Procurement Summary
Country: Bulgaria
Summary: Contract notice: Road construction works
Deadline: 06 Nov 2017
Posting Date: 13 Sep 2017
Other Information
Notice Type: Tender
TOT Ref.No.: 16449590
Document Ref. No.: 355629-2017
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45233120 - Road construction works
71320000 - Engineering design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Road construction works
Description: Contract notice: Road construction works
Authority Type: Ministry or any other national or federal authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45233120, 45233120, 71320000, 45233120, 71320000
CPV Description: Road construction works
Engineering design services
Selection of contractor for carrying out design, construction and engineering works on site: Road III - 8611 "Belitsa - Zagradzhden" from km 10 430 to km 18 000 ". the public procurement is the Road Infrastructure Agency to conduct an open procedure for the selection of a contractor for carrying out research and design works and builderEngineering / on site: Road III - 8611 "Belitsa - Zrazhden" from km 10 430 to km 18 000 in order to improve the technical and operational characteristics of the road section and to achieve homogeneity of the road surface which will ensure safe conditions for traffic on the road, reduction of the depreciation cost of road transport vehicles and travel time.
Existing situation:
The 10 430 to 18 000 range is hard to navigate. Its gauge is extremely narrow by continuous collapses. The surface waters flowing through the skies pass through the roadway, form deep rails, ruin it and sink the road body into the ravine, which progressively narrows the road. Existing drainage facilities are destroyed or not functioning. Drainage chambersfillings are missing. The supporting walls are compromised. Bridges are long-term, tight, in poor condition and are unlikely to be reconstructed.
In the section from km 10 430 to km 18 000 the facilities are 22, - 18 pcs. tubular drains, 3 pcs. plate and 1 pc. stable. Devices with diameter f60 and smaller are 7 pcs. Their condition is bad, they are damaged or totally destroyeddrawn from the waters. Some of them are without wings and cisterns, but only transverse pipes.
In this section there are 3 pcs. bridges over the Belishka River - with L = 10 m - km 11 263, with L = 7 m - km 13 027 and with L = 10 m - km 14 791. They are in operation for more than 35 years, single open reinforced concrete planers, with a roadway width of about 3.50 m, and between the rails - from 4 to 7 m. In the sameits section has 14 pcs. retaining walls of stone masonry, 13 of which are under the road, and one is on the side of the skid. Most of the walls are compromised. There are ruins and collapses on the road on the side of the gully, as well as slopes of earth and rock mass on the side of the skete, which overwhelm the roadway. Restraint systems are missing, some concrete railings are presentthe site must have a registration in the Central Professional Register of Builders (TSRC) with the Chamber of Builders of the Republic of Bulgaria, according to Art. 3, para. (2) of the Construction Chamber Act (IIA) for the execution of Group II constructions, category II or to have such registration in a professional or commercial register in the country in which it is established for the foreign participants• The requirement is evidenced by the submission of a copy of the registration document in the Central Professional Register of Builders (TSRC) to the Chamber of Builders of the Republic of Bulgaria, according to Art. 3, para. 2 of the Chamber of Builders Act for the execution of Group II constructions, category II. For foreign persons - a similar document proving such registration in analogous reaccording to the legislation of the country in which they are established.
The participant in the procedure is required to have a minimum total turnover calculated on the basis of the annual turnover of the participant, including minimum turnover in the construction of roads and / or motorways and / roads and / or streets and / or roads from the Municipal Road Network (TSO)), and / or road facilities to them and / or roads with equivalent characteristics outside the country.
To demonstrate the economic and financial status of the participants, the following documents are submitted in relation to the requirements:
1. bank statements, or
2. annual financial statements or components when required to be published, and
3. free text reference hand the total turnover and the turnover in the sphere covered by the contract for the last 3 (three) completed financial years, depending on the date when the participant was established or started its activity
When, for a good reason, a participant is unable to submit the documents requested by the Contracting Authority, he can prove his economic and financial situation with the help of any other documentwhich the Employer deems appropriate.
Continued from item III.1.3) ... in the case where there is no such spec.). Spec. Experience: in a team associated with of overall leadership of at least 1 executed and accepted by the node. a new page, and / or a req., and / or a req, and / or a. repair of motorways, and / or Roads of Roads and / or Roads and / or roads and / or Roads with EQS. Hands outside-page B). Engineer constructor-1 pc. (Qualification): to have a higher degree in Industrial and Civil Construction or Construction of Buildings and Facilities or Road Construction or Transport Construction, or equivalent. specialty (if acquired in a country where there is no such specialty); in a team related to carrying out activities on the part "Constructive" in minadopted by nod. new site, and / or req, and / or req, and / or op. repair of motorways, and / or Roads of Roads and / or Roads and / or Roads and / or Roads with EQs outside C). Engineer road construction-1 pc .: Prof. (qualification): to have a higher education degree in "Road Construction" or "Transport Construction", or equivalent. spec. (if purchased in a country where there is no floorspecialties); Spec. Experience: in a team involved in carrying out activities on the "Road" part in a minimum of 1 application and accepted by the new site for publishing a new page, and / or a report, and / or a report and / or a basic repair on motorways, and / or Roads and / or Roads and / or Roads and / or Roads with EQs outside Page D) Engineer Surveyor-1: Prof. Reg. (Qual.): To have a higher degree in Geod-, Geometry and Cartography "or" Land Management "or" Geodesy "or" Marksheading "or" Geodesy and Markshearing ", or equivalent (if acquired in a country where there is no such specialty); experience: a team in a field related to the performance of field measurements in a minimum of 1 application and accepted by a new site for publishing a new page and / or a report and / or a rehearal and / or underlying repair of an auto mastand / or Roads and / or Roads and / or Roads and / or Roads of TENs and / or Roads with Eq. outside of E). Engineer on Materials-1: Prof. Rd. (Qualification): to have a higher degree in Industrial and Civil Construction or Construction of Buildings and Facilities or Road Construction or Transportation Engineering or Qualification Chemical Engineer or Equiv. spec or quartz. (if it is ain a country where there is no such specialty and qualification.); Spec. Experience: in a team associated with quality control and acceptance of the page works in min. 1 and accepted by unit. new site, and / or req., and / or req, and / or ops. repair of motorways, and / or Roads of Roads and / or Roads and / or roads and / or Roads with EQS. outside of page F). Safety and Health CoordinatorRAE (1): Prof. Rd. (Qualified.): Prof.Quality related to page, with completed BAE or equivalent course. Spec. Experience: in a team related to carrying out safety and health activities in min. 1 and adopted by the unit. a new page, and / or a req., and / or a req, and / or a. repair of motorways, and / or Roads of Roads and / or Roads and / or roads and / or Roads with EQS. x* Note: Construction is considered to have been fulfilled when there is a signed act / protocol or other document for the transfer of the construction of the building. the tenderer declares compliance with the selection criteria by submitting a single European Procurement Document (EEDOP). EEDOP is filled inand in accordance with Art. 67 of the Public Procurement Act and the general documents' order, by filling in the relevant texts in the open procedure
Internet address (URL): http://www.api.bg/index.php/bg/obshestveni-porachki/profil-na-kupuvacha-sled-30-dekemvri-2014
Directive: Classical Directive (2014/24/EU)
Documents
Tender Notice