Procurement Summary
Country: Honduras
Summary: Electrical Engineering Services - Recruitment of the Services of an Electrical Engineer to Carry out the Technical Analysis Study of the Electrical System of the Specialized Care Center...
Deadline: 09 Sep 2026
Posting Date: 04 Sep 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 148533874
Document Ref. No.: 4000000773-TEG
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Electrical engineering services - HIRING THE SERVICES OF AN ELECTRICAL ENGINEER TO CARRY OUT THE TECHNICAL ANALYSIS STUDY OF THE ELECTRICAL SYSTEM OF THE IHSS SPECIALIZED CENTER FOR ELDERLY CARE. DATA THAT THE STUDY MUST RECORD: • VOLTAGE: PER PHASE AND NEUTRAL LINE, TO VERIFY THE BALANCE BETWEEN PHASES AND VOLTAGE DROP. • AMPERAGE: CURRENT PER PHASE AT DIFFERENT TIMES, TO DETERMINE THE REAL LOAD FACTOR OF THE INSTALLATION • FREQUENCY: ASSESSMENT REGARDING THE NOMINAL 60HZ, AS AN INDICATOR OF NETWORK STABILITY • HARMONICS: TOTAL HARMONIC DISTORTION (THD) OF VOLTAGE AND CURRENT, GENERATED BY NON-LINEAR LOADS SUCH AS UPS, VARIATORS AND ELECTRONIC EQUIPMENT. A GENERATOR IS MORE SENSITIVE TO HARMONIC DISTORTION THAN THE COMMERCIAL GRID, WITHOUT THIS DATA, THE GENERATOR THAT IS PURCHASED MAY SUFFER OVERHEATING OF THE ALTERNATOR OR VOLTAGE INSTABILITY ONCE INSTALLED • PEAK CONSUMPTION (MAXIMUM DEMAND): THE HIGHEST VALUE OF KW AND KVA RECORDED DURING THE MEASUREMENT PERIOD AND THE TIME IT HAPPENS. TOGETHER WITH THE POWER FACTOR, THIS DATA DEFINES THE MINIMUM CAPACITY OF THE GENERATOR. SUBMIT THIS QUOTE IN A SEALED ENVELOPE AND WITH...
Source Type: (Not Defined)
Source: (Not Defined)
Modality: Minor Purchase
Stage: Reception of Offers Acquisition Type: Supply of Goods and/or Services
Offers Reception Location: Barrio Abajo
Sheet Value: Lps. 0.00
Documents
Tender Notice