Procurement Summary
Country : Switzerland
Summary : Demolition Activities, Site Cleanup, Preparation, Construction, and Installation for the Renovation Existing Restrooms
Deadline : 20 Jul 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 104052020
Document Ref. No. :
Financier : Other Funding Agencies
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Tenders are invited for Demolition Activities, Site Cleanup, Preparation, Construction, and Installation for the Renovation Existing Restrooms in the Us Mission Building in Geneva
Restrooms Renovation
Solicitation for U.S Mission Restrooms Renovation
Demolition Activities
Remove all fixtures (toilets, urinals, sinks, mirrors, partitions, etc.).
Demolish and dispose of non-load-bearing walls as specified (see plans) and create a new opening in a 30 cm tick wall for new restroom access (consulting a structural engineer report)
Remove and properly dispose of plumbing lines, electrical wiring, and HVAC components, etc.
Ensure safe removal and disposal of hazardous materials in compliance with local regulations.
Site Cleanup
Clear and dispose of all demolition debris.
Clean the site to prepare for construction.
New Installation
Preparation
Inspect and repair or upgrade structural elements (walls, floors, ceilings) as necessary.
Install new plumbing lines, electrical wiring, and HVAC systems.
Ensure compliance with all relevant codes and standards, including ADA requirements.
Construction and Installation
Construct new walls, partitions, and any necessary structural modifications.
Install new flooring (tiles, anti-slip surfaces, etc.).
Install wall finishes (tiles, paint, panels, etc.).
Install new restroom fixtures (toilets, urinals, sinks, faucets, mirrors, etc.).
Install new partitions and dividers for privacy.
Install new drop ceiling.
Install new electrical fixtures (lighting, hand dryers, outlets, etc.).
Install new HVAC components for proper ventilation.
Implement water-saving technologies and fixtures as specified.
Finishing Work
Apply final finishes (paint, trim, accessories).
Conduct a thorough cleaning of the new restroom facilities.
Test all systems (plumbing, electrical, HVAC) to ensure proper functionality.
Documents
Tender Notice