Procurement Summary
Country : Switzerland
Summary : Driftwood recycling seeland / mittelland
Deadline : 27 Sep 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 35745168
Document Ref. No. : 1092389
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : BKW ENERGIE AG
Bedarfsstelle/Vergabestelle BKW Energie AG
Beschaffungsstelle/Organisator BKW Energie AG, Kraftwerke, zu Hdn. von Manuel Fischer, Viktoriaplatz 2, 3013 Bern, Schweiz, Telefon 058 477 55 49,
Switzerland
Email :manuel.fischer@bkw.ch
URL :www.simap.ch
Tender Details
Driftwood recycling seeland / mittelland
- collection (recharge), transport and disposal (including, if necessary, separation of components) of the debris at the power plants in zeeland (muehleberg, niederried, kallnach, aarberg, hagneck, bruegg) [and / or] mittelland (bannwil, wynau schwarzhaeusern) .- in normal operation, the flotation material must be notified within 2 days from the bunkern / troughs at the hydroelectric power plants and recycled resp. Be disposed of (the detail specification of the current situation per hpp will be delivered to the site) .- in case of exceptional events (floods / thunderstorms), a continuous discharge must be ensured at short notice. 2.7 place of service provision lot 1: zealand (muehleberg, niederried, kallnach, aarberg, hagneck, bruegg) lot 2: mittelland (bannwil, wynau schwarzhaeusern). 2.8 duration of contract, framework agreement or dynamic purchasing system start: 01.04.2020, end: 31.03.2023 this order can be extended: yes description of the extensions: the contract can be extended twice for one year. 2.9 optitions no 2.10 award criteria price, profitability of the offer weighting 80 quality, disposal / sustainability weighting 20 2.11 are variants allowed yes remarks: the variants must contain an explicit proof of equivalence to the basic offer. And the variants have all required information about the technicaland financial assessment included. The variants are to be priced and described in the price sheet incl. The changed positions of the basic offer. 2.12 are partial offers allowed yes remarks: only per lot. Individual power plants within a lot should not be left out. Third
Documents
Tender Notice