Procurement Summary
Country: Poland
Summary: Delivery of Gym Equipment as Part of the Project Entitled: "Construction of an Indoor Swimming Pool in the City of Otwock"
Deadline: 31 Jul 2026
Posting Date: 24 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145817662
Document Ref. No.: 2026/BZP 00359526/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
37440000 - Fitness equipments
37442000 - Weight and resistance training equipment
37441000 - Aerobic training equipment
37441100 - Treadmills
37441300 - Stationary bicycles
37441400 - Rowing machines
37442100 - Dumbbells
37442200 - Barbells
37442400 - Weight benches or racks
37441700 - Exercise balls
37421000 - Gymnasium mats
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The scope of the order includes the delivery, assembly and commissioning of gym equipment, as well as technical supervision, management and control of work on the installation and commissioning of the equipment. A detailed list of the equipment is included in Appendix No. 1, list of equipment. Mont equipment will be carried out on the basis of the arrangement plan constituting Annex No. 2. After the installation and commissioning of the equipment, the Contractor will prepare as-built documentation. The equipment and accessories will be brand new and free from the rights of third parties or entities. The Contractor is obliged to deliver the subject of the order at his own expense and risk, unload it in the building in a place designated by the Ordering Party, and assemble and commission it in consultation with the contractor. The delivered devices must be put into operation by the Contractor in the presence of the Ordering Party and demonstrated failure-free operation in accordance with the specificity of individual devices. The description of the subject of the order specifies: 1) List of equipment 2) Layout plan 3) Requirements regarding the equipment Documents listed above, specification the terms of the order and the Contractor's tender offer constitute an integral part of the proceedings and are stored in ...
Documents
Tender Notice