Procurement Summary
Country: Hungary
Summary: Contract notice: Telecommunications services
Deadline: 05 Aug 2019
Posting Date: 08 Jul 2019
Other Information
Notice Type: Tender
TOT Ref.No.: 34489711
Document Ref. No.: 316525-2019
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
64200000 - Telecommunications services
64210000 - Telephone and data transmission services
72318000 - Data transmission services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Telecommunications services
Description: Contract notice: Telecommunications services
Authority Type: Body governed by public law
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 64200000, 64200000, 64210000, 72318000, 64200000, 64210000, 72318000
CPV Description: Telecom services.
Data transmission services.
Data transmission services.
Secure data protection lines
Reference Number: EKR000823892019
Unsecured individual data lines of data lines in the framework of service providers (site: Internet sites of sites and sites) oesekekoe-t- lines, IIrepository of epiel lines) is the repository of the Propagation Force (AK) as defined in II.2.4) and in the Kezzeszerzesi documents (KD), for the 48-month period of validity
Main Site: Co-location of the Co-ordinator of the Co-ordinator and the locations of Budapest in Budapest (Budapest, HU110), or the location of the AK chapel (ROMANIA, RO124) and Kolozsvar (ROMANIA, RO113) koezoett
The lines of the line and the lines for collecting the sites are provided by the Resource Force (AK), for the 48-month period, in the framework of the service contract, along with the principal quantities to be delivered.
Data lines to be deposited with the winner (AT) and secured by the contractor: Point-to-Ounce-Kunigunda Path and Brody Sandor Street Cassette - 2x1 Gbit / s - OccasionTechnology: DWDM
- Point-to-Point Oesetto-Decked by Kunigunda Road and Naphegy Ter Koezoett - The Two Locations Have Held the Services Provided by a Pointless Point-to-Point Booth Test, 2x10 Gbit / s - Applied Technology: With Optical Sets
- High Acid Range belfoeld sites koezoett - 200 Mbit / s Kunigunda road and Dunavirag street sites koezoett - appliedechnology: L2VPN
- MPLS base course for the larger Kuelfoeld sites - the Kunigunda road and the Szekelyudvarhely (Erdely, Romania), and Kolozsvar (Erdely, Romania) koezoett - iranyon 100 Mbit / s symmetric acid width backing (back and forth) HD / SD-SDI coupler with supercharger and vice-versa devices - applied technology: L3VPN (or Corresponding)
- Berelt Line Internet at Kunigunda uti (4-10 Gbit / s) and Naphegy teri (1Gbit / s) - connected to the braided line Internet to provide DDoS tamadas anti-hacking system (AT property
Domain Nev Service (DNS) - Assembled DNS server systems with MTVA 3 publicly available, highfeaturing poolu, DNS service hunts
- Sound lines - 6 sites at Fővinform, MAVinform, Janoshegy, Zeneakademia, MŰPA and OMSZ sites, and Kunigunda Paths site for coezoetti sound equipment with a symmetrical acid-width braided line with sporadic eschatos, veg devices and related content,
- One Internet Service Provider for Two Bounded Lines 2 Budapest vegpontone which has a symmetrical minimum of 10 Mbit / s
- L3VPN ("zart") range of MTVA and science / cybercrime - The Videk Science and MTI service corpses - L3VPN series
Above the above activities - kueloenoesen queue of data lines in the DDoS tamadas fight dogs - communicate at the lowest level in Hungarian at Kepep, at III.1.3) M2) alp
AK pays attention to the requirements of 321/2015. (X. 30.) Government Decree 46 (3), according to which AK accepts things equal to the things and technical solutions indicated in the documents of the Co-Purchase Documents (KD), if it provides the agreed unified technical and qualitative agreementand in the case of an affair of equal-thing, elder, ticket, patent, action, person, type or specific or manufacturing process, AT equals the equinox - in the case of a squirrel.
Further tricks in the KD.
It is not possible to have a timer, an underdog, and you cannot retrieve your correct proofis a farmer with whom Kbt. Any of the grounds for exclusion set out in Section 62 (1) (a) to (q) and (2) (a) to (b) shall apply. The exclusions referred to in Article 62 (1) (a) to (q) and (2) (a) to (b) shall be subject to the authority of the court or to the expulsion of the exchequer.he was in trouble. [PPA. Section 74 (1)]
A Kbt. The exclusions referred to in Section 62 (1) (b) and (f) of the Excluded Act shall be opposed to the non-keruel exclusion of the hirer, sub-subordinate or appropriately reader, if the Koezbekerzesi Hatosag is in Section 188 ( (4) subject to the provisions of paragraph (s), or annak megadasadasara iranyulo koezigazgatasi, in the case of the bourgeoisie in accordance with Section 188 (5) of the Bishop, stated that the hunted farmer had made intentions prior to the announcement of the newsletter or the counterfactual, which would adequately justify the trustee. [PPA. Section 64]
Verification Mod:
For the Proponent of 321/2015. (X.30.) According to Section 1 (1) of the Government Decree, the Government Decree no. In accordance with the provisions of section (2-4), a single European Co-Purchase Document (EECD) must be submitted in advance to prove that the Kbt does not belong. Section 62 (1) and (2), the power of the cave. The EECD must be submitted on an electronic form available in the Electronic Co-Purchasing System (EKR). Electronic space in the EDFThe announcement is made by the host operator who has submitted the report. (X. 30.) Government Decree (3) (3), the Koezoes journalists have to install the EECD according to Section 3 (5) of the Government Decree.and, if applicable, further timer (s) prior to the prior performance of the report, the timeliness of the update is based on 321/2015. (X. 30.) Government Decree, Article 1 (2), the Government Decree III. In accordance with the provisions of section (8, 10 and 12-16), you have to verify / prove that you do not have / have the power to rule out the reasonsunder the Kbt. (4) - (5) of the Act. 41 / A. - (1)
Reputation force does not seek from the seized journalist (s) at 321/2015. (X. 30.) Government Decree III. Chapter III (s) of the case if you add non-linearity to Chapter III. Not mentioned in the chapter, reasons for exclusion are true for databases published in EEKD or earlier in the newsletterin front of the real-world proofs [Kbt. Section 69 (11) - (11a)]
A 321/2015. (X. 30.) Government Decree III. I can verify the authentication modalities defined in Chapter V of the Government Decree, if he / she proves that he / she complies with the requirements laid down by the qualified journalist in the notes of the hired economic actor.in case of hosts, the timeliness of the tactical certificates is authentic in the case of the 321/2015. (X. 30.) Government Decree VI.
In the timeline, the elec- tricity of the electronic form available in the EDF should include a statement by the subscriber that he does not take great care of the author's performance in the Kbt. Section 62 (1) - (2) of the Act on Exclusion of Exclusion of Subordinate Groundsalkozot. [PPA. Section 67 (4)]
In the case of expulsion reasons, the certificates issued prior to the start of the trial are also available (usable) as long as the contents of the data sheets or data are valid [321/2015. (X. 30.) Government Decree (1) (7)]
The qualifying material of the penzuegyi and the host can be proved in all respects: tz the single European Co-Purchase Document (EECD) - an electronic form available in the EDF - must provide a proof of compliance with the foregoing. for Testing [321/2015. (X. 30.) Korm. (Kr.) Section 1 (1), - 5] with reference to the timeliness (AK) of Chapter IV.
It does not look for any information on the file. trembled filets information is sufficient (it is sufficient to make a statement according to ect. IV of the EECD).
In the light of the conscientious aspects, it is considered to be the most favorable to the timekeeper and, if necessary, the other timekeeper (s) of the eljaras result prior to making a solo effort, on the basis of the news. (2) in accordance with the provisions of Section IV. In section (Section 19) we haveit must properly verify / certify that it meets (or does) the appropriate co-operation with the newsletter. Article 69 (11) of the Act IV. Not mentioned in the chapter on proper database for real databases, and the host acted on them in the EECD.In the case of a farmer who is settled in the zagon, the timeliness of the truths is authentic in the Kr. VI.
According to the Kr. Decree - the timeliness Kbt. (Article 4 (4) para.kozo, kezo-purchasing (in all respects: secured data lines) is a rumor of a low traffic ado nelkuel samititel vice-verse, if applicable, in a single european coezebacking document, reluctantly telling when it was running or when it started to work, these data are available.
If it isthe editor does not have the above-mentioned document because he / she is in the legal form of an art form, which is not possible due to the declaration of the arbitration, but instead of the appropriate proof-of-proof and proof-of-proof certificate, he can prove a penzuegyi and host suffix with any other document or document considered appropriate by the Newsletter. . The erinteIn addition, an additional compassionate adviser seeks to find a legal form of legal form which, in the light of the statement on the treaty, is not feasible and can be used instead of the appropriate moderated modalities of this point. [Cr. Section 19 (3)]
The wise of the righteousThe proofs issued prior to the beginning of the trial can also be entered (used) for the benefit of the owner as long as the content of the data or data contained in the real documents is genuine [Kr. Section 1 (7)]
1) This is the one that is used to perform kerre with the EKR, and the Kbt. 40-41 / C-, or 424/2017. (XII.19.) Governmental Co-Procurement Documents (KD) in the EDFcan be eliminated, Reward Force (AK) is in exclusive contact with the economic actors (GSZ) / timekeepers (AT). (XI. 6.) MvM decree based on the NEKSZT National Electronic Coaching Service (http://nekszt.hu) downloaded
Instructions on the use of the EDF: https://ekr.gov.hu/portal/tamogatas i http: //nekszt.hu/tamogatas/ cimeken
2) Declarations to be made in the form of an electronic form to be submitted to the EDF are made by the ATMs of the Kezoes Agents / Capacity Receivers (the declarations of the declarations made in this name are the responsibility of the proxy and of the statements made by the proxy). The electronic submissions of data in the sub-area correspond, this is the standardly, however, does not insist on the koezoes timekeepers Kbt. Article 35 (6), paragraph 3). read-out sheet (EDF form with excerpts), which identifies the matching items of item II.2.5) b. the latest price / aromatic TCO models (as per KD)
c. the Kbt. 66 (2) and 66 (6) given e(d) of Article 65 (7). in the case of koezoes, you have a one-time shop for your work. AT (Subcontractor / Capacitive) Alairasi Cambodia / Uegyved / Chamber of Lawyers with Subordinate Legislation, f. if AK donation is not available from the free electronic database: extract or its capability (URL) / records, if applicable
4) The technical requirements and professional qualifications of ATs shall be laid down in the technical specifications and professional qualifications of ATs in accordance with the provisions of Section III.1.2 (P1.) And III.1.3 (M1-M2).
5) Kbt. 56., only crossing the EDF
6) Hianypotlas and looking for the Kbt. Article 71, hogy Kbt. Article 81 (4) - (5)
7) All the certificates may be presented in a decree, in the case of non-Hungarian documents, the Hungarian translation of the document is also attached. 8) Kbt. According to -- 44) AK does not make the creation of a project organization (project partner) possible or co-ordinated with the author's performance [Kbt. Section 35 (8)]
10) Additional II.2.5): the score given in the row in each case for each aspect / sub-point: 0-10
AK 1st and 2nd point for the twisted (reversed gold) verbal method second Regardless, the minimum / minimum is the least favorable (the longest duration) possible, the maximum / maximum is the most favorable (most relevant)11) Additional IV.2.6): AK will have 30 days to expire [Kbt. Section 81 (11)]
12) In the present case, Kbt does not apply Kbt. 75 (2) (e) [Kbt. Section 75 (6)] 13) AK indicates that Kbt. In accordance with Section 98 (3) of the present Convention, the use of a quasi-linear scaffold may be applied to the present invention. resultsIf you are a contractor, you are sure that if the contractor's performance is complete due to additional sites / performance sites, and the performance of all services in the base project as the base project. According to the authorship terms of the Act, the AK's activities are obsolete
14.Responsible Accredited Qualified Colleague for Professional Relations: Dr. Daczuk Balazs (00313) dr. Illenyi Peter Tamas (00316) (data available in KD)
Further information in KD
Internet address (URL): http://www.mtva.hu
Documents
Tender Notice