SEMMELWEIS EGYETEM has floated a tender for Contract notice: Microscopes. The project location is Hungary and the tender is closing on 30 Oct 2018. The tender notice number is 411723-2018, while the TOT Ref Number is 27016863. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Microscopes

Deadline : 30 Oct 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 27016863

Document Ref. No. : 411723-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : SEMMELWEIS EGYETEM
Office Name: Semmelweis Egyetem
Address: Üll?i út 26.
Town: Budapest
Postal Code: 1085
Contact Point: Czap Krisztina

Phone: +36 12109610
Fax: +36 12109618
Hungary
Email :czap.krisztina@semmelweis-univ.hu
URL :http://semmelweis.hu/

Tender Details

Object of the contract
Microscopes

Description: Contract notice: Microscopes

Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 38510000, 38510000, 38510000
CPV Description: Microscopes



Konfokalis lezerpastazo microscope purchaser

Reference Number: EKR000672522018

In the framework of the Adasveteli treaty, 1 confocal lazer paste microscope and the supply of the vibration-free table for it

Main Site: Semmelweis University Genetic, Cell and Immunbiological Intellect (1089 Budapest, Nagyvarad ter 4.)

1 confocal padlock microscope supplier for VEKOP-2.3.3-15-2017-00016 The Hungarian "Koezponti Extracellularis Vezikula Kutato Szolgaltato and Reference Laboratories at Semmelweis University" was created for the first time in Hungary.

The microscopic microscope has been acquired in a laboratory laboratory with a large quantity of minerals to be handled by a circus operator.

Elements of the system: Microscopic configuration: single use, motorized, fulln automated modular inverse microscope vase; fluorescence phenomenon connected with optical fiber; fluorescent filter cages; 10x, 20x, 40x, 60x lenses, hypoxia and preoperative cells are suitable for incubation. Confectional kepelemas system: 405 nm, 488 nm, 552 nm, 638 nm lye excitatory lymphatic lines; dwarf and special detector; confocal pairing unit. System PC and Softwareer. Vibration-free table. Put into service, service

The winner of the task is to dispose of the equipment in a suitable place for the destination, and to use the equipment for the first time in the field (hardware, software, applications) for 8 persons, for 6 persons, and for 3 days for technical probauezem. The system will also be used for further education at least 8 o'clock, the manufacturer of specialty products.

The detailed technical brochure is included in the Koezbeszerzesi Dokumentumok. According to Article 76 (2) (c), the golden criterion of the best arti- cles should be based on the following:

In the case of the criterion of the criterion of ar, the translated articulation, as well as the other considerations as qualitativein the case of criterion, the scoring as an absolute reference method for the use of circles.

The method of study is described in detail in Section IV of the Koezbeszerzesi documents.

Principal finances and payments, referring to the relevant legal provisions:

You do not pay any advance payment.

Respondent's Equalizer is equal to the following equations:

Provider to drinkhe orders the contractor at the same time as the contractor's subordinate. To the place of delivery to the place of destination, in accordance with the requirements of the branch office, and the deadline for betanitas is the 2nd anniversary of the contract law. (1) and (6) of Section 135 (1) (6) of the Civil Code. 6: 130th - 30 (1) and (2) of the LawAht will pay the beluel a day. taking into account its provisions. The payer will be paid from the due date in 2017 evi CL. TV. (Art.), The all-time sponsor of the 2011 CXCV. TV. (Aht.) And 2015 CXLIII. TV is a must-have for the captain of the TV.

The financier: the finishing touch. Tamogatas intensity: 100%, OP identified as VEKOP- 2.3.3-15-2017-00016

The date, the contractor and the paid pennies: HUF.

The detailed payment instructions are included in the draft contract for the resale of the contract documents.

The offeror does not allow the contractor to complete the winning bidder (s) host organization (project portfolio) / put it on paper.

In the procedure you can not be a timer, you can not buy a resin the suitably justified case, the economic operator against whom the Kbt. (1) and (2) of Section 62.

The Provider excludes from the list the time-maker, the sub-contractor or the eligible organization that is responsible for the above exclusionary reasons or the exclusion of the exclusion this is the case with the previous one.

The above exclusionthe supervisor and the subcontractor shall not be exempted from the co-procurement procedure if the Kbt. According to Article 64.

The certified validation mod:

A 321/2015. (X. 30.) Korm. Order 1. - (1). when submitting a timely basis to the founder of the time-frame and, where appropriate, on a timely basis, the EDF's single-member European Koezbeszerzesidocument (EEKD) must be preceded by proof that it does not belong to the Kb. Section 62 (1) - (2) of the Act on the Exclusion of Causes, with regard to the Kbt. Section 67 (1) to (2).

A 321/2015. (X. 30.) Korm. Order, only the EEKD is sentenced by the Applicant to a suitably substantiated sub-business or body. Contained in Article 62-(s) / person (s) apply to each of the eligible people (s) / persons (s) in each case by the person in charge of the EDF in the EDF the forms [424/2017. (XII.19.) K.r. - 13 (2)].

The person who receives the information from the jurybefore the delivery, a Gift Provider for this appointment to the 321/2015. (X. 30.) Korm. Decree No. 8, Section 10, 12-13. The court must state in the statement of claim that he or she fails to comply with the Kb. (1) - (2) of Section 62.

The Kbt. Section 67 (4) must be made available to the public - the user of the EDF declarantyou have no claim that you will not be required to complete your contract with us. Article 62 (1) - (2) based on the exclusionary reasons. Section 64. If the case has been overdue, According to Article 64 (2) of the Constitution. (X. 30.) of the Hungarian Civil Code, Section 8 (b) and (c) of the Kbt.-Article 62 (1) (k) (k) and (kc) of the Declaration on the EDF should provide a statement with the contents of the Government Decree on the level of the EDF. whether it is in progress. In the case of a progress report in progress, 1/2015. (X. 30.) Government Decree must be attached to the bill of exchange (or to the body exercising the right to vote in the Member State in which the right is filed) and a certificate valid from the date of its issuance. the validity of pre-trial pre-trialthey can use it as long as the content of the certificate or data contained in the verdicts is valid. (XII.19.) Korm. Decree No. 12 (2) for the exclusion of the exclusion of reasons not to be found in the coat can not be seen from the economic operator to submit a certificate that Semmelweis University is responsible for the economic operator's earlier co-procurement procedure in the EKR electr.onic. In this case, the economic operator declares that he / she will be obliged to take into account the validity of the evidence presented in the earlier application.

Due to the widespread limitation, point III.2.2 hereof is conditional upon the following:

The contractor's assurance of the breaches of the contract is negligent in error:

- It's timekoetber: the coefficients are 1% of the total net controversial offspring on the days of the fallout period, but up to 20% of the total contraversial net. The Provider shall test the Arankedkero for the loss of the coin due to the delay, if the Provider proves that the bet on the verdict is unsuccessful, and he did not have the chance to get rid of the test or the cart would be overwhelmed (- 6: 142)

In the event of a probationer's maximum sum of money, the Buyer is entitled to terminate the Contract or terminate it immediately. In the case of a waiver or termination of the Contract, the Buyer is entitled to enter into the custody of the author of this Authorship, but in this case is not entitledyou can get lucky. - - In case of a complete case, irrelevant provisions for the unlawful. The correction / replacement deadline will give you the right to do so, and you will be entitled to the probation period of the righteousness.

- Meghiusulasi koetber: in the case of the contravention of the authorship, the coefficients are 25% of the total contraventral counterparts,

- Your probation:from the south of the country for 12 (twelve) months from the start of the year, and it will take care of the maintenance tasks that correspond to the requirements of the manufacturer. = AV

1st In the interest of the Farmasagi Performer can submit an offer and register in the Electronic Procurement System (EDF) at 424/2017. (XII.19.) Of the Hungarian Government.

2nd The contact point for the EDF system is circulated electronically.

3rd The CA draws attention to the need to pay attention to the need for timely updating of the EDF. (1) to (3) of - 10. 4

. Compliance with the AT requirements and the justification for the exclusionary grounds under the EDF. Section 12 (2) can also be based on the foundation.

5th AK is a member of the ECR in the electronic version of the EDF, and the right to vote for the AT-based AT is equivalent to the EDR. Section 13 of the Constitution is examined.

6th It should include:

the space given in the EDFForms: - - Kbt. Section 66 para. (5) reads with the data referred to in section 68 (4),

- Time-of-mouth declarations. the Kbt. Section 66 (2) according to,

- Nyilatk. (even in case of negative content),

- Nyilatk. the exclusionary reasons do not exist,

- Nyilatk. the Kbt. Section 62 (1) k) point kb) base,

- Nyilatk. a 321 /In accordance with Section 17 para. (2) of the Government Decree.

7th AT attach a statement to the Kb. According to Section 66, subsection (6), points (a) and (b), and the latter with negative content.

AT enclose a statement of suitably-reputable organizations. Section 65 (7) - (9) as well as in neutral content.

8th Introducing the legal entity AT, all the AT, AV, orif this is the case, the AT will be able to certify that it is able to justify the capacity, according to the fact that the official (or subordinate to the subordinate) of the subordinate legal unit who has the right to register is a simple masculine mother who provided the subsidy.

9th If it is included in the schedule-no document is filed by the person authorized by the registrar, it must be accompanied by an authorized representative of the authorized representative who is authorized to register and which also contains the authorized subdivision. More details in the dockhouse doc.

10th The capacity is provided by a body (or a person) with a counterpart in the contract or pre-contractedyou will find a copy of the document on the resources available. Section 65 (7) According to. The document containing the test aid must contain the information contained in the Kbt. Section 65 (8), the AT shall be required to attach at the same time an authority to make the declarations made electronically within the EDRt.

11th Koezoes may apply for a referral to the Kbt. Section 35 and 424/2017. (XII.19.) Order no. Section 13 para. (2) - (3) of the Act. The Koezoes timing should be accompanied by a statement by the AT, in which they release the AT of the AT who is eligible for the ATs of the AT, and the ATs of the AT are subject only to the competition procedure, a lawyer authorized to register can make a valid declaration of law in the names of the ATs in the UK. The power of attorney (s) must include the fact that the owner of the ATs of the TSE is eligible for the electronic signature of the EDF in the performance of the EDRs at the time of the release of the individual driver's timetable.

The ATs of the body are to be joined togetherthe coyote's mega-balloons.

12th Please note that the official ticketing of the Qualified Time Listers has been subjected to the technical and professional requirements of the timescales and the proofs in point III.1.3.

Continue in VI.4.3.


Internet address (URL): http://semmelweis.hu/

Documents

 Tender Notice