Cross Icon
Cross Icon

Contract notice: Railway-track inspection services Tender - 20231525

The ДП „НАЦИОНАЛНА КОМПАНИЯ „ЖЕЛЕЗОПЪТНА ИНФРАСТРУКТУРА“ has issued a Tender notice for the procurement of a Contract notice: Railway-track inspection services in the Bulgaria. This Tender notice was published on 02 Feb 2018 and is scheduled to close on 15 Mar 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20231525, while the tender notice number is 041924-2018 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Bulgaria

Summary: Contract notice: Railway-track inspection services

Deadline: 15 Mar 2018

Posting Date: 02 Feb 2018

Other Information

Notice Type: Tender

TOT Ref.No.: 20231525

Document Ref. No.: 041924-2018

Competition: ICB

Financier: Self Financed

Purchaser Ownership: -

Tender Value: Refer Document

CPV Classification

71631470 - Railway-track inspection services

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Object of the contract
Railway-track inspection services
Description: Contract notice: Railway-track inspection services
Authority Type: Body governed by public law
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 71631470, 71631470, 71631470
CPV Description: - Assessment of compliance with interoperability requirements, technician. rules and independence. assessment of suitability for management. of the risk under the project: Rehabilitation. on railway line Plovdiv - Bourgas, Phase 2, 3 OP - Specialized item 1: "Assessment of the compliance with the interoperability requirements" under the project "Rehabilitation of the Plovdiv - Bourgas railway lineThe main activities to be carried out are: implementation of the EC procedure for verification of compliance with the TSI INF and TSI PRM for the structural sub-system INF by a notified body, execution EC procedure for verifying the compliance of the notified body with the ENE TSI for the structural subsystem ENE;Verification of compliance with the TSI TSI for the structural subsystem CTC-CT by a notified body; preparation of a report on the conformity assessment of the technical and / or working design with the requirements of the Infrastructure TSI, Safety of Rail Tunnels, Persons with Reduced Mobility (PRM), Energy ) and Control-Command and Signaling (CMS); preparing a report from the person to evaluatenot compliance with the essential interoperability requirements
Conformity assessment is performed separately for all contracts within the scope of the project in accordance with the Applicability Table for Lot 1 (Appendix 1 to the Technical Specification)
Expected results: EC verification and assessment of compliance with the applicable TSI (TSI) for the structural subsystem Infrastructure or part thereof EC verification and assessment of conformity with the applicable TSI for the Energy Structure Subsystem (ESA) or part of it. EC Verification and Assessment of Conformity with the applicable Technical Specifications for Interoperability for the Control-Command and Signaling Structure Subsystem-(according to item 4 of the Technical Documents "Documents of the Contractor") shall be performed separately for each site (construction / engineering contract), to be assessed under this contract, as follows: Conformity assessment reports at all stages of design, production anda final test for the relevant subsystems (INF, ENE and CTU-CT) or parts of subsystems; reports from the person assessing compliance with the essential interoperability requirements under Art. 44c par. 2, item 7 of Ordinance № 57 for the subsystems INF, ENE and DTC-ST for the stages of design, manufacture and final testing; EC Certificates for the Subsets concerned (INF, ENE and CCA-CT) orand parts of subsystems and / or documents that there is no compliance; technical dossier for subsystems INF, ENE and CTC-CT - For lot 1 - the notified body (the assessment body) for the EC procedure for checking the conformity with the technical specifications for interoperability (TSI) for the following subsystems: Infrastructure ", " Energy "and" Control - Command and Signaling "For the lot 2 - the participant is a conformity assessment body (designated authority) for conformity assessment activities of the Infrastructure, Energy and Control-Command and Signaling subsystems on the railway line with the requirements of the national safety rules or the technical rules that apply to the implementation of the essential requirements- for lot 3 - the participant has been accredited by a national authority or recognized by a recognized authority to perform an independent assessment of the implementation of the risk management process and its outcomes as defined in Annex I to Commission Implementing Regulation (EU) No 402/2013 of 30 April 2013 on the common method for the• When participating in more than one position, the requirements apply cumulatively • If the participant is an association which is not a legal entity, the requirement applies to each member of the grouping who will carry out the relevant activity according to the distribution of the participation of the persons in performanceof the activities provided for in the pooling agreement
Where the participant provides for the participation of subcontractors, the requirement also applies to them
For non-residents, registration in analogous registers is accepted under the law of the Member State in which they are established
The participant should provide the relevant information in Part IV "Selection Criteria", Section A "Appropriate- Documents for proving the requirements for: - Lot 1 - Certified copy of Permit for carrying out the activities for assessment and verification of the compliance with the essential requirements for interoperability of the infrastructure, energy and transport sub- Railway Control, Signaling and Signaling "or equivalent,
- Lot 2 - Certified copy of Pa decision to carry out the conformity assessment activities of the Infrastructure, Energy and Track-side Signaling and Signaling subsystems with the requirements of the national safety rules or the technical rules used to implement the essential requirements defined in list for each subsystem,
- lot 3 - certified copy of ea document that is an accredited / recognized person for an Assessment Body to carry out an independent safety assessment in accordance with the requirements of Art. (7) of Commission Implementing Regulation (EU) No 402/2013 of 30 April 2013 on a common safety method for risk assessment and evaluation and repealing Regulation (EC) No 352/2009 or equivalent. Accreditation from any member state is recognizedbut of the EU.
Documents for proof are presented under the terms of Art. 67, para. 6 of the Public Procurement Act
Not required.
The assignor removes from the procedure the participant for whom the grounds under Art. 54, para. 1, item 1-7 of the Public Procurement Act, as well as participants for whom the circumstances under Art. 55, para. 1, item 1, items 4 and 5 of the Public Procurement Act, which occurred before or during the procedure. The assignor removes the procedurea participant where it is a grouping of natural and / or legal persons and a member of the unified. there is one of the grounds for removal under Art. 54, para. 1, items 1-7 of the Public Procurement Act and there are circumstances under Art. 55, para. 1, item 1, item 4 and item 5 of the Public Procurement Act. The Contracting Authority requires replacement of a subcontractor proposed by the participant for which there is one of the grounds for removal under Art. 54, para. 1, items 1-7 of the Public Procurement Act and pand there are circumstances under Art. 55, para. 1, item 1, item 4 and item 5 of the Public Procurement Act.
When submitting the tender, the participant declares the lack of the grounds for elimination under art. 54, para. 1, item 1-7 of the Public Procurement Act and the lack of circumstances under Art. 55, para. 1, item 1, items 4 and 5 of the Public Procurement Act by presenting a single European Public Procurement Document (EEDOP) according to a standard template. When a participant is a united. from physiqueand / or legal entities, a separate EEDOP shall be submitted for each member of the consortium when submitting the bid. Where a participant has indicated that it will use subcontractors, a separate EEDOP will be submitted when submitting the bid for each of them. Participant for whom there are grounds under Art. 54, para. 1, item 1-7 of the Public Procurement Act and circumstances under Art. 55, para. 1, item 1, item 4 and item 5 of the Public Procurement Act, p• When submitting the tender, the participant declares that he / she is not related to other participants in the procedure (declared in EEDOP.) • The assignor removes from the procedure the participant, for whom there is plenty. on the prohibition and the related exceptions under Art. 3, item 8 and Art. 4 of the ZIFDFRIPRTLCTDS (declared in EEDOP).
The assignor does not have the right to create a law. person, when the participant selected as a contractor is a body union. and / or legal. persons. Where a participant is a union that is not a legal entity. a copy of a document showing the legal basis for the formation of the grouping must be submitted, with a term not shorter than the term for this public procurement
The document must also contain:
1. the rights and obligations of the members of the grouping; the distribution of responsibility among the members of the grouping; the activities that each member of the group will perform.
This document should unconditionally certify the designation of the partner representing the grouping for the purposes of the public procurement as well as the circumstancesthat the persons in the association take joint and several liability jointly and severally for their participation and the performance of the contract.
The authorities in the Republic of Bulgaria, from which the participants can obtain information about: - the obligations related to taxes and contributions; revenue, e-mail: www.nap.bg, - employment protection - Employment Agency, email: https: //www.az.government.bg,
- working conditions in the country - Executive Agency "Labor Inspectorate", electronic address: www.gli.government.bg
According to Article 114 of the Public Procurement Act, the terms for the performance of the contracts awarded by the contract start to run after securing the funding for which the contracting authority notifies the contractor.After the expiration of the 3 month period after the conclusion of the contract, the parties are entitledunder Art. 114 of the Public Procurement Act
Internet address (URL): www.rail-infra.bg
Directive: Classical Directive (2014/24/EU)

Documents

 Tender Notice


Similar Tenders

Request Demo
GiZ Tenders India

Procurement Documents for Bulgaria

Access a comprehensive library of standard procurement documents specific to Bulgaria. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Bulgaria

Explore Procurement Documents for Bulgaria


Want To Bid in This Tender?

Get Local Agent Support in Bulgaria and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?