KOPALNIA SOLI „WIELICZKA” SPÓ?KA AKCYJNA has floated a tender for Contract notice: Gas distribution. The project location is Poland and the tender is closing on 23 Aug 2018. The tender notice number is 307609-2018, while the TOT Ref Number is 25061356. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Contract notice: Gas distribution

Deadline : 23 Aug 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25061356

Document Ref. No. : 307609-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : KOPALNIA SOLI „WIELICZKA” SPÓ?KA AKCYJNA
Office Name: Kopalnia Soli „Wieliczka” Spó?ka Akcyjna
Address: Park Kingi 1
Town: Wieliczka
Postal Code: 32-020
Contact Point: W?adys?aw Rudkowski

Phone: +48 12278-71-11
Fax: +48 12278-71-10
Poland
Email :wladyslaw.rudkowski@kopalnia.pl
URL :www.kopalniawieliczka.eu

Tender Details

Object of the contract
Gas distribution

Description: Contract notice: Gas distribution

Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 65210000, 65210000
CPV Description: Gas distribution.

"Comprehensive gas fuel supply and distribution services for facilities owned by Wieliczka SA Mine."

Reference Number: KSW / 2018 / IP / 78

The subject of the order is a comprehensive supply (sale and distribution) of high-methane gas type E (GZ-50) up to 3 consumption points through existing 3 gas connections. Total estimated gas consumedo by the Mine during the year is 11 830 MWh.

Main Site: Wieliczka Salt Mine, ul. Park Kingi 1, 32-020 Wieliczka

The subject of the order is a comprehensive supply (sale and distribution) of high-methane gas type E (GZ-50) to 3 consumption points through existing 3 gas connections. The total estimated amount of gas consumed by the mine during the year is 11 830 MWh.

ConnectionNo. 1: Wieliczka Park Kingi 1 - power ordered 2743 kWh / h estimated amount of gas consumed: 9 255 MWh for the needs of 3 gas boiler rooms located in the Wieliczka Salt Mine:

a) boiler room "Kuźnia", equipped with two Vitomax 200 condensing boilers HW Viessmann with one boiler capacity 1850 kW

b) boiler room "New Assortments" equipped with two Vitocrossal 300 HW Viessmann condensing boilerswith one boiler capacity 345 kW

c) Daniłowicz boiler room equipped with two Vitomax 200 HW Viessmann condensing boilers with one boiler power 785 kW

Mine forecasts gas fuel consumption for connection No. 1 in individual months of the calendar year, in the amount:

Month Forecast gas consumption in the individual months of each year [kWh]

October 650, 000

November 1 050 000

Decemberń 1, 450, 000

January 1 650, 000

February 1 150, 000

March 1 105 000

April 600, 000

May 450, 000

June 250, 000

July 300, 000

August 300, 000

September 300, 000

Sum 9 255, 000

Connection No. 2: Wieliczka Park Kingi 1 - power ordered 713 kWh / h, estimated amount of consumed gas 1650 MWh for the needs of 2 steam generators located in the Warzelnia building - 2 LOOS steam generators type DF 600x20

Prediction minegas consumption for connection No. 2 in individual months of the calendar year, in the following quantities:

Month Forecast gas consumption in individual months of each year [kWh]

October 150, 000

November 150, 000

December 150, 000

January 160, 000

February 140 000

March 120, 000

April 120, 000

May 130, 000

June 130, 000

July 130, 000

August 130, 000

September 140, 000

Sum 1 650 000

Connection no. 3: Wieliczka Kosciuszki Square 10 - power ordered 400 kWh / h estimated amount of consumed gas of 925 MWh for the needs of the boiler house located in the Regis Shaft Regis building - boiler room "Regis" equipped with a condensing boiler of De Dietrich type C 230-170 o power 170 kW and Viessman Vitoplex 200 boiler with a capacity of 440 kW

Mine predicts the consumption of gaseous fuel for connection No. 3 in posduring the months of the calendar year, in the following quantities:

Month Forecast gas consumption in individual months of each year [kWh]

October 80, 000

November 120, 000

December 130, 000

January 150, 000

February 150, 000

March 120, 000

April 70, 000

May 40, 000

June 15, 000

July 15, 000

August 15, 000

September 20, 000

Sum 925, 000

For Connection No. 1, 2 and 3: The ordering party is not releasedfrom excise tax based on art. 31b par. 2 of the Excise Duty Act (ie OJ of 2014, item 752).

The gas consumption forecast for individual connections serves only to compare offers and in no case does it constitute a commitment to purchase gas in the given amount from the Employer.

Supply of gaseous fuel will take place on the terms specified in the Act of 10.4.1997 Energy Law (OJ from 2012, item 1059), secondary legislation to this act and generally binding legal regulations.

Settlements will be based on current indications of measurement systems located in the following locations:

a) connection No. 1: Wieliczka Park Kinga 1 (supplies gas to the Mine's facilities, except for the Brewery soli)

b) connection No. 2: Wieliczka Park Kinga 1 (supplies gas to the buildings-Warzelni soli) - c) connection No. 3: Wieliczka Kosciuszki Square 10 - The Contractor, based on the Power of Attorney granted will be obliged to: a) report to the indicated Distribution System Operator for the execution of a contract for the sale of gas concluded with the Contractor,

b) actions in the field of pronouncing hitherto binding comprehensive gas sales contract, - c) representing before the relevant System OperatorDistribution emu in cases from

I. According to art. 22 ust. 1 of the Act on the award of the contract may apply to Contractors who meet the conditions for:

1) competence or entitlement to conduct a specific professional activity:

a. entry into one of the professional or trade registers kept in a Member State of the European Union, in which the Contractor has a registered office, specified in theconnector XI to Directive 2014/24 / U or meet other requirements specified in this Annex or entry to the Central Register and Information on Business Activity

b. current concession for running a business in the scope of trade (sales) with natural gas, issued by the President of the Energy Regulatory Office,

c. current concession to conduct business in the field of distributionnatural gas issued by the President of the Energy Regulatory Office - in the case of Contractors being the Operator of the Distribution System,

d. current agreement with the Distribution System Operator (DSO) for the provision of gas distribution services in the area where the place of natural gas collection is located - in the case of Contractors who are not owners of the distribution network.

2) economics situationor financial ordering does not establish a specific condition in this respect

3) technical or professional capacity - evidence of proper performance or performance within the last 3 years before the deadline for submission of bids, and if the period of business is shorter during this period, at least two natural gas supplies not less than PLN 500, 000.00 beach, with their value, subject, dates of completion or performance, and entities for which deliveries have been made or are made, and attaching evidence determining whether these deliveries have been made or are carried out properly, while the evidence referred to is references or other documents issued by the entity for which the delivery was or is being performedand if for a justified reason of an objective nature the contractor is unable to obtain these documents - a statement by the contractor. the conditions for participation in the proceedings will be made on the basis of the submitted documents set out in Part VIII of the specifications.

II. 1. The Awarding Entity will exclude from the proceedings for awarding public procurement of Contractors, wobec which the circumstances referred to in art. Paragraph 24

. 1 of the Act, subject to the provisions of art. 24 sec. 7 11 of the Act

2. The Employer will exclude from the proceedings for awarding public contractors, referred to in art. 24 sec. 5 points 1-8 of the Act, subject to the provisions of art. 24 sec. 8-9 of the Act

III. In order to initially confirm compliance with the conditions for participation in the proceedings and bThe Contractor is obliged to submit a declaration submitted in the form of a single European order document (hereinafter referred to as "EAT"), using means of electronic communication.

The Ordering Party does not set a specific condition in this respect - the Purchaser, prior to granting the order, will call the Contractor whose offer will be the highest rated, to submit inwithin 10 days, below statements or documents (valid as at the date of submission) confirming compliance with the conditions of participation in the proceedings and no grounds for exclusion, subject to points 9 and 10:

1) with respect to competences or privileges to conduct professional activity by the Contractor: - a document confirming that the Contractor isentered into one of the professional or trade registers kept in a Member State of the European Union in which the contractor has its registered office or place of residence, - current license for running a business in the scope of natural gas trading, issued by the President of the Energy Regulatory Office, - current concession for conducting business in the field of distributionand natural gas, issued by the President of the Energy Regulatory Office - in the case of Contractors being the owner of the distribution network

- a statement of having a contract or a current contract with the Distribution System Operator (DSO) for the provision of gas distribution services in the area where the natural gas reception facility is located - for Contractors who are not Owners of the dis2) in relation to technical or professional capacity of the Contractor, a list confirming proper performance or performance within the last 3 years before the deadline for submission of bids, and if the period of business is shorter during this period, at least two natural gas deliveries with a value less than PLN 500, 000.00 each, including their value, pthe object, dates of completion or performance and entities for which deliveries have been made or are carried out, and attaching evidence determining whether these deliveries were made or are duly performed, while the evidence referred to are references or other documents issued by the entity, for which the delivery was or is performed and if for a justified reason aboutThe contractor is unable to obtain these documents in a subjective capacity - the contractor's statement. The Contractor is not obliged to submit the evidence referred to above, if the Ordering Party is an entity for whose delivery indicated in the list has been previously made. The list model is attached as Annex 4 to the specification.

3) with regard to the lack of grounds for exclusion: andinformation can be found in part VIII of the SIWZ


Internet address (URL): www.kopalniawieliczka.eu