Procurement Summary
Country : Switzerland
Summary : Emergency Power Diesel Groups 400vac with 72h Autonomy Time Axpo Grid Ag
Deadline : 12 Dec 2023
Other Information
Notice Type : Tender
TOT Ref.No.: 92286543
Document Ref. No. : 1377657
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Interpretation, manufacture, delivery, assembly line, commissioning, documentation, training and acceptance test of the emergency power diesel groups 400VAC with 72h autonomy time. The control (including panel with a network display) includes a network switchover in the first priority. After an unsuccessful network circuit, the emergency power group starts with the takeover of the start load of (max. 120 to 150a). After returning the network, an automatic back synchronization is followed by stopping the emergency power group. The goal is a self -employed overall work that meets the specified requirements.
Demand/awarding authority: AxPO Grid Ag Procurement Center/Organizer: AxPO Grid AG, to HDN. by Daniel Bachmann, Parkstrasse 23, 5401 Baden, Switzerland, phone: +41 56 200 31 11, email: Prauche.ee@axpo.com, url www.axpo.com
Publish Date: 11/17/2023
Procurement object
2.1 Type of the delivery order: a combination
2.2 Project title of procurement: emergency power diesel groups 400VAC with 72h autonomy time
2.3 File number / project number: Emergency power diesel groups 400VAC with 72h autonomy time
2.4 Division in lots?: No
2.5 Community vocabulary:
2.6 The subject and scope of the order: interpretation, manufacture, delivery, assembly line, commissioning, documentation, training and acceptance check of the emergency power diesel groups 400VAC with 72h autonomy time. NOT current diesel groups (external installation) with control and generator switch (inn list). The control (including panel with a network display) includes a network switchover in the first priority. After an unsuccessful network circuit, the emergency power group starts with the takeover of the start load of (max. 120 to 150a). After returning the network, an automatic back synchronization is followed by stopping the emergency power group. The goal is a self -employed overall work that meets the specified requirements. For five submissions plus a sub -plant optional.
2.7 Place of delivery: UW Mörschwil, Aachenstrasse 16, CH-9402 Mörschwiluw Weinfelden, Bussnangerweg, CH-857 ...
Documents
Tender Notice