Procurement Summary
Country: Belgium
Summary: Designation of a Design Office for Carrying out a Study of Orientations Relating to the Renovation of the Current System of Renewable Production of the Central Boiler of the Uliege (Site B10), ....
Deadline: 22 Aug 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 122269293
Document Ref. No.: 443885-2025
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Designation of a design office for carrying out a study of orientations relating to the renovation of the current system of renewable production of the central boiler of the Uliege (site B10), ....
This service market relates to the appointment of a design office specializing in techniques Specials, and particularly in large -scale heat production, as part of the renovation of the current renewable production system of the Central Colet de l'Uliege on the Sart Tilman campus (B10 site).
This project is part of the Uliege Transition roadmap. The requirements relating to the installation of decarbonated means of productions will be studied in a framework of energy optimization and reduction of the carbon footprint of the central boiler room of Sart Tilman (CCST) while respecting the structural, technical, planning and planning constraints organizational site.
The service mission is structured as follows:
- Farm edge - Orientation studies
* Phase 1 - Realization of a complete technical study of renovation solutions (including the study of possible complete or partial replacement - see also the guidance note) of the current system of renewable production of the central boiler room of Sart-Tilman (abbreviated CCST afterwards) and comparative analysis of the scenarios on the basis of technical, economic and environmental criteria. This study should allow the Uliege to validate the scenario to remember for the renovation of the CCST.
* Phase 2 - Based on the scenario chosen by the Uliege, drafting of the technical performance book and the layouts and diagrams of principles allowing the ULiege to launch a march...
Type document: Contract instructions
Reference Number: PPP0O5-1304/5463/2543S
Type contract: Services
Authority Type: Body-Pl
Doc Title: Designation of a design office for carrying out a study of orientations relating to the renovation of the current system of renewable production of the boiler room Central of the Uliege (site B10), as well as assistance to the contracting authority for monitoring the execution of the project with a transition objective
Dispatch Date: 2025-07-04
Publish Date: 2025-07-08
Submission Date: 2025-08-22
Documents
Tender Notice