Procurement Summary
Country: Poland
Summary: Development of the Recreational Area and Construction of a Pedestrian Bridge over the Cienka River in Klembów
Deadline: 28 Jul 2026
Posting Date: 14 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145099558
Document Ref. No.: 2026/BZP 00339167/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: PLN 347464.82
CPV Classification
45221111 - Road bridge construction work
45221113 - Footbridge construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of the order are construction works as part of the investment task titled: Development of a recreational area and construction of a pedestrian bridge over the Cienka River in Klembw. Task: Development of generally available public infrastructure through development recreational area and construction of a pedestrian bridge over the Cienka River in the town of Klembw, implemented as part of the intervention I.13.1 LEADER/Community-Led Local Development (CLLD) covered by the Strategic Plan for the Common Agricultural Policy for 2023-2027. Scope implementation of the subject of the order includes: - Facility: Pedestrian bridge; - Total length of the facility: 13.20 m; - Theoretical spans: 12.60 m; - Construction height: 0.55 m; - Type of girder structure: Combined steel and concrete; - Total width of the facility: 2.2-2.8 m;- Road width/number of lanes: 1.8-2.4 m/2;- Balustrade: 0.20+0.20=0.40 m;- Angle of intersection of the longitudinal axis with the obstacle axis: approx. 90;- Height of the gauge under the object: min. 1.2 m (2.6 m above the watercourse). Characteristics of the pedestrian road on the access road to facility:- Width of pedestrian path: 1.8 m;- Roadside: 0.5+0.5=1.0 m;- Width of safety lane: 1.8 m;- Roadside...
Documents
Tender Notice