The ZarzAe has issued a Tender notice for the procurement of a Engineering design services in the Poland. This Tender notice was published on 07 Jul 2015 and is scheduled to close on 12 Aug 2015, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 3226611, while the tender notice number is 235704-2015 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Poland

Summary: Engineering design services

Deadline: 12 Aug 2015

Posting Date: 07 Jul 2015

Other Information

Notice Type: Tender

TOT Ref.No.: 3226611

Document Ref. No.: 235704-2015

Financier: Self Financed

Purchaser Ownership: -

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Object of the contract
The contract is for service ... ca rely on: Developing a documentation for the project: i?1/2 € žRozbudowa the provincial road No. 815 Wisznice: Parczew: SiemieĹ ": Lubartow on the section from km 26 to km 662 61 565A € ťZakres documentation includes: a. Develop a comprehensive design documentation stage and the Executive Building Design for the project: i?1/2 € žRozbudowa roadojewodzkiej No. 815 Wisznice: Parczew: Siemień: Lubartow on the section from km 26 to km 61 662 565 "along with the construction and expansion of engineering objects and the security or development of foreign devices colliding with the planned new road and objects inżynierskimi.B. Developing materials and obtain attachments required for the release by the competent authority decides to environtal uwarunkowaniachC. Developing materials and obtain attachments required for the release by the competent authority decision-prawne.D water permit. Development and application of materials for application for a decision on whether to allow the implementation of road investment (ZRID) for the project: Expansion of the provincial road No. 815 Wisznice: Parczew: Siemień: Lubartow on segmentalto 662 from km 26 to km 61 565.1.1. Purpose opracowaniaPodstawowym objective is to: a) Develop comprehensive project documentation Wielobranżowe in the stage of building and implementing projects together with documentation ... ... geodetic and legal status, decisions and all agreements and opinions, for businessmen ™ take ™ body called .: i?1/2 € žRozbudowa provincial roads No. 815 Wisznice: Parczew: Siemień: Lubartow on the section from km 26 to km 61 662 565 "along with the construction and expansion of engineering objects and the security or development of foreign devices colliding with the planned new road and engineering structures, enabling to obtain a decision on whether to allow the implementation of road investment (decision ZRID) under the Act of 10 April 2003. for detailslnych rules for the preparation and realization of investments in the field of public road (OJ 2014 poz.240 tekst.jednolity) with obtaining the required opinion on the request and preparing the application and materiaĹ, ami the application for the decyzji.b) Develop the necessary ™ materiaĹ, ow coordinates and attachments ... switches to obtain Decision World uwarunkowaniach.c environmental) study isobtaining materials and attachments necessary to the decision-prawne.d water permit) Development of materials necessary for the announcement of the tender for the execution of works required by the law on public procurement and subsequent implementation zadania.1.2. The composition commissioned DokumentacjiW part of the project documentation will be developed following elements stadiai1.2.1. Construction project (PB) road sector (including culverts), together with the opinions arrangements necessary to obtain a decision to authorize a road investment projects in accordance with the Act [2] and the provisions of the Act [1] .1.2.2. Project Executive (PM) road sector (including culverts) together with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.3. Construction Projects (DB) construction industry: bridges and footbridges for pedestrians and bicycles along with opinions arrangements necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] and the provisions of the Act [1] .1.2.4. Implementing Projects (PW) construction industry: bridges and footbridges along with the technical specification of the workmanship and the receipt robot construction (STWiORB) .1.2.5. Construction project (PB) electrical industry (construction of road lighting), together with the opinions arrangements necessary to obtain a decision on whether to allow the implementation of road investment in accordance with the Act [2] and the provisions of the Act [1] .1.2.6. Project Executive (PM) electric industry (construction of road lighting), together with the Specification techniques-exclusive performance and acceptance of works (STWiORB) .1.2.7. Construction Projects (PB) and executive (PW) industries colliding with the planned new route, including, among others: the sanitary industry (water, gas, sewerage. Plumbing, etc.), energy, telecommunications, etc., Along with opinions arrangements necessary to obtain a decision to allow for the implementation of road investmentaccording to the Act [2] and the provisions of the Act [1] with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.8. The board cumulative utilities (all branches) .1.2.9. Project constant traffic organization approved by the relevant governing body movement, together with the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.10. Projekt temporary traffic organization, approved by the governance body motion for the following industries: road with culverts, construction: bridges / overpasses, sanitary gas, ch. sanitation, water supply, electricity, telecommunications, itd.1.2.11. A detailed inventory of woodlots with a plan felling (8 copies) .1.2.12. Executive project of planting greenery along with Specification of technical performance and acceptance of works (STWiORB) .1.2.13. Demolition project (if it is required) The project must perform a detailed inventory of buildings set for demolition, and demolition work to develop a program of development dock. techn. it possible to obtain the necessary license or filing with demolitioni?1/2the technical specification of the workmanship and the acceptance of works (STWiORB) .1.2.14. Project Executive: Part estimates and przedmiarowa: a) Integrated investment estimate (taking into account all branches) drawn up by detailed with a base and STWiORB: items 1 to "n" with a summary of each branży.b) Integrated cost estimate: JWC) Integrated FOR INdmiar robot: JWD) The aggregate list of demolition material (in 3 copies.) 1.2.15. Geotechnical documentation in 4 copies.: For the diagnosis of soil-water conditions in order to determine geotechnical foundation conditions of the road according to [7.4], [7.3], [7.2], [7.1] .In addition test holes should be located in two sections for each 1 km road where the holes locatedane will be on the axis and one at its edges and in other sections of the characteristic (eg. the valley streams, expand, etc.). 1.2.16. Geological and engineering documentation in 4 copies .: for diagnosis of soil-water conditions. For all objects for whom construction is required geological-engineering documentation, a document required to be developedation for the purposes of determining geotechnical conditions of their foundation: according to [7.4], [7.3], [7.2], [7.1] .1.2.17. All the necessary materials to a decision authorizing implementation of road investment (ZRID) and materials for temporary seizure of real estate, in particular: a. a set of documents and materials to the opinion, in accordance with Art. 11b of the Act [2], b.i?1/2a set of documents and materials for application in accordance with Art. 11d of the Act [2]: in this project including the statement referred to in Article 12 section 7 of the Act [1], current at the date of drafting. Construction project should meet the requirements of Art. 34 of the Act [1] and [1.1], c. request for a decision ZRID, d. Separate maps with the design division of immovableThose e. list of parcels included in the projected lane road (existing allocated for belt temporary seizure of the property beyond the planned and existing lane road), est. to Wojewody.f decision. obtained from the owners / co-owners / Members / property managers, declaration of acceptance by them permission to enter their propertyi?1/2in order to build or rebuild the exit, reconstruction of culverts, clearing or strengthening trenches, demolition, in this study: Pattern statements provide the Purchaser (unless the law at the time the Documentation of the Purchaser shall provide otherwise) .1.2.18. The impact of the project on środowiskoOpracowanie materials and obtain annexedswitches required for the issue by the competent authority decision on environmental conditions including the development of a report on the impact of the project on the environment (range of materials necessary to obtain a decision on environmental conditions must also meet the requirements set out in the Guidelines of the Minister of Regional Development reporting proceduresknows the environmental impact assessment for projects co-financed from national or regional operational programs) .The developed by the Contractor of materials, attachments and an application for a decision on environmental conditions, the Purchaser will apply for this decyzję.1.2.19. Conclusion of materials, according to article views. 11b of the Act [2], toi?1/2ZRID to obtain a decision by art. 11d of the Act [2] plus 8 copies. Map referred to in Art. 11d point 1) of the above. ustawy.1.2.20. Map for design purposes, scale 1: 1000 and 1: 500 for objects inĹĽynierskich and for m. Lubartow and m. Parczew, in numerical version and 2-exam. the paper version checking on the basis of the borders of all plots are located ... ™ smokers out inside ... inside Focus Areafire the planned road investment and creating borders demarcation lines inwestycji..1.2.21 area. Opinion of the coordinating council agreed project documentation with graphic materials (ZUDP) on paper (min. 2 copies.) And electronic versions on the CD: 1 egz.1.2.22. Technical Map: operating for the expanded section of road warriorswodzkiej prepared in accordance with [26] and additionally map accordance with clause. 3.2.11. : On paper (5 copies.) And electronic versions on the motherboard: 2 egz.1.3. Laws acc. 2.5.2. FINDINGS TECHNICZNE2.1. The findings ogolne2.1.1. The scope of the proposed robot includes m. Al.: 1. Widening and strengthening of the existing road surface ... more poboczy.2 and strengthening. KoreKTE non-standard łukow.3. Expansion, construction, reconstruction or repair of objects of engineering in adapting to the road expansion project. Load objects according to [1.3] for class "A". .4. Construction, reconstruction or expansion bays autobusowych.5. The construction of bicycle paths along the entire length of the staging drogi.6. Construction, development or reconstruction of sidewalks and building COMPONENTSEzek cycling one - or two-sided in urban areas, and rural roads construction of pedestrian and bicycle routes / tracks rowerowych.7. Expansion of the existing or construction of a new drainage system of the body surface road sections where there will be no surface water drainage, sewage system should be designed deszczową.8. Buildingi?1/2, extension or reconstruction downhill on the plot adjacent to the road and construction: as far as possible within a lane: road maintenance, especially in areas earmarked for new buildings or provide access to half lying on the road, in order to reduce the number and frequency of downhill. 9. The extension of intersections with roads of the same or another CATEGORYorii.10. Construction site / sites to control weighing pojazdow.11. Construction / reconstruction of road lighting required under [1.2] .12. The reconstruction / protection to the extent necessary, foreign devices colliding with the planned new road and objects inżynierskimi.13. Development of green belt boundaries of the drogowego.14. The removal of barriers architektoniVibrant within the expanded section of the drogi.15. The construction of environmental protection facilities in accordance with the terms of the environmental decision (on the basis developed by the Contractor of materials, attachments, and a proposal for a decision on environmental conditions of the Purchaser apply for this decision) .16. Provision of communication services to all parcelslocated in the provincial road No. 815.2.1.2. Contractor: 1. Development of a concept (in 2 copies. Hard copy and 1 copy. Version .pdf) taking into account the development of the lane road with drainage and support communication of plots adjacent to the provincial road, for which the Purchaser must be approved before the development of building projectsdifferent and wykonawczych.2. The preparation of the application of materials for application and obtaining opinion on the request for a decision on whether to allow the implementation of road investment in accordance with the Act [2], and in particular in accordance with Art. 11d. w / w ustawy.3. Development (together with any amendments and supplements) materials and obtaining the Annexes mentioned in Art. 74 of the Act [21] thanezbędnych to obtain a decision on environmental conditions, ie. a) information card venture with :: certified by a competent authority copies of cadastral maps covering the projected area on which the project will be implemented and covering an area who will be affected by the project, : extracts from the register of records land and buings for all parcels covering the projected area on which the project will be implemented and covering an area who will be affected by the project, : Annex graphic showing the extent of impact of the project, the Contractor, regardless of the outcome of the dot. necessity or withdraw from the necessity of carrying out evaluationss environmental impact, will develop a report on the impact of the project on środowisko.Ponadto The Contractor shall actively participated in the administrative proceedings, whose aim will be to issue an environmental decision by :: payment of any clarifications, additions, amendments to the prepared materials andałącznikow, : part in any meetings organized within the framework of the above. proceedings based administracyjnego.Na developed by the Contractor of materials, attachments and application Purchaser apply for a decision on the environmental uwarunkowaniach.4. Development operati?1/2w water law and to prepare / obtain the necessary materials (including possible aftersential amendments and uzupeĹ, nieniami on the stage of the administrative procedure advances ™ by just competent authority) to obtain the Employer ... a Decision water permit for all equipment ... devices "water and discharge water to odbiornikow.Przekazanie the above. operati?1/2w to the Employer ... dual headquarters within 30 days of receipt of the Contractor''s decision to World environmental determinantsniach.5. Implementation of recognition whether the planned project is located in areas at particular risk of flooding, in case of confirmation of this state until the Contractor must prepare the necessary materials (together with any amendments and supplements at the stage of administrative proceedings by the competent authority) to obtain the orders aher ... a Decision pursuant to Art. 88l paragraph. 2 of the Act of 18.7.2001 Water Law (Codification Dz.U.2012.145 of poĹşn. D.) Decision of the Director of the Regional Board of Water Management ... du ... more releasing from prohibitions referred to in Art. 88l paragraph. 1 cited above. Act specifies down to areas of particular risks of flooding ... .6. Obtaining any other uzgodnieĹ "and review the necessary transformations to compiled ™Vanya PB PW and to obtain a decision authorizing implementation ™ road investment in accordance with the law ... [2] .7. Obtaining a positive arrangement with the meeting of the coordination council (formerly opinion ZUDP) for the entire stretch of road covered ™ this zamowieniem.8. Obtain and provide the Employer ... Newborn current digital map for design purposes in electronic form and the Pope-dimensional scale of 1: 1000 and 1: 500 for engineering objects: bridges, culverts, overpasses and m built-up area. Lubartow and m. Parczew, to the extent necessary to develop the project with verification on the basis of the borders of all parcels located within the area of the planned road investment and forming boundaries demarcation lines inwestycji.9 area. ExecutionE photographic documentation of all existing downhill and come to the gates separately for the left and right side of the road and passing it to the Employer at the date of submission of materials for arrangements referred to in section 2.4.4.5 of this OPZ. Each photo must bear a serial number. On the basis of photographic documentation should be prepared tablenumeric list of existing conventions and reach the gates. The list should include: a) side of the road, b) the serial number of the number of photos, c) mileage exit, d) the number of lots, e) the width of the exit / handle, f) radius of the arc wyokrąglającego, g) the material used to make the exit at border lane road, h) the material used to make the exit outside the boundary strip Dr.impermeable, and) the purpose of such exit. exit an individual (to property or half), exit publiczny.10. Obtaining current industry technical terms from the owners or managers of equipment related to projected works: Conditions should be spent on ZDW in Lublin. They are subject to acceptance by the Technical Zamawiającego.Warunki and agree Industry (WŁA-owners / managers of networks or devices) must be valid for at least 6 months from the date of the submission is Zamawiającemu.11. Make electronic copies (2 copies.) Developed the project documentation (in the editable and non-editable versions: .pdf), with the proviso that the electronic version must be identical to the version papierową.12. Analysis service, communicationjnej (in 3 copies.) All parcels located at the DW No. 815 on the cadastral map at a scale of 1: 1000 with opisem.13. It is recommended that designed components roads were located within the limits of the existing roadway. In exceptional cases, previously agreed with the Employer allowed to locate these elements outside the existing lane roadof this, 14. To obtain from its owners / co-owners / Members / property managers, statements expressing their consent for entry to their property in order to build or rebuild the exit, reconstruction of culverts, clearing or strengthening trenches involved in this study: Pattern statement will provide the Employer (unless the law wheni?1/2Documentation transferring the Purchaser otherwise stated) .15. When the receiver out of the way of rain water drainage ditches will constitute the drainage system Detailed, Contractor shall obtain approval in the form of a statement of property owners through which passes w / in row and the property adjacent to exercise its renovation / reconstruction and of caseu when these works will involve cutting down trees or shrubs, consent to their removal (permission for felling), unless the law at the time the Documentation of the Employer will provide inaczej.16. The Contractor shall provide author''s supervision during the works carried out on the basis of project documentation drawn up on the basis of this Agreement and in the range of approximatelyreślonym by law Construction Law (Art. 20 section 1 item 4 of the Act [1]) and in accordance with the arrangements set out in the Agreement. Author''s supervision will take place on the basis of option rights within the meaning of Art. 34 paragraph 5 of the Public Procurement Law. Copyright Supervision Order execution will depend on the needs Zamawiającego.Wykonawca is required to performsCopyright and Supervision during the execution of the robot falling ™ of documentation ... ... projects, the expected date of completion "connection realization of investment: December 31 2020r.5) Supervision includes: c) Supervision nonresident (in quantity of the maximum 30 supervised): preparation of material, at the peĹ, nienia surveillance journey time from the office of design for the construction ™ and forth, time to budowie in one day, settle matters related to the supervision of the powrocie.d) local author''s supervision (in the amount of maximum 30 supervised): Simple activities carried out at the headquarters of Unit Project, if it follows the needs of the investment, eg. an opinion, perform analysis or develop handwriting that does not require the presence on the site itp.6) Nadzor Autorski will be exercised on the job Employer. Copyright Supervision Orders execution will depend on the needs of the Employer. That means that the Purchaser may opt out of all or part referred to in the Terms of Reference by the Employer maximum amount of the author''s supervision (right option) .7) Settlement will occur on the basis of submitted and implemented stays teami?1/2on site or in the case of a local author''s supervision after the receipt by the Purchaser subject to supervision. ie. the opinion, analysis, other writings do not require the presence of at budowie.8) The Employer shall notify the Contractor in writing about the planned start of the works covered by the project documentation at least two weeks before the planned date of commencement of work. FROMthe implementation of this recommendation from the author''s supervision will be at least 3 working days before the deadline set by the Contracting Authority execution supervision. Order execution Supervision will follow in writing. A written order will be simultaneously faxed to the number indicated by the Contractor. At the same time the Purchaser has notified the Contractor of the order by phone. The situationch a specific (eg. construction disaster), demanding immediate presence of the author of the project in the carrying robot, a person who performs Supervision is required to perform author''s supervision on notice. In this case, the commissioning of an author''s inspection may take place by telephone with a later written confirmation of the zlecenia.17. Gainnot from each Administrator / Owner of public utilities occurring in the existing and projected traffic lane, a written confirmation / arrangements about the lack of a collision with design ideas and agree on high-altitude location of utility networks in accordance with current standards. In the event of a collision existed way of its liquidation must be agreedi?1/2with the Owner / Manager of the sieci.18. Copies of speeches technical conditions, arrangements shall be made to the Employer industry with appendices (appendices in electronic form: .pdf) .2.2. IstniejącyOdcinek state of the provincial road No. 815 covered by the extension is located in the Lublin province, in the county Lubarti?1/2w and parczewskim.Początek objectof this section is located at km approx. 26 662 in the town of Parczew: a cross between DW 815 and DW 813 at the end of about 61 565 km: intersection with national road 19.Obiekty engineering within the existing provincial road No. 815 (the section covered by the development, according to the records owned): 1. Drogowe.1 culverts) km 28 220, light [cm] 2Φ150, length. 14.50: reinforced concrete pipe, The lack of data regarding the foundation, built 19742) 32 439 km, light [cm] 100x100, length. 9.50: reinforced concrete frame, no data regarding the foundation, built 19733) km 33 181, light [cm] Φ150, length. 10.40: reinforced concrete pipe, no data regarding the foundation, built 19734) km 36 062, light [cm] Φ100, length. 21.00: reinforced concrete pipe, the lack of data on PosadoTHE CONTRACT, year of construction 19655) km 37 537, light [cm] 200x150, length. 11.00: concrete vaulted, built on a concrete bench, year of construction 19706) km 38 813, light [cm] Φ100, length. 12.30: reinforced concrete pipe, the lack of data regarding the foundation, built 19687) km 39 436, light [cm] Φ100, length. 11.10: reinforced concrete pipe, no data regarding the foundation, built 19688) km40 437, light [cm] Φ100, length. 11.30: reinforced concrete pipe, no data regarding the foundation, built 19689) km 41 789, light [cm] Φ100, length. 10:10: reinforced concrete pipe, no data regarding the foundation, year of construction 196 810) 42 512 km, light [cm] Φ100, length. 11.50: reinforced concrete pipe, no data regarding the foundation, built 196, 911) km 43 627, light [cm] Φ100, length. 10.30: reinforced concrete pipe, no data regarding the foundation, built 197, 212) km 46 400, light [cm] Φ100, length. 11.00: reinforced concrete pipe, seated on a bench with gravel sand, year of construction 195613) km 48 014, light [cm] Φ100, length. 11.00: reinforced concrete pipe, seated on a bench with gravel sand, year of construction 195 614) 48 410 km, light [cm] 100x100, length. 10.00: reinforced concrete slab, built on a concrete bench, year of construction 195 615) 49 454 km, light [cm] 250x140, length. 11.50: reinforced concrete frame, placed on a bench with gravel sand, year of construction 195 616) 50 498 km, light [cm] 150x140, lon . 10.00: reinforced concrete slab, built on a concrete bench, year of construction 195 617) 50 881 km, light [cm] 3Φ80, length. 12.00: reinforced concrete pipe, seated on a bench with gravel sand, Year of construction 195 618) 51 173 km, light [cm] 150x140, length. 10.00: plate, placed on ławiez gravel sand, year of construction 195 619) 51 940 km, light [cm] Φ150, length. 12.00: reinforced concrete pipe, built on a concrete bench, year of construction 195 620) 55 041 km, light [cm] Φ150, length. 12.40: reinforced concrete pipe, placed on a bench with gravel sand, year of construction 195 621) 55 248 km, light [cm] 2Φ125, length. 12.40: reinforced concrete pipe, seated on a bench with gravel sand, year of construction 1956.2. Bridges on the existing provincial road No. 815 (the section covered by the development): 1) the bridge over the river peonies in Parczew at km 27 122Most kablobetonowy beam freely supported without brackets. Superstructure precast beams with post-tensioning typeat CBS Lt = 16.00 m, with thick reinforced nadbetonem. from 6 cm to 13 cm. Concrete foothold massively constructed on 2-ch rows of precast reinforced concrete piles 30x30 section and length of 5.00 m. The bridge is located on a straight section of drogi.Rok construction 1959.Podstawowe technical parameters utilitarian object :: total length lc = 16.74 m, : span theoretical lt = 16.00i?1/2m, : length of the bridge with wings 25, 50 m, : total width superstructure bc = 9.76 m, : width of the handrail bu = 9.50 m, : width of the road bj = 7.00 m width of the sidewalks 2x1, : 25 m, : load capacity of 30 t 2) bridge across the river Tyśmienicę in Siemień at km 36 586Most reinforced concrete slab trzyprzęsłowy continuously without brackets. Superstructure reinforced concrete slab continuousi?1/2fixed grubości.Przyczołki extreme massive concrete founded on 2-ch rows of precast reinforced concrete piles with section 30. Supports 30x indirect reinforced concrete pillar hexagonal pillars about 30 cm side founded on 2-ch rows of precast reinforced concrete piles with a cross section of 30 x 30. The bridge is located drogi.Rok on a straight section of bridge construction 1960.Remont EVALUAowadzono in 2004r.Podstawowe technical parameters: usable object :: total length lc = 40.03 m, : span theoretical lt = 2 x 11, 70m 16, 23m, : length of the bridge with wings 45, 53 m, : total width superstructure bc = 8, 72m, : width of the handrail bu = 8.10 m, : width of the road bj = 7, 00m .: loaded with 30 t3) Bridge over the row with no name in m. Klementynowi?1/253 794Most reinforced concrete, freely supported without brackets. Nośny- deck monolithic reinforced concrete slab. Concrete solid foothold sited using a concrete strip footings directly on the ground. The bridge is located on a straight section of drogi.Rok 1936.Remont construction of the bridge was carried out in 2006r.Podstawowe technical parameters: Utility :: total length obiektu lc = 6.60 m, : span theoretical lt = 5.50 m, : length of the bridge with wings, : 13.56 m total width superstructure bc = 8.40 m, : width of the handrail bu = 7.24 m, : width of the road bj = 7.24 m .: bearing capacity 30t4) bridge across the river hog in Szczekarki?1/2w at km 56 353.Most trzyprzęsłowy steel, freely supported. Superstructure of wolnopodpartych steel girders lattice-shaped, , N "with driving bottom and the upper-curved belt. Bridge with thick concrete slab. from 14 cm to 18 cm loosely based on the belts of the upper steel cross members and side members. Beachhead extreme side Parczewo massive concrete built on a 2-ch rows of bored piles with a diameter of 0.60 m length. 15, 60m. Beachhead skrajny from the massive concrete Lubartowa built on a 2-ch rows of bored piles 30x30 section and length of 8.0 m. The supports indirect: the massive concrete pillars founded on precast reinforced concrete piles 30x30 section and length of 7, 20m. The bridge is located on a straight section of drogi.Rok 1957.Remont construction of the bridge was carried out in 2002r.Podstawowe PARAMETTechnical rice: Utility :: Object total length lc = 108.09 m span theoretical, : lt = 3 x 35.30 m, : length of the bridge with flaps 116.66 m, : total width bc = width of 11.04 m, : road bj = 7.0 m, : paving width 2 x 1.0 m, : load capacity of 30 t5) Bridge over the row with no name in m. Szczekarki?1/2w at km 58 353.Most reinforced concrete, freely supported without brackets. Ustroj carrier: monolithic reinforced concrete slab. Concrete solid foothold sited using a concrete strip footings directly on the ground. The bridge is located on a straight section of drogi.Rok 1965.Remont construction of the bridge was carried out in 2014r.Podstawowe technical parameters: usable object :: total length lc = 7.64 m, : span theoretical lt = 7.04 m length, :ugość bridge with wings 14, 48 m, : total width superstructure bc = 12.38 m, : width of the handrail bu = 11.0 m, : width of the road bj = 10.30 m .: load capacity of 42 t6) Bridge by row without a name in m. Lubartow at km 59 432.Most single-span steel, freely supported beam without brackets. Superstructure with steel girders NP. 55 of the reinforced concrete slab alerating. Massive concrete foothold sited directly on the ground. The bridge is located on a straight section of drogi.Rok 1965.Remont construction of the bridge was carried out in 2006r.Podstawowe technical parameters: usable object :: total length lc = 9.40 m, : span theoretical lt = 8.89 m, : length of the bridge with wings 14.53 m, : total width superstructurei?1/2bc = 9.50 m, : width of the handrail bu = 8.68 m, : width of the road bj = 8, 68m .: loaded with 30 tRodzaje technical infrastructure at the waist existing and planned provincial road and its vicinity: a) Sanitation Network (mains water supply, sewerage. Plumbing, gas) .b) energetyczne.c Network) teletechniczne.d Network) network listed szerokopasmowa.Poza Networks utilities with fixed course and the property does not preclude the presence of other niezidentyfikowanych.Istniejące Field uwarunkowania.a) Conditions relating to land due to local spatial development plans or studies of conditions and directions of spatial dotyczy.b) Environmental conditions Environmental terenu.Warunkiland should be adopted in accordance with issued by the competent authority decision on the environmental conditions. Preparation of the application and all materials and attachments necessary to achieve the above. the decision belongs to Wykonawcy.Warunki arising from the protection of archaeological and conservation of the area: The Contractor shall obtain the current conditions for the Project for Construction and Wykonawczego.Wpracowaniu conditions must be taken into account obtained from the związane.c) The geological conditions terenu.Wykonawca obtain the necessary data for geological terms terenu.d) Conditions resulting from the planned construction or reconstruction of infrastructure drogowej.Potrzebne information and conditions resulting from land-use lane road and the area adjacent Contractor shall obtain in framech execution projektowej.2.3 documentation. Particular requirements for projektowania2.3.1. The objective of proper preparation of the offer: including the integration of all industry developments and detailed technical solutions: it is advisable to make your vision in the field, see a copy of the basic map and where there is no doubt that in. Check with outcrops networki?1/2podziemnego.2.3.2 weapons. The Contractor shall obtain their own to ZDW industry in Lublin current technical conditions of the owners or managers of equipment related to the projected road works. They are subject to acceptance by the Zamawiającego.2.3.3. Techniczne.1 requirements. G.2 single carriageway class. The cross-section of the road: a track in the areaie the open road, street or half-street in urban areas, 3. The width of the roadway 7.0 m (2x3, 5m), 4. Pavement bearing capacity of 115 kN / axle, 5. Shoulder width of 1.50 m reinforced stabilized aggregate broken mechanicznie.6. The contractor of the project will provide communication service to each plot, wherein: a) Congresses should be designed in the level of the pavement, the link filefor existing gates and the width of the vehicles benefiting from the conventions, but no more than is apparent from i?1/2 78 and 79 [1.2] and the length from the edge of the road to the border of the roadway, the :: any convention both individual and public, should be analyzed in terms of altitude and location in the plan, should be granted in accordance with normatywem, access to the property .: in the case where, although the maximum downward longitudinal adopted by the requirements of [1.2], the length of the meeting will be to go beyond the border the roadway, the design should anticipate the embankment on the property of which is being designed to exit, and if necessary, reconstruction fence / gate. For such congresses must Repshoals in the form of the graphic and descriptive customized solution. In other cases, if the length of the exit will be located within the lane, downhill skiing in the table provided for each convention separately, ordinates its solutions altitude in characteristic points of the axis of exit .: conventions should be perpendicular to the edge of the carriageway road in the border beltgo.b) Congresses individual for property design with a width of paved minutes. 4, 0m unless the existing gate or exit has a smaller width, but not less than 3, 0m.c) Public Congresses internal roads (roads that do not have municipal given to the class and number) design with a width of min. 5, 0m with rays wyokrąglającymi min. 6.0m: other PARAMETRice require approval Zamawiającego.d) Public Congresses (outside exits on internal roads) design with a width of paved minutes. 4, 0m and the corresponding turn radii adapted to the nature of działalności.e) Congresses to half design with a width of paved minutes. 4, 0m and the corresponding turn radii for entry of agricultural machinery.f) Alpine Constructions :: reunions individual to the property (up land): concrete blocks from the edge of the road to the border lane road, continue on link file to an existing terrain with mechanically stabilized aggregate, unless the condition is different from the existing hard surface (eg. cube paved aisles. bitumen), which should play / translate into arrangementsuz owner of the property that leads to the exit and the Employer, : public gatherings on internal roads: Bitumen aisles, : public gatherings (outside exits on internal roads): concrete blocks from the edge of the road to the border lane road, continue on link file to an existing area of the aggregate stabilized Mechanically, unless the state it is different from the existinghard surface (eg. concrete cubes, aisles. bitumen), which should play / postponed in agreement with the owner of the property which leads downhill and downhill to, : Employer half: the aisles. Bitumen from the edge of the road to the border of the roadway, further link file to an existing terrain with mechanically stabilized aggregate, unless the condition existing thit another hard surface (eg. concrete cubes, aisles. bitumen), which should play / postponed in agreement with the owner of the property which leads downhill and Zamawiającym.7. The entire length of the extended section 815 CC bike paths should be designed by the naves. bitumen (in special cases, inter alia, due to the terms of the administrators of utility networksi?1/2the land, with the consent of the Employer of concrete blocks bezfazowej), or in consultation with the Employer and the relevant municipalities, outside the built-up area (according to the design of a new permanent traffic arrangements described in this OPZ) to design a bike path with pedestrians or road service to the admission of walking and cycling . Location path in agreement with Zamawiającym.8. The built-up area (according to the design of a new permanent traffic arrangements described in this OPZ) in consultation with the Employer and the relevant municipalities, to design the construction, extension or reconstruction of sidewalks and duplex or in agreement with the Employer and the relevant municipalities to design bicycle paths involving pieszych.9 . Ensure that thethat lead to the existing furtek.10. The design of the roadway determined on the basis of: a. pavement deflection test method, b. an assessment of the ground, on the basis of documentation geotechnical investigations, c. evaluate the nature and quality materials and the usefulness of subsequent layers of the existing pavement structure, based on surface drilling and casing and assessment of road-drillzchni by SOSN performed by the Contractor, d. category calculated move, based on the last measurement General. the provisions of [1.2], [1.3], [7.1] Ordinance No. 4 of the General Directorate of Public Roads of 23 February 2001. on the introduction of the directory reinforcements and repairs of flexible and semi-rigid paving and other regulations in force at the date of transfer of DocumentTechnical entacji Employer ... cemu.11. Solution ... tie ‡ comprehensive, surface drainage of the road with the possible taking into account the construction ™ storm water drainage along with the discharge water outside lane, rownieĹĽ of culverts, to the receivers. Dehydration to design ‡ accordance with the norm ... PN-S-02204 automobile roads and by the decision of World environmental conditions. Drainagee way, the choice of diameter culverts, ditches, etc. performance. hydrologicznymi.12 to confirm calculations. Storm water drainage design, taking into account the requirements of the Water Act and in accordance with the conditions laid down in the decision on environmental conditions, including the development of sampling water use and materials necessary to obtain a permit wodnoprawnegof the execution of the objects belonging to the water facilities, including roadside ditches and developing materials necessary to obtain a permit for discharge of waste water into the environment of the entire projected lane road to the receivers. The technical project for the industry, will be an integral part of this contract, without additionali?1/2wynagrodzenia.13. Environmental protection equipment designed in accordance with the terms of the decision on the environmental conditions, including the construction of culverts and crossings for animals if the above-mentioned provisions will be required. decyzji.14. The proposed grade line of the road surface adapted to the vertical alignment of the objects inżynierskich.15. Intersection with county and communal roads (having kLase and number) designed to adapt to [1.2]. In justified cases any reduction in the width of lanes of traffic calming elements using ruchu.16. Adjustments to existing non-standard horizontal curves in complying with the requirements set out in [1.2] .17. Bus bays closed type of platforms (not as an extension of the beltconnecting traffic at the intersection) design in existing public transportation (in accordance with the approved project a permanent organization of movement: a project in the possession of the Employer), with the possibility of changing the location of bays at the request of Commons or residents of or after a detailed analysis of the designer, and after prior approval by the Employer .18. Provide land for shelters using peronu.19 surface. The pavement structure when combined broaden the use geosyntetyki.20. At intersections with roads and other provincial constitute a major source (over 20% relation) turning left, use the lanes for vehicles turning left and refuges for pedestrians, if performancekissing passage for pieszych.21. Road lighting design required by Regulation [2} .22. At pedestrian crossings built-up areas apply sanctuaries for pieszych.W the absence of street lighting should be designed to azylach active and lighting pylons pedestrian crossings powered by solar panels / solar systems. In addition to the Focus Areabuilt-fires azyli not designed for pieszych.23. At intersections, bus bays and public meetings and individual contractor of the project is to ensure visibility conditions [1.2] NOTE: The above technical parameters should be verified with the participation of the Employer at the stage of development of the Project Construction. With the consent of the Employer allowedthe above changes. technicznych.2.4 requirements. Requirements for the exercise studies included zamowieniem2.4.1. The rules and conditions for the realization of the subject zamowienia2.4.1.1. Contractor is obliged to know and apply all the rules, guidelines and instructions related to the implementation of the procurement in the version in force for the duration of umowy.2.4.1.2. Inykonawca provide author''s supervision during the works carried out on the basis of project documentation drawn up on the basis of this Agreement, and to the extent specified by law Construction Law (Art. 20 section 1 item 4 of the Act [1]) and in accordance with the arrangements set out in Umowie.2.4. 1.3. Documentation Contractor agrees to reproduce and publish documentation on howiejkolwiek form on the Internet and materials informacyjnych.2.4.2. Requirements for dokumentacji2.4.2.1. The Contractor undertakes to execution of the contract with due diligence in a manner consistent with applicable regulations and the principles of modern knowledge technicznej.2.4.2.2. Project documentation should be done in chainage force on the road voivodshipkiej No. 815 with a change if wystąpią.2.4.2.3. Projects for the construction / reconstruction of infrastructure related equipment and non-road (gas networks, energy, telecommunications, water supply, sewage, etc.) must absolutely contain the current technical conditions for the construction or remodeling (removal of collision). The Contractor is responsiblefor updating the terms for the relevant industries. Technical conditions and arrangements Industry (owners / managers of networks or devices) must be valid for at least 6 months from the date of transmission of the Employer. Ww. conditions and arrangements constitute an integral part of the projects branżowych.Przy agreement with the observations documentation, documentation should be taken into consideration whenDNIC these comments and attach a statement of their spełnieniu.2.4.2.4 Designer. Made of sector dossier is technically mutually coordinated and complete from the point of view of the objective which is to serve. Include checks will be required to confirm design solutions in the field arising from the provisions required opinions, agreements, approvals and permits withinie resulting from the recipes, as well as a list of studies and documentation that make up the complete object zamowienia.Dokumentacja have a statement from the Contractor, referred to in Art. 20 of the Act [1], signed by the designers responsible for meeting these requirements, it has been performed in accordance with the contract, the applicable regulations, rules of technical knowledgei?1/2and able to complete from the point of view of the objective which has służyć.2.4.2.5. The Contractor will join the Building Design copies of licenses designers and verification. Moreover, beyond the construction project must be submitted to the Purchaser set of certificates from the competent Chamber of Civil Engineers: certificates must be valid on the date of preparation and transfer documentation project to Zamawiającego.2.4.2.6. Originals obtained documents, opinions, agreements, etc. Whose copies were included in the project documentation should be complete in a separate study and include a list of contents to pass the Purchaser within the time limit as the whole subject of the contract covered by this OPZ.2.4.2.7. The Contractor shall perform the development Projektoin the graphic design, which meets the following wymagania.a) ensures readability, clarity and uniqueness of content, b) a part of descriptive and computational should be written on a computer, c) is consistent with the requirements of the relevant regulations, standards and guidelines, d) the format of drawing sheets It will be limited to the minimum necessary and submitted to the A-4 (A-3 for graphicTrademarks Traffic Organization), e) development of the individual elements must be submitted in a separate folder with a permanent handle adapted to the size of the item. On the briefcase should put the task name and the name of the item in the middle of the folders should be shown a list of its contents (separate part of the environmental, geotechnical, geological, technical, economic), f) part rysunkowa will be made clearly and legibly, g) drawings will be made according to the rules of technical drawing (eg line thickness, color), h) every drawing shall bear the metric, like the title pages and covers individual components to develop the project, before handing design projects to receive the Contractor shall submit to the Employeri?1/2to accept the proposed list of folders, titles of subsequent studies and general studies graphic design projektowych.2.4.2.8. The Contractor shall use methods to perform measurements and tests at inventories and calculation methods and computer software used for evaluation of the technical condition and design work complies with the requirements of the contract, recipes and Polish burrowsm. Computer software should have the legally required licenses for use. The scope of your license for the use of computer programs must be consistent with the scope and the way you use the software provided by the Contractor to carry out studies projektowych.2.4.2.9. The contractor will be responsible for the protection and design projects for allthat the starting materials used and received during the design work. The contractor will maintain consultancies and starting materials until the transfer of their Zamawiającemu.Wykonawca will hold for at least 10 years from the date of the final copy archive of all studies included in the project design documentation.2.4.3. Contractors cooperation with ZamawiającymWykonawca will support the Employer in administrative proceedings in order to obtain the required decisions, agreements and opinii.Wykonawca will cooperate and assist the Contracting Authority in the conduct of any public consultation in the preparation of information materials and counseling substantive and UDZielał response to a question at the stage of obtaining all administrative decisions (eg. ZRID, the decision of water permit, etc.) and on the stage of selecting the contractor and engineer Kontraktu.Do Contractor shall: a) organization of and participation in meetings (held at his own request or Employer demand) with representatives of local authorities, residents terenow, on whom the investment is located, and other interested parties, regarding ... smokers if necessary. consultation of social, local and presenting a vision of the project and other uzgodnieĹ "to the extent and under the rules specify forth in the law and guidelines, obligatory ... chew ... smokers and introduced during the term of the contract; b) participate in the Technical Councils (organized on theLasne request or the request of the Employer) and other meetings at the request of the Contracting Authority; c) preparing minutes of consideration various comments and proposals to the under development of design documentation received by the Contractor, the minutes of the public consultation and passing them on an ongoing basis Zamawiającemu.d) The Contractor will represent the Employer in contactswith local authorities at all levels in the area resulting from the execution of the subject umowy.e) The Contractor will cooperate to the extent necessary to carry documentation with other Contractors working on behalf of Zamawiającego.f) The Contractor undertakes to ensure the confidentiality of all information received from the Purchaser in connection with the implementation of the Straitjszego zamowienia.g) The contracting parties shall cooperate in matters of substance and formal, which occur during the implementation of the orders. To this end, the Parties shall appoint its przedstawicieli.h) The Contractor is obliged to submit a comprehensive written explanation along with the additions previously developed documentation concerning. Requests for documentation developed croupawanych in the course of tender procedures conducted by ZDW in Lublin for the selection of contractors and contract engineer: within 3 working days from the day send a request by e-mail or pocztą.2.4.4. Pracy2.4.4.1.Dokumentacja control of execution during development and prior to the transfer to the Purchaser should have positive reviewsTechnical Board ZDW in Lublinie.Na stage of preparing the documents Contractor shall, on the date agreed with the Employer adopted design solutions in particular concerning: a) how communications service real estate adjacent to the staging provincial road along with showing any possibility directions to them from other public roads, B) a site plan with the geometry of the road, c) the method of drainage and water discharge to the receiver, d) the objects of engineering design solutions, e) design solutions in the field of road intersections and inclusions side, f) surface structure, g) any tanks for rainwater itp.2.4.4.2. The work schedule projektowych.Dla provide opportunities monitoring the progress of design work, the Contractor shall develop a schedule of design work and deliver it in paper (3 copies.) to the Contracting Party within 14 days of receipt of the signed bilateral umowy.Zamawiający approve the schedule of design work, as long as it complies with the requirements of the contract, within 14 days from the date of submission ofing him to zatwierdzenia.Wykonawca at the request of the Purchaser is obliged to promptly supplement / improve submitted for approval to the work schedule projektowych.Harmonogram design work should include deadlines for the various line items under this OPZ, as well as: a) the deadlines to apply for obtaining materialsyjściowych to properly implement the object orders, including obtaining maps for design purposes, b) the terms of trade of technical conditions of the owners / managers of public utilities and road managers, c) the deadlines for the submission to be agreed by the Employer design solutions listed in section 2.4.4.1 . and in particular the development of docktation of the geological and geotechnical and pavement deflection measurements and provide the Employer of materials for pavement construction arrangements within the 30.05.2016r.d) to develop the terms line items in accordance with the schedule Umowy.Zatwierdzony design work is an integral part of umowy.Zamawiający we reserve the right to WITHDRAWALand the agreement''s fault if the delay in the implementation part of the subject of subsequent orders included in the approved schedule, exceed 30 days from the date indicated in this harmonogramie.2.4.4.3. PracWykonawca progress report is required to prepare monthly progress report design and deliver him to the headquarters of Employeri?1/2on paper the 5th of each miesiąca.Do each report must be accompanied by a copy of all instances to obtain materials, data, technical terms, opinions and arrangements together with a copy obtained materials, data, technical terms, agreements and opinions for the month covered by the Raportem.2.4. 4.4. Contractor is obliged to obtain all necessarych opinion, agreements and checks the project, in particular trade agreements, arrangements coordinating councils (former opinion ZUDP), Regional Conservator, Regional Director of State Forests, WZMiUW in Lublin, offices of Towns and Municipalities, management / owners Drog, owners / management boards of the network and urządzeń.2.4.4.5. Contractor is obliged to Getand in ZDW in Lublin: 1. Design solutions at PB and PW for objects of engineering, site plan expansion of the road: uzgodnienie.Do agreed site plan must be submitted and made photographic documentation drawn up a list of existing conventions and to come to furtek.2. The construction of roads, sections normal: uzgodnienie3. Project industryElectricity: lighting, STWiORB, estimates and takeoffs robot: akceptacja4. Prior to submitting documentation of individual elements of the Employer, the solutions adopted must be presented and justified its validity on the Technical Board ZDW in Lublin with the participation of local governments and other representatives, ie. Get the Council to agree Technicznej.5. Solutionsi?1/2design in terms of geometry at the level of the PB should obtain a positive opinion of the managing body of the provincial road traffic (before obtaining site plan negotiated the extension of the road), and Projects Organization Permanent and Temporary Movement: approval of the organu.2.5. The provisions of związaneDokumentacja design is to meet the requirements of this specificatione subject of orders and legislation, standards, normatywach, catalogs, guidelines and other necessary in the implementation of orders, existing at the date the submission is Zamawiającemu.Wykonawca is obliged to know and apply all the provisions related to the execution object of the contract, as applicable during the period of agreementAnd szczegolnoĹ Nill you mentioned, of poĹşniejszymi zmianami.Ustawy: [1] Law of 7 July 1994. Construction Law (Journal of Laws of 2013. Pos. 1409 poĹşn. D.) [1.1] ... The decree of the Minister of Transport, Construction and Maritime Economy of 25.4.2012 on szczegoĹ, owego scope and form of construction project (Journal . Laws of 2012. 462 of poĹşn. d.) [1.2] decree ... dZeni Minister of Transport and Maritime Economy of 2.3.1999 on technical conditions to be met by public roads and their location (Journal of Laws of 1999. No. 43 pos. 430 with later. d) [1.3] Ordinance of the Minister of Transport and Maritime Economy of 30.5.2000 on the technical conditions to be met by traffic engineering objects and their usytuming (Journal of Laws of 2000. No. 63 pos. 735 with later. d) [1.4] Ordinance of the Minister of Infrastructure of 06.23.2003 on information regarding safety and protection of health and safety plan and health (Journal of Laws of 2003 . No. 120, item. 1126) [1.5] Ordinance of the Minister of Transport, Construction and Maritime Economy of 25.4.2012 on the fixing of geotechnicsinter-related terms foundation of buildings (OJ 2012.463 with later. d.) [1.6] Ordinance of the Minister of Planning and Construction of 21.2.1995 on the type and scope of geodetic: cartographic and geodetic activities valid in construction (OJ from 1995. No. 25 pos. 133z late. d.) [1.7] Ordinance of the Minister of Infrastructure Districtry of 12.4.2002 on the technical conditions to be met by ‡ buildings and their location (Journal of Laws of 2002. No. 75, pos. 690 of poĹşn. d.). [1.8] ... The decree of the Ministry of Infrastructure 23.6. 2003 on the patterns: an application for permission to build ™, resort experience that he holds to dispose of the property string ... for construction purposes and the decision on the permit to build ™(Journal of Laws of 2003. No. 120, item. 1127 with poĹşn. Chg.) [1.9] ... The decree of the Minister of Environment of 20.4.2007 on technical conditions to be met ‡ hydraulic structures and their location (Journal of Laws No. 86, pos. 579) [2] Act of 10.4.2003 on particular rules for the preparation and implementation of investments in the field of public road (consolidated text. OJ 2014 poz.40) [3] Act of 21.3.1985 on Public Roads (Journal of Laws of 2015. Pos. 460) [4] Act of 20.6.1997 Road Traffic Law (Journal of Laws of 2012. No. 1137 with later. d.) [4.1] Minister of Infrastructure Regulation of 23 September 2003. on the detailed conditions of road traffic management and to exercise supervision over the management (OJi?1/2of 2003. No. 177, item. 1729) [4.2] Regulation Ministers of Infrastructure and Internal Affairs and Administration of 31.7.2002 on road signs and signals (Journal of Laws of 2002. No. 170, item. 1393 with later. D.). [4.3] Minister of Infrastructure Regulation 22.6.2011 on the detailed technical conditions for traffic signs and signals and safety devicesData Sheet terms of traffic and placing them on roads (Journal of Laws of 2011. No. 133 pos. 772 with later. d.) [5] Act of 27.4.2001 Environmental Protection Law (Journal of Laws of 2013. pos 1232) [6] Act of 18.7.2001 Water Law (Journal of Laws of 2012.145 jt with later. d.) [7] Act of 9.6.2011 Geological and Mining Law (Journal of Laws of 2011 No. 163, item .981, with later. d.) [7.1]... The decree of the Minister of Environment of 23.12.2011 on szczegoĹ, owych requirements ", which should match ‡ hydrological and geo-ENGINEERING (Dz.U.Nr 291, pos. 1714 of 2011). [7.2] Ordinance of the Minister of Transport ..., Construction and Maritime Economy of 25.4.2012 on establishing geotechnical conditions of foundation of buildings (Dz.U.2012.463 126 of 1998., Pos. 839 with later. d.) [7.3] Ordinance of the Minister of the Environment of 19.12.2001 on projects of geological work (Dz.U.Nr 153, pos. 1777 with later. d.) [7.4] Manual testing of subsoil road and bridge construction. Part 1 and 2. GDDP, Warsaw 1998. [8] Act of 28.9.1991 on Forests (Journal of Laws of 2014 poz.1153 of poźn.zm.) [9] Law27.3.2003 on Spatial Planning and Development (Journal of Laws of 2012.647 jt with later. D.) [10] Act of 17.5.1989 Geodetic and Cartographic Law (Journal of Laws of 2015. Pos. 520) [10.1 ] Regulation of the Minister of Internal Affairs and Administration and the Minister of Agriculture and Food Economy of 14.4.1999 on the demarcation of property (OJ of 1999r. No. 45 pos. 453) [10.2] ... the Ordinance of the Minister of Regional Development and Construction of 29.3.2001 on the land and building (Journal of Laws of 2001 no. No. 38 poz.454) [10.3] ... the Ordinance of the Minister of Internal Affairs and Administration ™ of 9.11.2011 on technical standards situational execution of geodetic measurements and height qualitative and developing and przekazywania results of these measurements to the countries'' resource-layered geodetic and cartographic (Dz. U of 2011., No. 263, item. 1572). [10.4] ... the Ordinance of the Minister of Regional Development and Construction of 04.02.2001 on the geodetic records of public utilities terrain and team spirit reconciliation project documentation (Journal of Laws of 2001 no. No. 38 poz.455) [10.5] Ordinance of the Minister of ...Regional Development and Construction of 16.7.2001 on filing a surveying and mapping, recording and storage systems ... smokers copy of the security database, as well as the general terms TripAdvisor ™ for sharing these databases (Journal of Laws of 2001 no. No. 78 pos. 837) [11] Act of 21.8.1997 on the economy estate photos (Journal of Laws of 2014, item. 518) [11.1] Regulation of the Council of Ministers of 7.12.2004 on the manner and procedure of carrying out real estate divisions (Journal of Laws of 2004. No. 268, item. 2663) [12] Law of 10.19.1991 on the agricultural property of the Treasury (Codification Journal of Laws of 2012. jt 1187 with later. d.) [13] The Act of 13.10.1998 legislation introducing laws reforming the administration of publiczną (Journal of Laws of 1998. No. 133 pos. 872 with later. d.) [14] Act of 29.1.2004 the Public Procurement Law (Journal of Laws of 2013. 907, jt with later. d.) [14.1 ] Regulation of the Minister of Infrastructure of 18.5.2004 on determining methods and bases for preparation of the investment cost estimate, calculating the planned costs of design works and planned costs of constructionch specify down in the functional and utilitarian (Journal of Laws of 2004. No. 130, item. 1389) [14.2] ... the Ordinance of the Minister of Infrastructure of 2 September of 2004. szczegoĹ, owego on the scope and form of design documentation, technical specifications performance and acceptance of works and functional program: uĹĽytkowego (Journal of Laws of 2013. 1129 jt) [15] Law 15.12.2000 professional associations of architects, civil engineers and urban planners (Journal of Laws of 2013. 932 jt) [16] Act of 23.4.1964 Civil Code (Journal of Laws of 1964. No. 16 pos. 93 with later. D.) [17] The Act of 11.17.1964 Code of Civil Procedure (Journal of Laws of 1964. No. 43 pos. 296 with later. d.) [18] Act of 14.6.1960 Code of Administrative Procedure (consolidated text: Journal of Laws of 2013r. poz.267 with later. d.) [19] Surveying Instructions and guidelines Lublin Provincial Office. [20] The applicable at the time of preparation of documentation standards, guidelines and instructions. [21] The Act of 3.10.2008 on the provision of information about the environment and its protection, public participation in environmental protection and the Environmental Impact Assessment (tjDz.U. of 2013.i?1/2Pos. 1235 with later. d.). [22] Polish Standard PN-69 / M-02057 standard gauge railways. Extremely building. [23] Act of 28.3.2003 on railway transport (ie OJ 2013 poz.1594 of poźn.zm.) [24] Ordinance No. 38 of the Minister of Infrastructure of 26.10.2010 on the appointment of military load classification of bridges located in stretches of public roads (Official Journal of theMinister of Infrastructure row No. 13 pos. 37 of 2010). [25] Ordinance No. 11 of the Minister of Infrastructure of 4 February 2008. on the implementation of the technical requirements of the defense in the preparation of road infrastructure for defense needs of the state. [26] Minister of Infrastructure Regulation of 16 February 2005. the method of numbering and records of public roadsch, bridges, tunnels, culverts and ferries and given to the register of roads, bridge and tunelom.3 objects. FINDINGS FORMALNE3.1. Ogolne1 requirements. Construction Projects (PB): this is the development of a detailed design, which depending on your needs are: clarifying all the final elements of the planned investment task, gettingZRID in accordance with the decision [2] implementing projects preparation (PW) .Projekty Building (PB) should be developed in accordance with: [1], [1.1], [14.2], [2] and the decision on environmental uwarunkowaniach.2. The current map for design purposes the road in 1: 1000 scale (1: 500 for m built-up area. Lubartow and m. Parczew and for engineering objects) in numerical form andpaper, Contractor shall obtain their own efforts. Maps that will be transferred to the Purchaser within the time specified as for the whole zamowienia.3. Current and specified ranges collision foreign devices with the planned construction of a road, on the basis of the detailed technical conditions (conditions should be issued to the Investor, ie. ZDW in Lublin) on their reconstruction lub protection from their owners, the Contractor shall provide the Employer to akceptacji.4. The construction of storm water drainage design in accordance with the Water Law Act, including the development of sampling water permit for the execution of outlets storm water drainage to środowiska.5. Construction project must be accompanied by a photocopy of allowances designer and the verifier, and the statementno designer and the verifier to draw up a construction project in accordance with the applicable regulations and principles of technical knowledge, as well as accompanied with information on the safety and health protection. Documentation pages must be numbered consecutively, including attachments and rysunkami.6. Construction Projects should be framed in a way that prevents sentenceekompletowanie.7. Estimates of przedmiarami the road construction industry and other sectors are to be merged into a single estimate and Takeoff (from position 1 to n-th) and made in the same style for all industries in the form agreed with the Zamawiającym.3.2. Opracowania3.2.1 range. Part środowiskowa.A. Decision on environmental investment uwarunkowaniachPrzedmiotowa on the basis of:: Art. 71 paragraph. 1 point 2

Documents

 Tender Notice


Similar Tenders

GiZ Tenders India

Procurement Documents for Poland

Access a comprehensive library of standard procurement documents specific to Poland. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Poland

Explore Procurement Documents for Poland


Want To Bid in This Tender?

Get Local Agent Support in Poland and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?