011 No. 163, poz.981, with later. D.) [7.1] Ordinance of the Minister of the Environment of 23.12.2011r. on the detailed requirements that should be met hydrological and geo-engineering (Dz.U.Nr 291, pos. 1714 of 2011). [7.2] Regulationcloseup of the Minister of Transport, Construction and Maritime Economy of 25 April 2012. on establishing geotechnical conditions of foundation of buildings (126 of 1998 Dz.U.2012.463., pos. 839 with later. d.) [7.3] The Minister of Environment dated 19 December 2001. on projects of geological work (Dz.U.Nr 153, pos. 1777 with later. d.) [7.4] Manual badishes subsoil road and bridge construction. Part 1 and 2. GDDP, Warsaw 1998. [8] The Act of 28 September 1991. Forest (Journal of Laws of 2014 poz.1153 of poźn.zm.) [9] The Act of 27 March 2003. Planning and Spatial Development (Journal of Laws of 2012.647 jt with later. d.) [10] The Act of 17 May 1989. Geodetic and Cartographic Law (Text of uniformYou OJ from 2015. Pos. 520 [10.1] ... the Ordinance of the Minister of Internal Affairs and Administration ™ and the Minister of Agriculture and Economy i?1/2Food holic of 14 April 1999. on the demarcation of the property you (Journal of Laws of 1999. No. 45 pos. 453) [10.2] ... The decree of the Minister of Regional Development and Construction of 29 March 2001. on the land and building (texti?1/2Dz.U. from 2015. poz.542) [10.3] ... the Ordinance of the Minister of Internal Affairs ™ Affairs and Administration of 9 November 2011. on technical standards situational execution of geodetic measurements and height networking sites and the development and transfer of these measurements to the state "geodetic-layered and cartographic (Dz. U of 2011., No. 263, item. 1572). [10.4] Regulation of the Minister of Regional Development and Construction of 2 April 2001. the geodetic records of public utilities, and assistants reconciliation project documentation (Journal of Laws of 2001 no. No. 38 poz.455) [10.5] Regulation of the Minister of Regional Development and Construction of 16 July 2001. on the notification of surveying and kartograficmetals, accounting systems and store backup copies the database, as well as the general terms of the sharing of databases (Journal of Laws of 2001 no. No. 78 pos. 837) [11] Act of 21 August 1997. for real estate management (Journal of Laws of 2014. pos. 518) [11.1] Council of Ministers of 7 December 2004. on the manner and proceduremaking real estate divisions (Journal of Laws of 2004. No. 268, item. 2663) [12] The Act of 19 October 1991. Management of Agricultural Property of the Treasury (Journal of Laws of 2012. jt 1187 with later. d.) [13] The Act of 13 October 1998. legislation introducing a bill reforming public administration (Journal of Laws of 1998. No. 133 pos. 872 with later.d.) [14] Law of 29 January 2004. Public Procurement Law (Journal of Laws of 2013. 907, jt with later. D.) [14.1] Regulation of the Minister of Infrastructure of 18 May 2004. on determining methods and bases for preparation of the investment cost estimate, calculating the planned costs of design works and planned costs of works specified in the funkcjonalno- utilitarian (Journal of Laws of 2004. No. 130, item. 1389) [14.2] ... the Ordinance of the Minister of Infrastructure of 2 September of 2004. szczegoĹ, owego on the scope and form of design documentation, technical specifications performance and acceptance of works and functional program: uĹĽytkowego (Journal of Laws of 2013. 1129 jt) [15] Act of 15 December 2000. of the self-governing ... dach professional architects, civil engineers and urban planners (Journal of Laws of 2013. 932 jt) [16] The Act of 23 April 1964. Civil Code (Journal of Laws of 1964. No. 16 pos. 93 with later. D.) [17] Law of 17 November 1964. The Code of Civil Procedure (Journal of Laws of 1964. No. 43 pos. 296 with later. D.) [18] Law of 14 June 1960. Code of Administrative Procedurei?1/2(Consolidated text: Journal of Laws of 2013. Pos. 267 with later. D.) [19] Surveying Instructions and guidelines Lublin Provincial Office. [20] The applicable at the time of preparing the documents applicable standards, guidelines and instructions. [21] The Act of October 3, 2008. the provision of information about the environment and its protection, public participation in environmental protection and assessments oddziaływania on the environment (Codification Dz.U.2013.1235 with later. d.). [22] Polish Standard PN-69 / M-02057 standard gauge railways. Extremely building. [23] The Act of 28 March 2003. On railway transport (Journal of Laws 2013 poz.1594 with later. D.). [24] Ordinance No. 38 of the Minister of Infrastructure of 26 October 2010. on the appointment of military clastion load of bridge objects located in stretches of public roads (Official Journal of Minister of Infrastructure No. 13 pos. 37 of 2010). [25] Ordinance No. 11 of the Minister of Infrastructure of 4 February 2008. on the implementation of the technical requirements of the defense in the preparation of road infrastructure for defense needs of the state. [26] Regulation of the Minister of Infrastructure of 16 February 2005. the method of numbering and records of public roads, bridges, tunnels, culverts and ferries and given to the register of roads, bridge and tunelom.3 objects. FINDINGS FORMALNE3.1. Ogolne1 requirements. Construction Projects (PB): this is the development of a detailed design, which depending on your needs are:clarifying all the final elements of the planned investment task, obtaining a decision ZRID according to [2] the preparation of implementing projects (PW) .Projekty Building (PB) should be developed in accordance with: [1], [1.1], [14.2], [2] and the decision on environmental conditions uwarunkowaniach.2. The current map for design purposes, scale 1: 500 in numerical formand paper, Contractor shall obtain their own efforts. Maps that will be transferred to the Purchaser within the time specified as for the whole zamowienia.3. Current and specified ranges collision foreign devices with the planned construction of a road, on the basis of the detailed technical conditions (conditions should be issued to the Investor, ie. ZDW in Lublin) on their reconstructionor protection from their owners, the Contractor shall provide the Employer to akceptacji.4. The construction of storm water drainage design in accordance with the Water Law Act, including the development of sampling water permit for the execution of outlets storm water drainage to środowiska.5. Construction project must be accompanied by a photocopy of allowances designer and the verifier, and oświadcZeni designer and the verifier to draw up a construction project in accordance with the applicable regulations and principles of technical knowledge, as well as accompanied with information on the safety and health protection. Documentation pages must be numbered consecutively, including attachments and rysunkami.6. Construction Projects should be framed in a way that preventszdekompletowanie.7. Estimates of przedmiarami the road construction industry and other sectors are to be merged into a single estimate and Takeoff (from position 1 to n-th) and made in the same style for all industries in the form agreed with the Zamawiającym.3.2 range environmental opracowania3.2.1 Part A. Decision on environmental investment uwarunkowaniachPrzedmiotowa on the basis of:: Art. 71 paragraph. 1 point 2 of the Act of 3 October 2008. the provision of information about the environment and its protection, public participation in environmental protection and environmental impact assessments (ie Dz. U. of 2013. pos. 1235 with later. d.), : i?1/2 3. 1 paragraph 60 and paragraph 2, point 2 of the Councils of Ministers of 9 November 2010. On projects likelysignificant effects on the environment (Dz. U. No 213, item. 1397 with later. d.) is eligible to projects which may potentially have a significant impact on the environment, for whom is required to obtain a decision on environmental uwarunkowaniach.W Consequently, the Contractor must: : preparation of an application for a decision on environmental conditions, together with the necessaryędnymi attachments, referred to in Art. 74 paragraph. 1 point 2, 3, 3a and 6 of the Act of 3 October 2008. the provision of information about the environment and its protection, public participation in environmental protection and environmental impact assessments (ie Dz. U. of 2013. pos. 1235 with later. d.), ie. :: project information sheet to the extent consistent with Articles .3 paragraph. 1 pkT.5 the above. Law, : certified by the competent authority copy of the cadastral map covering the projected area on which the project will be implemented and the extent to which the project will affect, : Annex graphic showing the extent of impact of the project, : extracts from the land register covering the projected area on which will be realizowane the project and covering an area who will be affected by the project (for all parcels covering the projected area on which the project will be implemented and the area, on who will be affected by the project) Moreover, the Contractor shall prepare a report on the impact of the project on the environment, within the scope specified in :: Art.i?1/266 of 3 October 2008. the provision of information about the environment and its protection, public participation in environmental protection and environmental impact assessments (consolidated text. Laws of 2013. pos. 1235 with later. d.) and: provision imposing an obligation to assess the environmental impact and defining the scope of the reporti?1/2about the impact of the project on the basis of środowisko.Na developed by the Contractor of materials, attachments and application Purchaser apply for a decision on the environmental uwarunkowaniach.B. Materials necessary to obtain a decision on environmental conditions communicated to the Purchaser: a) the information card of the project (5 copies. In paper 2i?1/2copies. in an electronic version on CD / DVD, editable files and .pdf), b) certified by the competent authority copy of the cadastral map (2 copies. in hard copy for each variant localization projects, listed in the application for a decision on the environmental conditions. including 1 exam. for the Purchaser), c) Annex graphic depicting a rangei?1/2impact of the project (5 copies. in paper 2 copies. in an electronic version on CD / DVD, editable files and .pdf), d) Excerpts from the land register (2egz. in paper form by the Investor preferred option mentioned in the application for decision on environmental conditions, including 1 copy. to the Employer), e) Report on the impact FOR INdsięwzięcia on the environment (5 copies. in paper 2 copies. in an electronic version on CD / DVD, editable files and .pdf) .3.2.2 Industry drogowa3.2.2.1 budowlanyZakres development project includes the construction of 8 copies. Project construction industry Road to the extent necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2]i?1/2and the provisions of the Act [1] .The project construction should include: 1. The descriptive part, including m. Al.: A) the basis for the development of the project, b) the object and scope of the study, c) types of planned works (construction, extension, .itp.) In accordance with the Construction Law, d) technical parameters of the proposed road: speed design, permissible load on the axle, the width of traffic lanes Projektoyour vital pavement construction, soil conditions and conditions wodne.e) status quo (width of carriageway, roadside, roadway, description and assessment of the existing pavement structure, types of land and water conditions, reasons for deviations from the norms of design), f) design solutions roads and culverts g) surface structure, h) the manner of dehydration and) forecasts of sweatmoving the chains and their structure, j) order Robotka) adopted width of the roadway, l) description of earthworks, m) technological description of the robot, n) safety equipment, o) work industry (solutions collision with weapons engineering, trees), p) buyouts and demolition, q) environmental protection equipment, r) historical objects, p) the seizure of land, t) specifications object charakteryzujące impact on the environment, on) a summary of the proposed elements, ie. the length of sidewalks, number of intersections, the number of bays, sewer length, number and type of objects inżynierskich.v) plan and information on the safety and security of zdrowia.2. Part of the drawing, including: a) the indicative plan in a scale of 1:25 000 and 1:10 000 fro
Documents
Similar Tenders
Poland
138198536
26 Mar 2026
Refer Document
Poland
138198469
27 Mar 2026
Refer Document
Poland
138198466
03 Apr 2026
Refer Document
Poland
138198344
07 Apr 2026
Refer Document
Poland
138198260
02 Apr 2026
Refer Document
Procurement Documents for Poland
Access a comprehensive library of standard procurement documents specific to Poland. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Poland
Want To Bid in This Tender?
Get Local Agent Support in Poland and 60 More Countries.
View Tenders By
Sign in with Google