Procurement Summary
Country: Poland
Summary: Contract notice: Mining equipment
Deadline: 16 Oct 2019
Posting Date: 01 Oct 2019
Other Information
Notice Type: Tender
TOT Ref.No.: 36801003
Document Ref. No.: 460802-2019
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
43100000 - Mining equipment
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Mining equipment
Description: Contract notice: Mining equipment
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 43100000, 43100000
CPV Description: Mining equipment.
Supply of equipment: complete floor-mounted rack-and-pinion railway with electric drive, complete transport platform equipped with a handle for auxiliary equipment with hydraulic broaching machines, comp ...
Reference Number: 621903041
Supply of equipment:
Main Site: Polska Grupa Gornicza SA, Murcki-Staszic Branch, 40-467 Katowice, ul. Karolinki 1, POLAND
Equipment delivery:
- completej floor rack with electric drive,
- complete transport platform equipped with a handle for auxiliary devices with hydraulic broaching machines,
- complete route for floor rack gear,
for Polska Grupa Gornicza S.A. Branch of KWK Murcki-Staszic.
I. SIWZ available on the website (www.pgg.pl/dostowcy/przetargi) .
II. The method of submitting statements and applications, notifications and information in the proceedings are specified in Part XVIII of the ToR.
III. Subcontracting.
1. The contracting authority allows the participation of subcontractors in the implementation of the contract. Entrusting the implementation of part of the contract to subcontractors does not release the contractor from liability for the correct performance of the contract. In the event that the contractor uses subcontractors when performing the subject of the contract, which forthe scope of work will include welding, subcontractors must have a certified quality management system according to PN-EN ISO 3834-2: 2007, referred to in part XV point 1. The certificate should be attached to the offer.
2. The contracting authority reserves the contractor's personal performance obligation: not applicable.
3. The contracting authority requires the contractor to indicate the part of the contract which it intends to performentrust subcontractors and submissions by the contractor to subcontractors, in accordance with Annex 5 to the ToR.
IV.3. The contracting authority does not envisage the award of a similar contract as referred to in art. 134 section 6 point 3) of the Public Procurement Law
V. Form of submitted documents required in the ToR - in accordance with Part XVI of the ToR.
VI. The complete offer must contain the documents and commitments contained in Part XVII of the ToR.
VII. In order to afterclaims that the offered deliveries meet the requirements set out in Annex 1 to the ToR, the contracting authority requests that the offer be attached to:
1. List of compliance with the requirements and technical and operational parameters significant for the contracting party, in accordance with the template constituting Annex No. 1a to the ToR.
2. Documents listed in point III of Annex 1 to the ToR.
3. List of wearing parts together with definitionsindividual guarantee periods and conditions, in accordance with the specimen constituting Annex 2b to the ToR.
Internet address (URL): http://www.pgg.pl
Documents
Tender Notice