Procurement Summary
Country: Poland
Summary: Design and Execution of Construction Works for the Project "Construction of a Selective Municipal Waste Collection Point for Residents of the Przykona Commune"
Deadline: 07 Aug 2026
Posting Date: 24 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145818608
Document Ref. No.: 2026/BZP 00358676/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
71222000 - Architectural mapping services for Rural & Urban areas
71320000 - Engineering design services
45111200 - Site preparation and clearance work
45111291 - Site-development work
45200000 - Works for complete or part construction and civil engineering work
45213270 - Construction works for recycling station
45220000 - Engineering works and construction works
45222000 - Construction work for engineering works except bridges, tunnels, shafts and subways
45222100 - Waste-treatment plant construction work
45400000 - Building completion work
42900000 - Miscellaneous general and special-purpose machinery
71300000 - Engineering services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of the order includes the preparation of design documentation together with the necessary arrangements and the performance of construction and assembly works based on it, consisting in the construction of a Selective Municipal Waste Collection Point for the residents of the Przykona commune, together with with the necessary equipment and infrastructure. The planned PSZOK will be located in the area belonging to the Przykonadziaka commune with geod. no. 71 obrb 0026 Wichertw. A detailed description of the subject of the order (scope of works) and the conditions for their implementation are specified in the Program Functional and Utility together with maps and land development concept, called technical documentation, which constitutes Annex No. 1 to the SWZ. The subject of the contract must be performed in accordance with the PFU documentation and applicable legal regulations, construction practices, technical knowledge, concluded a contract with the Ordering Party, arrangements with the Ordering Party made during the implementation of the subject of the contract. A detailed description of the subject of the order is also specified in the draft provisions of the contract, which will be introduced into the contract, constituting Annex No. 5 to the SWZ.
Documents
Tender Notice