Procurement Summary
Country: Poland
Summary: Development of Design Documentation and Implementation of Construction Works in the Field of the "Energy" Subsystem - Traction Network on Railway Line No. 85, Section. Warsaw - Łódź
Deadline: 31 Aug 2026
Posting Date: 01 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144326552
Document Ref. No.: 449352-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
34632300 - Electrical installations for railways
45232220 - Substation construction work
45234100 - Railway construction works
45231400 - Construction work for electricity power lines
71321000 - Engineering design services for mechanical and electrical installations for buildings
71322000 - Engineering design services for the construction of civil engineering works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Development of design documentation and implementation of construction works in the field of the "Energy" subsystem - traction network on railway line No. 85, section. Warsaw - Łódź The subject of the Order is the development of Design Documentation and the implementation of works construction works aimed at building a traction network, including power supply elements, autotransformer cabins and control of HSR traction network connectors on the section Kotowice - Węzeł Kolejowy CPK - Łódź and on sections connecting to the state existing/implemented by PKP PLK, together with the reconstruction of the existing PKP PLK infrastructure at the connection points to the extent necessary. Moreover, the Contractor is obliged to obtain an EC verification certificate of the Energy subsystem, issuing appropriate verification declarations and preparing all necessary documentation necessary to obtain permission to operate the Energy subsystem for an indefinite period. The operational and design speed of the line is 350km/h. The subject of the Order is the development of Design Documentation and the implementation of construction works aimed at building a traction network, including power supply elements, autotransformer cabins and control of HSR traction network connectors. on the Kotowice - CPK Railway Junction - Łódź section and on the sections of the connection to the existing condition/implemented by PKP PLK along with the reconstruction of the existing PKP PLK infrastructure at the connection points in...
Document Type: Contract Notice Reference Number: FZA.2510.57.2025/MG/84 Contract Type: works Authority Type: body-pl Doc Title: Development of design documentation and implementation of construction works in the field of the "Energy" subsystem - traction network on the line railway no. 85 section Warsaw - Łódź Dispatch Date: 2026-06-29 Publish Date: 2026-07-01 Submission Date: 2026-08-31
Documents
Tender Notice