Procurement Summary
Country: Poland
Summary: Design and Construction of Distributed Modules Constituting Components of the National Road Traffic Management System on the S17 Expressway, Divided into Two Parts.
Deadline: 22 Jun 2026
Posting Date: 18 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141517767
Document Ref. No.: 337881-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45233290 - Installation of road signs
45314300 - Installation of cable infrastructure
45231400 - Construction work for electricity power lines
71320000 - Engineering design services
51610000 - Installation services of computers and information-processing equipment
48781000 - System management software package
34970000 - Traffic-monitoring equipment
45232300 - Construction and ancillary works for telephone and communication lines
80510000 - Specialist training services
34924000 - Variable message signs
34942000 - Signalling equipment
32562000 - Optical-fibre cables
34992200 - Road signs
45314000 - Installation of telecommunications equipment
34928300 - Safety barriers
42414310 - Mobile lifting frames
72250000 - System and support services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Design and construction of distributed modules constituting components of the National Road Traffic Management System on the S17 expressway, divided into two parts. The subject of the order is the design and construction of distributed modules constituting components National Road Traffic Management System. The order is a continuation of a previously conducted procedure, during which part of the scope was resolved, while the parts indicated below (Part 2 and Part 3) were invalidated. In a relationship Due to the above, in order to maintain the consistency of the documentation and avoid duplicating the numbering of the part that has already been decided, the original numbering of the order part was left. The order is divided into the following parts: Part 2: S17 expressway Garwolin-Kurów, section Garwolin - border of the Masovian and Lublin voivodeships: 1. section Garwolin (end of the bypass) - Gończyce (end of the bypass), from approx. km 49+973 to approx. km 62+200; 2. Gończyce section (end of the bypass) - voivodeship border Masovia and Lublin, from approx. km 62+200 to approx. km 75+212. Part 3: S17 Garwolin-Kurów expressway, section border of the Masovian and Lublin voivodeships - "Sielce" junction (currently "Kurów Zachód", without junction): 1. Voivodeship border section Masovia and Lublin - the "Skrudki" junction (together with the junction); 2. section "Skrudki" junction (without a junction) - "Sielce" junction (currently "Kurów Zachód", without a junction); 3. section of access to the bridge crossing on the Vistula River in...
Document Type: Contract Notice Contract Type: works Authority Type: cga Doc Title: Design and construction of distributed modules constituting components of the National Road Traffic Management System on the S17 expressway, divided into two parts. Dispatch Date: 2026-05-15 Publish Date: 2026-05-18 Submission Date: 2026-06-22
Documents
Tender Notice