Procurement Summary
Country: Poland
Summary: "Design and Infrastructure" under the Project "Construction of Ertms/Gsm-R System Infrastructure on Pkp Plk S.A. Railway Lines under Npw Ertms - Phase Ii"
Deadline: 06 Jul 2026
Posting Date: 03 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142543522
Document Ref. No.: 379729-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: PLN 597818366.25
CPV Classification
45000000 - Construction work
71322000 - Engineering design services for the construction of civil engineering works
32524000 - Telecommunications system
32520000 - Telecommunications cable and equipment
45200000 - Works for complete or part construction and civil engineering work
45232340 - Mobile-telephone base-stations construction work
45314000 - Installation of telecommunications equipment
45231400 - Construction work for electricity power lines
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
"DESIGN AND INFRASTRUCTURE" UNDER THE PROJECT "CONSTRUCTION OF ERTMS/GSM-R SYSTEM INFRASTRUCTURE ON PKP PLK S.A. RAILWAY LINES UNDER NPW ERTMS - PHASE II" [1] The subject of the Order is the conclusion of a Framework Agreement for the comprehensive construction of facilities radiocommunication facilities, radiocommunication and regenerator facilities, and for the comprehensive construction of cable ducting with an optocommunication cable and/or for the completion of previously commenced works. The comprehensive construction of the facility includes the following: elements: 1) obtaining a site in the field for the location of the facility; 2) preparation and approval of all documentation; 3) obtaining the required opinions, arrangements, approvals, conditions, decisions and permits necessary to implement the subject of the order; 4)construction facility (including equipment: accompanying system, teletransmission system); 5) construction of a fiber optic connection; 6) construction of an energy connection; 7)conducting necessary tests; 8) preparation of as-built documentation; 9) completion of the whole works confirmed by Final Acceptance; 10) obtaining an occupancy permit. The subject of the Executive Order may be all of the Works listed above, or part of these Works. [2] The detailed scope of the subject matter of the Order is included in PFU-R constituting Volume III SWZ-R. [3] The Ordering Party envisages awarding the contracts referred to in Art. 388 point 2) letter c) Act. The scope of orders referred to in Art. 388 point 2) letter c) Acts and conditions for...
Document Type: Contract Notice Reference Number: 9090/IRZR1/02205/02406/26/P Contract Type: works Estimated Value: 597818366.25 - PLN Doc Title: "DESIGN AND INFRASTRUCTURE" UNDER THE PROJECT "CONSTRUCTION OF THE ERTMS/GSM-R SYSTEM INFRASTRUCTURE ON RAILWAY LINES OF PKP PLK S.A. UNDER NPW ERTMS - PHASE II” Dispatch Date: 2026-05-29 Publish Date: 2026-06-03 Submission Date: 2026-07-06
Documents
Tender Notice