Procurement Summary
Country: Austria
Summary: Contract notice: Overhead line construction
Deadline: 12 Jan 2018
Posting Date: 16 Dec 2017
Other Information
Notice Type: Tender
TOT Ref.No.: 19151529
Document Ref. No.: 501241-2017
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45232210 - Overhead line construction
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Overhead line construction
Description: Contract notice: Overhead line construction
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45232210, 45232210
CPV Description: Overhead line construction.
Construction and assembly work 110 kV Kramsach Kirchbichl section 1.
In the course of the tendered construction phase 1, the following main services are to be provided: -) erection of 24 new 110kV mast structures (steel lattice masts) -) earthworks, foundation of the mast as dissolved individual foundations with bored pegs -) Production of the master-) assembly of valves and cable work for 2 conductor systems (Al / Stalum 550/71) and OPGW Erdseil; Pipe length approx. 6.1km -) Dismantling of 23 existing pylons including foundations and earthing as well as dismantling of overhead and earth cables; Cable length approx. 6.25km The steel lattice mast parts, fittings and ropes are provided by the customer (ie by the AG). The exception according to -21 and -28 Federal Roads Act by ASFINAG is obtained from the AG for the overhead transmission line to be completed. Main site: Kirchbichl Breitenbach am Inn
In the course of the tendered construction phase 1, the following main services are to be provided: -) Erection of 24 new 110kV mast structures (steel lattice towers). ) Earthworks, production of the mast foundations as dissolved single fiduciary namewith bored pegs -) Manufacture of the milled joints -) Assembly of valves and cable work for 2 conductor systems (Al / Stalum 550/71) and OPGW Erdseil; Pipe length approx. 6.1km -) Dismantling of 23 existing pylons including foundations and earthing as well as dismantling of overhead and earth cables; Length of pipe approx. 6.25km The steel lattice mast parts, fittings and ropes are provided on site (by the AG)according to -21 and -28 Federal Roads Act by ASFINAG is obtained for the upcoming overhead line from the AG.
See conditions of participation
See conditions of participation
Internet address (URL): http://www.tiwag.at
Directive: Classical Directive (2014/25/EU)
Documents
Tender Notice