Procurement Summary
Country: Poland
Summary: Delivery and Installation of 1 Stationary System of a Device Recording Average Speed on a Specific Section of Provincial Road No. 559 on the Brudzień Duży - Sikórz Section - Procedure No. 134/26
Deadline: 18 Aug 2026
Posting Date: 14 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145102576
Document Ref. No.: 484644-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
38410000 - Metering instruments
51210000 - Installation services of measuring equipment
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Delivery and installation of 1 stationary system of a device recording average speed on a specific section of provincial road No. 559 on the Brudzień Duży - Sikórz section - procedure no. 134/26 1. The subject of the order is: Delivery and installation of 1 system a stationary device recording the average speed on a specific section of provincial road No. 559 on the Brudzień Duży - Sikórz section - procedure no. 134/26 2. A detailed description of the subject of the order can be found in Part IV of the SWZ - Description of the Subject of the Order (together with Annex No. 1 Data exchange standard for recording devices). 3. If the occupation of the road lane will affect road traffic or limit visibility on the road or require changes to the existing traffic organization vehicles or pedestrians, the Contractor should prepare, at his own expense, a temporary traffic organization project to secure the works carried out in the road for the duration of the services in accordance with the Regulation of the Minister of Infrastructure of September 23, 2003 in on detailed conditions for road traffic management and supervision over this management (Journal of Laws No. 177, item 1729). All costs related to the introduction of traffic organization will be borne by the Contractor. Depending on your needs and service progress the traffic organization design should be updated by the Contractor on an ongoing basis. The traffic organization design for the duration of the services must be approved by the traffic management authority (Department...
Document Type: Contract Notice Contract Type: supplies Authority Type: body-pl-ra Doc Title: Delivery and installation of 1 system of stationary device recording average speed on a specific section of provincial road No. 559 on the section Brudzień Duży - Sikórz - procedure no. 134/26 Dispatch Date: 2026-07-13 Publish Date: 2026-07-14 Submission Date: 2026-08-18
Documents
Tender Notice