Procurement Summary
Country: Poland
Summary: Design and Implementation of Reconstruction Works of the Traction Network on Railway Line No. 62 on the Tunel - Wolbrom Section as Part of the Project "Unblocking the Basic Export Routes from Upper Silesia" - "Pra...
Deadline: 11 Feb 2026
Posting Date: 21 Jan 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 134051632
Document Ref. No.: 43815-2026
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Design and implementation of reconstruction works of the traction network on railway line No. 62 on the Tunel - Wolbrom section as part of the project "Unblocking the basic export routes from Upper Silesia" - "Pra... The subject of the order is the design and execution of reconstruction works of the traction network on the double-track railway line No. 62 on the section on track No. 1 from km 2.288 to km 7.310 and from km 8.722 to km 14.282, on track No. 2 from km 2.280 to km 7.310 and from km 8.436 to km 14.208. The entire subject of the order includes execution: 1) design documentation necessary for the proper performance of all construction works and obtaining all required opinions, arrangements, approvals, conditions, decisions and permits necessary for the implementation of the subject orders; 2) all construction works in accordance with the scope of the order on the basis of the design documentation developed by the Contractor and approved by the Ordering Party, referred to in the above-mentioned. point 1, and all preparatory works necessary for performance of the scope of the Agreement and performance of all activities required by law; 3)conducting a conformity assessment of the "Energy" structural subsystem covered by the scope of the order at each stage (design, construction and final tests of the subsystem) Order includes the design and reconstruction of the traction network on the double-track railway line No. 62 in the following locations: •from km 2.288 to km 7.310 and from km 8.722 to km 14.282 on track no. 1; •from km 2.280 to km 7.310 and from km 8.436 to km 14.208 on track no. 2. Design and implementation of reconstruction works of the traction network on railway line No. 62 on the Tunel - Wolbrom section as part of the project "Unblocking the basic extraction routes...
Document Type: Contract Notice Contract Type: works Authority Type: pub-undert Doc Title: Design and implementation of reconstruction works of the traction network on railway line No. 62 on the Tunel - Wolbrom section as part of the project "Unblocking the basic routes exports from Upper Silesia" - "Works on railway lines no. 62, 660 on the section Tunel - Bukowno - Sosnowiec Płd. - Stage II" Dispatch Date: 2026-01-20 Publish Date: 2026-01-21 Submission Date: 2026-02-11
Documents
Tender Notice