"Drilling of Wells in Order to Determine Tender - 147744403

The "UZBEKGIDROENERGO" JSC (BRANCH OF "UZBEKGIDROENERGO" JSC "ORTA CHIRCHIK HYDROELECTRIC CASCADE" BRANCH) has issued a Tender notice for the procurement of a "Drilling of Wells in Order to Determine the Engineering-Geological Characteristics of the Base and the Condition of the Cementation Layer in the Right Bank Junction of the Charvoq Hpp Dam" in the Uzbekistan. This Tender notice was published on 22 Aug 2026 and is scheduled to close on 28 Aug 2026, with an estimated Tender value of UZS 539850000. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 147744403, while the tender notice number is 26120012508248 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Uzbekistan

Summary: "Drilling of Wells in Order to Determine the Engineering-Geological Characteristics of the Base and the Condition of the Cementation Layer in the Right Bank Junction of the Charvoq Hpp Dam"

Deadline: 28 Aug 2026

Posting Date: 22 Aug 2026

Other Information

Notice Type: Tender

TOT Ref.No.: 147744403

Document Ref. No.: 26120012508248

Competition: ICB

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: UZS 539850000

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_detailsLogin to see details

Tender Details

"Drilling of wells in order to determine the engineering-geological characteristics of the base and the condition of the cementation layer in the right bank junction of the Chervok HPP dam" 1. Drilling works 1 inclined well with a depth of 55 m and 75 m 1 vertical well at a depth of 130 meters. Drilling works are carried out on a scaled basis by columnar method, with a diameter of up to 95 mm. There are engineering and geological studies of the cementation curtain in the right bank junction of the dam. it is carried out in order to determine the condition (water permeability) and engineering-geological characteristics of the foundation. Includes: 1. Drilling 1 inclined well 55 m deep and 1 vertical well 75 m deep, total 130 meters of well drilling. Drilling is carried out on a scaled basis by columnar method, with drilling equipment up to 95 mm in diameter, under the condition of complete core extraction. Drilling is cementing at the right bank mark of 827.0 m It is done from the table. 1.2. Experimental filtration works are carried out by pumping water under pressure at intervals of 5 m. 1st interval — 10 atm.; 2nd interval — 15 atm.; 3rd interval and subsequent intervals — 20 atm. 1.3. Field studies at least 200 taking a scale rock sample. 1.4. Laboratory research of the obtained samples in the laboratory of Gidroproekt JSC.
Status : Eʼlon qilindi Source of funding : O‘rta Chirchiq HPPs cascade branch o‘z mablag‘lar

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for Uzbekistan

Access a comprehensive library of standard procurement documents specific to Uzbekistan. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Uzbekistan

Explore Procurement Documents for Uzbekistan


Want To Bid in This Tender?

Get Local Agent Support in Uzbekistan and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?