Procurement Summary
Country: France
Summary: Electrification Work on the Stas M4 Line with a View to its Trolleybus Operation
Deadline: 27 Apr 2026
Posting Date: 31 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138743227
Document Ref. No.: 220504-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45232210 - Overhead line construction
45234170 - Locomotive-substations construction works
45213250 - Construction work for industrial buildings
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Saint-Etienne Metropole recently chose to equip the M4 and M6 lines with the STAS network, in continuity with the choice made during the previous mandate, which successfully re-equipped (performance and operational robustness) the M3 and M7 lines. The trolleybus equipment of the M6 lines (then M6+ which comes extending the current M6 line to the Cite du Design) and M4 thus constitutes a second phase of deployment of this clean technology, by pooling certain substations, two-wire lines on certain sections, and rolling stock. This operation consists of the electrification of the M4 line. Each lot will be awarded separately. The consultation is broken down into three lots Infrastructure, VRD and Overhead Contact Line (LAC) Energy Buildings under new construction
Doc Title: Electrification work on the STAS M4 line with a view to its exploitation en trolleybus
Contract Type: works
Document Type: Contract Notice
Reference Number: 2026C3171
Contract Type: works
Doc Title: Electrification work on the STAS M4 line with a view to its trolleybus operation
Dispatch Date: 2026-03-27
Published Date: 2026-03-31
Submission Date: 2026-04-27
Documents
Tender Notice