POLSKA SPÓ?KA GAZOWNICTWA SP. Z O. O., ODDZIA? ZAK?AD GAZOWNICZY W BIA?YMSTOKU has floated a tender for Contract notice: Engineering design services. The project location is Poland and the tender is closing on 25 Nov 2019. The tender notice number is 492974-2019, while the TOT Ref Number is 37260850. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Contract notice: Engineering design services

Deadline : 25 Nov 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 37260850

Document Ref. No. : 492974-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : POLSKA SPÓ?KA GAZOWNICTWA SP. Z O. O., ODDZIA? ZAK?AD GAZOWNICZY W BIA?YMSTOKU
Office Name: Polska Spó?ka Gazownictwa Sp. z o. o., Oddzia? Zak?ad Gazowniczy w Bia?ymstoku
Address: ul. Gen. Stanis?awa Sosabowskiego 24
Town: Bia?ystok
Postal Code: 15-182
Contact Point: Halina Kulik

Phone: +48 856645900
Fax: +48 856645940
Poland
Email :halina.kulik@psgaz.pl
URL :https://www.psgaz.pl

Tender Details

Object of the contract
Engineering design services

Description: Contract notice: Engineering design services

Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 71320000, 71320000
CPV Description: Engineering design services.

Preparation of design documentation for medium pressure gas pipeline dn 90, length about 370 m in Bielsk Podlaski ul. Mickiewicza

Reference Number: 2019 / W700 / WP-001884

The subject of the order is the preparation of design documentation of a medium pressure gas pipeline dn 90, length about 370 m in Bielsk Podlaski ul. Mickiewicz, province Podlasie.

Main Site: town of Bielsk Podlaski, voivodeship podlaskie

The object of the contract is to prepare project documentation of a medium pressure gas pipeline dn 90 length about 370 m in the city of Bielsk Podlaski ul. Mickiewicz, province Podlasie.

The subject of the contract includes, in particular:

1 Construction design, detailed design and author`s supervision for the medium pressure DN 90 gas pipeline, length about 370 m, in m. Bielsk Podlaski, ul. Mickiewicz. Shut-off fittings should be designed on the gas pipeline

2 Obtaining all opinions, permits and decisions on behalf of and for the Employer, from the competent authority, obtaining the final building permit decision.

3. Under the contract, the Contractor shall provide complete design documentation, a bill of quantities and an estimate

4. The contractor will be obliged to agreeof the project in the appropriate unit of the Employer.

The detailed description of the order is set out in the Terms of Reference with attachments available at: https: //zamycji.psgaz.pl. Not subject to exclusion.

2. They meet the following conditions for participating in the proceedings.

2.1 They have the competence or authority to conduct specific professional activities, provided thatit results from separate provisions

The Employer does not describe how to assess this condition

2.2 They are in an economic or financial situation

The Employer does not describe how to assess this condition.

2.3 They have technical or professional capacity - specified in point III.1.3 of the Advertisement The contractor may, in order to confirm compliance with the conditions for participation in the procedure, in relevant pand, in relation to a specific contract, or part thereof, rely on the technical or professional abilities or financial or economic situation of other entities, regardless of the legal nature of the legal relations with it.

4. Contractors may jointly apply for the contract.

II. The Employer excludes the Contractor from the contract award procedure on the basis of prdeputies referred to in art. 24 paragraph 1 point 12-23 Public Procurement Law and art. 24 paragraph 5 Public Procurement Law, subject to art. 133 section 4 Public Procurement Law and art. 24 paragraph 7-12 of the Public Procurement Law

The assessment of compliance with the above conditions will be made in accordance with the formula "meets does not meet", based on the information contained in the single document and documents to be provided by the Contractor to confirm compliance with the conditions for participation in the procedure.

IIIList of declarations and documents to be provided by the Contractors to confirm the fulfillment of the conditions for participation in the procedure and the absence of grounds for exclusion.

Documents and statements submitted together with the offer by all Contractors

Together with the offer constituting Annex No. 1 to the ToR, the Contractor submits valid as at the date of submission of the offers a statement to the extent indicated in the ToR in the form of a uniform document (Annex 2 to the ToR) in compliance with the requirements set out in points 8.2.1- 8.2.9 of the ToR and documents referred to in points 8.1.2- 8.1.6 of the ToR, i.e.

1. In the case of contractors jointly applying for granting orders (in the form of a consortium, civil partnership), The single document is submitted by each of the contractors jointly applying for the order in compliance with the requirements set out in pointh 8.2.1 - 8.2.9 SIWZ. These documents confirm the fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion

To the extent that each of the contractors shows that they meet the conditions for participation in the procedure and no grounds for exclusion.

2. Contractor who refers to the resources of other entities in order to demonstrate the absence of grounds for exclusion and compliance with them in the scope of,

W jakim refers to their resources, conditions for participation in the procedure, also submits uniform documents regarding these entities, signed by the entity to which the documents relate - subject to the requirements set out in points 8.2.1 8.2.9 of the ToR.

3. Third party obligation to make resources available according to Annex 7 to the ToR (if applicable).

4. Power of attorney (if applicable)

5. Evidence of contributionsand a deposit (if applicable).

The offer with attachments, including a single document, should be submitted in electronic form with a qualified electronic signature, via the PSG Purchasing Platform.

Declaration made obligatorily by all Contractors, within 3 days of posting on the website Internet information referred to in art. 86 section 5, , i.e. informationfrom the opening of offers., a declaration of belonging or not belonging to the same capital group.

The Employer informs that he will carry out the procedure in accordance with Article. 24 aa PZp, which means that it will first evaluate the offers and then examine whether the Contractor whose offer has been assessed as the most advantageous is not subject to exclusion and meets the conditions for participation in the procedure.

Full informationthey are included in the Terms of Reference available on the website https://zamycji.psgaz.pl as at the date of submitting statements or documents confirming the circumstances referred to in art. 25 usVol. 1 of the Act, namely:

1. Information from the National Criminal Register in the scope specified in art. 24 paragraph 1 point 13, 14 and 21 of the Act and, regarding conviction for an offense to imprisonment, to the extent specified by the contracting authority pursuant to Art. 24 paragraph 5 points 5 and 6 of the Act, issued not earlier than 6 months before the offer submission deadline.

Subject to the content of art. 133 section 4 of the Act, itis the contractor is not subject to exclusion in the case referred to in art. 24 paragraph 1 point 13 lit. d, and in the case referred to in art. 24 paragraph 1 point 14, if the person referred to in this provision has been convicted of an offense listed in art. 24 paragraph 1 point 13 lit. d.

2 Certificates from the competent head of the tax office confirming that the contractor is not in arrears with payment of taxes, not earlier than 3 months before the deadline for submission of bids, or another document confirming that the contractor has entered into an agreement with the competent tax authority regarding the repayment of these receivables together with any interest or fines, in particular, he obtained the exemption provided for by law, deferment or payment in installments payments or withholding in fulland a decision of the competent authority;

3 Certificates of the competent organizational unit of the Social Insurance Institution or the Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with payment of social security or health insurance contributions, issued not earlier than 3 months before the deadline for submitting bids, or other document afterclaiming that the contractor has entered into an agreement with the competent authority on the repayment of these receivables, together with any interest or fines, in particular, he obtained the exemption, deferral or installment of overdue payments provided for by law or withholding in full the decision of the competent authority;

4 Copy from the relevant register or from central records and information about activitieseconomic establishment, if separate provisions require an entry in the register or a register in order to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 point 1 of the Act;

5. Contractor`s statements in accordance with Annex 4 to the ToR.

6. List of persons specified in point 6.1.2.3 lit. and the Terms of Reference, directed by the Contractor to carry out the contract, responsible for the provision of services, together with infoinformation on their professional qualifications, entitlements, experience and education necessary to perform the order, as well as the scope of their activities, and information on the basis for their disposal, according to the template constituting Annex 5 to the ToR.

7. List of services performed, referred to in point 6.1.1.3 lit. b SIWZ, prepared according to the model constituting the Annexand no. 6 to the Terms of Reference.

To the list should be attached evidence that these services have been performed properly, the evidence referred to are references or other documents issued by the entity for whose services they were performed, and if for a justified reason of an objective nature, the contractor is unable to obtain these documents by the contractor`s statement

8. Guide conductzone is in Polish.

Full information about the subject of the order, conditions of participation in the procedure and documents requested from Contractors is set out in the Terms of Reference with attachments, available at https://zamycji.psgaz.pl
Internet address (URL): https://www.psgaz.pl

Documents

 Tender Notice