Procurement Summary
Country: Poland
Summary: Design and Implementation of Reconstruction Works of the Traction Network on Railway Line No. 62 on the Tunel - Wolbrom Section as Part of the Project "Unblocking the Basic Export Routes from Upper Silesia - "Pra...
Deadline: 10 Apr 2026
Posting Date: 26 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138503914
Document Ref. No.: 209869-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
71322000 - Engineering design services for the construction of civil engineering works
45200000 - Works for complete or part construction and civil engineering work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45234100 - Railway construction works
45234000 - Construction work for railways and cable transport systems
45231400 - Construction work for electricity power lines
45100000 - Site preparation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Design and implementation of reconstruction works of the traction network on railway line No. 62 on the Tunel - Wolbrom section as part of the project "Unblocking the basic export routes from Upper Silesia - "Pra...
The subject of the order is the design and execution of reconstruction works of the overhead contact line double-track railway line No. 62 on the section on track No. 1 from km 2.288 to km 6.681 and from km 9.120 to km 14.282, on track No. 2 from km 2.280 to km 6.681 and from km 9.120 to km 16.675. The entire subject of the order includes the preparation of: 1) design documentation necessary for the proper execution of all construction works and obtaining all required opinions, arrangements, approvals, conditions, decisions and permits necessary for the implementation of the subject of the order; 2) all construction works in accordance with the scope of the order on the basis developed by the Contractor and approved by the Ordering Party's design documentation referred to in the above-mentioned point 1, and all preparatory works necessary to perform the scope of the Agreement and perform all activities required by law; 3)conducting a conformity assessment of the "Energy structural subsystem covered by the scope of the contract for each stage (design, construction and final tests of the subsystem) The order covers the design and reconstruction of the traction network on the double-track railway line No. 62 in the following locations: • from km 2.288 to km 6.681 and from km 9.120 to km 14.282 in track no. 1; •from km 2, 280 to km 6, 681 and from km 9.120 to km 16.675 on track no. 2. A detailed description of the subject of the order can be found in Volume III SWZ - PFU. Design and implementation of reconstruction works of the traction network on the railway line Yeah. 62 episodes...
Document Type: Contract Notice
Contract Type: works
Authority Type: pub-undert
Doc Title: Design and implementation of reconstruction works of the traction network on railway line No. 62 on the Tunel - Wolbrom section as part of the project "Unblocking the basic export routes from Upper Silesia - "Works on the lines railway no. 62, 660 on the section Tunel - Bukowno - Sosnowiec Płd. - Stage II"
Dispatch Date: 2026-03-25
Publish Date: 2026-03-26
Submission Date: 2026-04-10
Documents
Tender Notice