Procurement Summary
Country : Czech Republic
Summary : Contract notice: Road-repair works
Deadline : 01 Oct 2018
Other Information
Notice Type : Tender
TOT Ref.No.: 25194297
Document Ref. No. : 316788-2018
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : ?EDITELSTVÍ INICA DÁLNIC ?R
Office Name: ?editelství Inica dálnic ?R
Address: Na Pankráci 54/56
Town: Prague
Postal Code: 140 00
Contact Point: Ing. Eva Renková
Phone: +420 241084713
Czech Republic
Email :eva.renkova@rsd.cz
URL :http://www.rsd.cz
Tender Details
Object of the contract
Road-repair works
Description: Contract notice: Road-repair works
Authority Type: National or federal Agency/Office
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45233142, 45233142
CPV Description: Road-repair works.
D1 modernization - usek 07, EXIT 56 Souity EXIT 66 Loket
The project deals with the modernization of the D1 dump in the crash from km 56, 300 to km 66, 317574, ie the station km 66, 320 (connected to the modernized cage 09). The total length of the modernized car is 10.01757 km. Solved cuts start in the MUK Soutice area and end about 100 m beyond the Loket extra-crossroad junction. The subject of the building is above allcomplete replacement of asphalt roadway, which is already at the end of its life. Simultaneously with the replacement of the pavement cover, its extension will be made so that the overall width is reinforced for each rider's waist at least 11.5 m, ie the extension from category D 26.5 to the category D 28. This expansion will allow the temporary traffic management halfway downhill in Mode 2 2 (2 lanes for eachy direction of the ride), for example during repairs. For normal operation, there are 2 lane stripes of 3.75 m in width in each direction, the edge of which is reinforced. The main object of the project is the modernization of the D1 dock in the crash from km 56, 300 to km 66, 317574, ie the station of the stationwhat km 66, 320 (connected to the modernized 09). The total length of the modernized car is 10.01757 km. Solved cuts start in the MUK Soutice area and end about 100 m beyond the Loket extra-crossroad junction. The subject of the construction is primarily a complete exchange of asphalt road, which is already at the end of its life. At the same time as changing the road cover, its extension will be made so that in the main framethe overall width was not less than 11.5 m for each rider's passport, ie an extension from category D 26.5 to category D 28. This extension will allow for temporary traffic on the middle of the 2 2 (2 riding lanes for each riding direction ) eg for repairs. For normal operation, there are 2 lane stripes of 3.75 m in width in each direction, the edge of which is reinforced. The subject of the construction is also the adjustment asthe contracting authority shall require proof of fulfillment of the basic qualification prerequisites according to - 74 of the ZZVZ and the professional qualification requirements pursuant to Section 77 of the Commercial Register,
Building, their changes and removals and in the field of project activity in the building, document-about professional competence or
Authorization in the following fields: transport buildings, bridges and engineering constructions and surveying activities; see ZD point
4), the sponsor further requests the submission of the signed form 2.1.1. The selected contractor shall submit to the Contracting Authority a copy of the originals or certified copies within the scope of the procedure pursuant to Section 122 (3) of the Letter. a) ZZVZ
The Contracting Authority does not require.
The Contracting Authority, in accordance with - 105 (2) of the ZZVZ, eitherto require that the supplier (together with the Tenderers who have submitted the offer jointly in the framework of the joint venture) must realize the following minimum significant activities in fulfilling the public procurement by their own capacities. not through subcontractors: Treasure of CB cover and execution Treasures of the recycling layer and the trench coat of the cement stabilization layer (the cement base layer under cement concrete-The contracting authority, in accordance with 41 of the ZZVZ, requires the Participant to ensure that its obligations are fulfilled in part in the procurement procedure to provide a security of CZK 10, 000, 000 (in words: ten million CZK).
Internet address (URL): http://www.rsd.cz
Documents
Tender Notice