Procurement Summary
Country : Lithuania
Summary : Currently, Electrical Inlets from Different Transformer Transformers-T1 and T-2 are Installed on the Facility. each Introduction is Made up of Two Fider (Nourishing Cables) and is Divided into ....
Deadline : 25 Jun 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 120322456
Document Ref. No. : 1002/3100/423086
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Currently, electrical inlets from different transformer transformers-T1 and T-2 are installed on the facility. Each introduction consists of two fider (nourishing cables) and is divided into ...
currently located on the object and operates electrical inlets from different transformer tranformers-T1and T-2. Each introduction is made up of two fider (nourishing cables) and is divided into two 0.4kV sections. In this way, a total of two 0.4KV sections through both transformers. Equipped with a manual reserve activation system with two fuse picks blocks and soluble fusesfor the protection of the lines. It is planned to fully replace the manual reserve on the system by dismantling the existing worn fuse blocks and installing new devices in the automatic reserve switching function. Both introductory distribution panels ISS-1 and ISS-2 electricity users areDivide through two sections of 0.4kv synuts. It is estimated that after the reconstruction, each strain section instead of the manual fuse picks will have a motorized three -position pick, which will be controlled from the automatic reserve (ARA) on the system.For the introduction, the relevant section will be switched to power from another inlet to ensure the electricity supply to the consumer. After the failure is eliminated, the system returns to its original position. The user will be able to make the relevant switches on the panel facade to select which inlet of each section will be the main one and whichReserve. Normally, the system must operate in automatic mode, but it is provided that it will be possible to switch to manual control mode. An automatic reserve on the system (ARI) with a programmable logical controller is expected. Parameters of the power grid are controlled by voltage controlin relay.
NUTS codes: Estimated value (EUR): 0.
above or below international purchase value: below
tenders or applications to participate in procurement: 25/06/2025 08:00
Call Dispatch:
Explanatory Notes: 22/06/2025 16:00Explanatory: Yes
Date of Disconnection: 25/06/2025 08:30
Allow Suppliers in the System to bring interest: Yes
Purchase is divided into parts (DPS - categories): not
me months or years, except for extensions: 12 Mons
Days or months: 90 Days
EU funding: No
allowed alternative proposals: No
Date of Post and/or Call: 04/06/202510:30
Documents
Tender Notice