Procurement Summary
Country: Canada
Summary: Contractor - Install 2Nd Fire Exit Door and Relocate Basement Service Room Door
Deadline: 20 Aug 2026
Posting Date: 06 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146637578
Document Ref. No.: GOC6615269-CT-HAM
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Scope of Work/Overview:PSPC Fire Inspection In the 1st floor CBSA space has identified a second exit is required. During a recent inspection it was mentioned that the second exit could be through the kitchen to the shipping/receiving area, but there are only roll up doors there that don-t meet the requirements of NBC for an exit door. Configure CBSA space on the 1st Floor to allow for at least two exits, ensure adequate means of egress to access the exits, and install additional exit signage as required. This would require a door to be installed along with signage in the CBSA loading dock area. Also identified was a Service room in the basement that opens directly into the Stairwell near the elevator. The configuration of the space should be modified to ensure the service room does not open directly into the stairwell.All work to be completed by September 25, 2026.
Reference Number : 0000329220 Location : Canada, Ontario, ON - 31 - Waterloo Job Location : 15 Duke St., Kitchener, Ontario Description : Scope of Work/Overview:PSPC Fire Inspection In the 1st floor CBSA space has identified a second exit is required. During a recent inspection it was mentioned that the second exit could be through the kitchen to the shipping/receiving area, but there are only roll up doors there that don’t meet the requirements of NBC for an exit door. Configure CBSA space on the 1st Floor to allow for at least two exits, ensure adequate means of egress to access the exits, and install additional exit signage as required. This would require a door to be installed along with signage in the CBSA loading dock area. Also identified was a Service room in the basement that opens directly into the Stairwell near the elevator. The configuration of the space should be modified to ensure the service room does not open directly into the stairwell.All work to be completed by September 25, 2026.
Documents
Tender Notice