Procurement Summary
Country: Finland
Summary: Electrical Design Krs Högstadieskola Och Gymnasium
Deadline: 15 May 2026
Posting Date: 10 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139324295
Document Ref. No.: 608618
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
INFORMATION ABOUT THE PROJECT Middle school The middle school will be implemented as a new building. The size class of the school is estimated at 3400 m2. The number of students in the school must be sized for 100 students and 35 staff. Among other things, the following spaces must be included - class spaces and their Ancillary facilities -kitchen facilities and dining hall -Gymnastics hall and dressing and laundry facilities -technical facilities -population shelter Sculpture hall, metal class does not need to be taken into account. The old premises will be left when the current school next door is demolished. The space to be left will come to plan e.g. new entrance, toilet facilities and technical space. (See appendix 9, handcraft wing to be left). The structures of the old lobby will be repaired for moisture damage. The building will be equipped with district heating. The location of the building can be seen from the site plan, appendix 3. The building is planned next to the existing school to be demolished and partially at the site of the school to be demolished. The chosen architect's preliminary sketch of the middle school will be delivered together with the answers to the other questions. High school The existing high school is located in the same place on the plot, when the current middle school. The high school was built in 1924-1925 and was designed by architect Lars Sonck. The building has 2 ½ floors. The size of the high school is approx. 3000 m2 and the building is marked SR-3 in the plan, so the Finnish Museum Agency will be involved in the planning. Appendix 4. Extensive microbial damage has been found in the building and all intermediate floors must be opened. In addition, all technology must be renewed. The shell of the outer envelope must be repaired and the windows renewed. We can state that the building is...
Published:09/04/2026 Deadline for submitting questions:04/05/2026 Deadline for tenders:15/05/2026
Documents
Tender Notice