Procurement Summary
Country: Poland
Summary: Design and Execution of Works as Part of the Task Entitled: "Installation of the Ertms/Etcs Level 2 System on Railway Lines No. 133 and 134, Section Sosnowiec Jęzor - Krakow Głowny, and Railway Line No. 91, Section K...
Deadline: 24 Apr 2026
Posting Date: 27 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138565729
Document Ref. No.: 213235-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
71322000 - Engineering design services for the construction of civil engineering works
45100000 - Site preparation work
45200000 - Works for complete or part construction and civil engineering work
45300000 - Building installation work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45234000 - Construction work for railways and cable transport systems
45234100 - Railway construction works
45314000 - Installation of telecommunications equipment
45314300 - Installation of cable infrastructure
45314310 - Installation of cable laying
45234115 - Railway signalling works
45231400 - Construction work for electricity power lines
50000000 - Repair and maintenance services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Design and execution of works as part of the task entitled: "Installation of the ERTMS/ETCS level 2 system on railway lines No. 133 and 134, section Sosnowiec Jęzor - Krakow Głowny, and railway line No. 91, section K...
1. The subject of the Order is the design and execution of works for the task titled: "System installation ERTMS/ETCS level 2 on railway lines no. 133 and 134 section. Sosnowiec Jęzor - Krakow Głowny and railway line no. 91 section. Krakow Głowny - Podłęże The basic scope includes the preparation of the following elements: 1) Design documentation, including: a) preliminary documentation, b) inventory, c) designs construction works together with the performance of author's supervision, d) obtaining the necessary administrative decisions, e) developing executive designs, f) developing as-built documentation, including as-built geodetic documentation, g) other documentation specified in Volume III of the SWZ PFU, 2) all construction works in accordance with the scope of the order on the basis of the design documentation developed by the Contractor and approved by the Ordering Party, referred to in the above-mentioned point 1, and all preparatory works necessary to perform the scope of the Agreement and all activities required by law; 3) carrying out the conformity assessment process of the "Command and Signaling - Trackside" structural subsystem at each stage (design, construction and final tests of the subsystem) and submitting the appropriate EC verification declarations and EC verification certificates for the subsystems. 4) obtaining permission for approval for operation of the Control and Signaling structural subsystem - trackside device issued by the President of the Office of Rail Transport. 2. Law of Option: Law of Option No. 1 covering zoo...
Document Type: Contract Notice
Reference Number: 9090/IREZA3/03032/02578/25/P
Contract Type: works
Authority Type: pub-undert
Doc Title: Design and execution of works as part of the task entitled: "Installation of the ERTMS/ETCS level 2 system on railway lines No. 133 and 134, section Sosnowiec Jęzor - Krakow Głowny and railway line no. 91 section Krakow Głowny Podłęże.
Dispatch Date: 2026-03-26
Publish Date: 2026-03-27
Submission Date: 2026-04-24
Documents
Tender Notice