Procurement Summary
Country: Poland
Summary: Contract notice: Funicular railway system
Deadline: 14 Jun 2018
Posting Date: 08 May 2018
Other Information
Notice Type: Tender
TOT Ref.No.: 23110565
Document Ref. No.: 198775-2018
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45234240 - Funicular railway system
45234250 - Teleferic construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Funicular railway system
Description: Contract notice: Funicular railway system
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45234240, 45234250, 45234240, 45234250
CPV Description: Construction in the place of the existing ski lift of the "Słotwinka" chair lift with equipment and technical infrastructure in the Słotwiny Arena ski station in Krynica-Zdr-j.
Funicular railway system.
Teleferic construction work. As part of the planned investment project in place of the existing plate lift with length 500 m a new 6-seater chairlift is designedesełkowa placed in the axis of the existing lift. It is planned to install a one-rail railway with round, detachable movement, with six-seat chairs and a draft shield for the chairs. The railway is designed for transport capacity in accordance with technical data and is designed for a capacity of 3, 000 people / hour. 100% transport in hot routes and transport in the route max 1 person are planned-on a chair. The length of the route on the slope will be about 390 m. Getting skiers at the bottom station takes place through the clocking gate, which causes that skiers and other passengers thanks to time control are admitted in appropriate time intervals to the belt conveyor and chairs. The speed of vehicles in stations is reduced to approx. 1.0 m / s in the area of getting on and off.and the railway is designed according to the latest knowledge of ropeway construction, equipped with modern technology and complies with Directive 2000/9 / EC.
Land development includes:
- A sofa railway with a length of approximately 390 m with 5-6-meter supporting pillars,
- Station the upper rail, which includes the world of the upper stop with the wind wheel and airship,
- The bottom station of the railway, which includes: the world of the bottom stop with the drive wheel, airship and back office.
Documents confirming that the Contractor is insured from civil liability against all risks in the scope of business related to the subject of the order for a guarantee sum not less than 10, 000, 000.00 PLN (say: ten million zlotys 00/100).
They were happy in the contracte.
Contractors must have the appropriate technical potential and persons capable of performing the order.
List of persons who will execute the order (manage the robots) together with a statement that the persons who will participate in the execution of the order, have the required permits Annex No. 2.
Internet address (URL): www.slotwinyarena.pl
Directive: Classical Directive (2004/18/EC)
Documents
Tender Notice