SZOMBATHELY MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Electricity. The project location is Hungary and the tender is closing on 03 Dec 2018. The tender notice number is 479677-2018, while the TOT Ref Number is 28099882. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Electricity

Deadline : 03 Dec 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 28099882

Document Ref. No. : 479677-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : SZOMBATHELY MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Szombathely Megyei Jogú Város Önkormányzata
Address: Kossuth Lajos utca 1-3.
Town: Szombathely
Postal Code: 9700
Contact Point: Dr. Molnár Hajnalka

Phone: +36 94520201
Fax: +36 94328148
Hungary
Email :kozbeszerzes@szombathely.hu
URL :http://www.szombathely.hu

Tender Details

Object of the contract
Electricity

Description: Contract notice: Electricity

Authority Type: Regional or local authority
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 09310000, 09310000, 09310000
CPV Description: Electricity

Electricity 2018

Reference Number: EKR000686312018

Amount: 11267976 kWh.

Main Site: Szombathely, Felsőcsatar and Budapest, depending on the number of the place where the food is brewed.

Quantity (MEF): 11267976 kWh / 2 ev

Total quantity - 30% tolerable, consumed toleranceFrom the aspect of the PODs, the amount of electrical energy contracted must be treated in the same way as the electricity consumed by the PODs. LXXXVI. it is based on Article 44 of the Tender Ordinance because of the consistency of consumption, so that the amount of the purchaser in the merits is based on a specific merit basis, according to the consumer. Provider Daily, Weekly, Monthlyit does not give you a request, it will give you an unlimited number of times.

The full range of electricity is available in LXXXVI 2007. toenergy, and electric power plant in LXXXVI of 2007. for some of the provisions of this section, see paras 273/2007. (X. 19.) Government Decree on Electricity System Use Di-krols and their Application Rules 4/2013. (X. 16.) MEKH Decree, for a preliminary rulingyou have to be careful. The quality of the electricity provided is in accordance with MSZ EN 50160 and MSZ1.

The consumption sites that are switched on once, the user of a given user for a very good time offers a free market power over the contract term period.

Usage points : 108. The winning bidderit is advisable to provide a full list of all the services associated with the Flemish Label and all the services associated with Flemish Labels. The winner of the proposal is to provide you with a set of timescales for the winning bidder's contract for the electricity market.a full-time contractor with a winning bidder, a timetable tester who is not a winner of a season ticket • A winning bidder is confessed that he or she has spent a lot of time collecting a collector ' vice versaIf you do not know, you will not be able to AT, subsection, and you will not be able to find a suitable source of income for a commercially viable taxpayer or a taxpayer. actor-who is the. Section 62 para. (1) to (2) or section 63 (1) under the power of all.

Verification: In the case of the co-inscripts of the 321/2015. (X.30.) Government Decree (hereinafter: Cr.) Section 1 (1) based on the AT at the time of the offerings, the II. (Hereinafter referred to as EEKD), as described in chapter 3-4. and 5-6. It must be stated, in advance, -that it does not belong to the Kb. Section 62 para. (1) and (2). In the case of a timely test, each of the ATs in the test will release the formatted. If AT desires to meet the requirements of a suitable body suitability for the organization or the person's capacity, each of the excluded organizations or persons will submit a formatting document to each of them. The EEKD-the well-trained businessman declares that the exclusionary reasons do not exist, and that he will provide gardening information. Precondition for the exclusion of the grounds for exclusion CA reads form III. information provided in this document is a way of avoiding an unambiguous and verifiable mode, and is not part of the power of exclusion. The Declaration contains an indication that the Kbt. Article 69 (4) according to the form in which he is authorized to issue a certificate, as well as Section 69 (11). for the purpose of applying the data base to the data base. AK altala Kbt. Article 69 (4) based on justifications for exclusionary groundshe applauded AT from the fictitious results before the solemn decision, cf. According to Article 16 of the Constitution, further convictions of witnesses are also probed. Section 15 para. (1). based on the suitability of the sub-business or the body (person) that is eligible for the right, AT will only submit EEKD at the time. Section 62 (1) - (1-2) excludes the justification of the justification, but trueyou are not tested. Section 15 (2) BC. is based on those subprojects that do not qualify as legally valid AT at the time of the Kbt. Section 67 (4) - If the Official Tick of the Certified ATs under CR proves that the economic operator does not fall into the scope of any exclusion, z AK is a certified member of the Certified ATs with electronically available official notices and the European Union accepts a certificate issued by an economic operator established in a number of Member States, for examination in the EEKD, if it is not providedit is possible to refer to the quoted attachment in a statement, indicating what is contained in this information or data, and in the case of electronic records, what is the delivery. Yes. Section 69 (7) and Section 62 para. (1). (i), Article 74 (1) (b). The date of the declaration must not be the day preceding the present invocation.

VI.3) Further informationand because of the character constraint:

VI.3.13. The AT must have a license for the Electricity Trade Act issued by the Hungarian Energy and Exhibiting Service.

The AK will check the list of free, electronically-kept records. Section 1, Section 5 (1), Section 19, subsection (1), para. (c)and Section 19 (5). AT must attach to the previous quarter the deadline for conclusion of the contract and the final report on the purchase of the co-ordinated electricity (electricity) from the armed forces, attesting to the fact that AT when it was sent to paper or when it started to work if these data were available . The Way of Verifying (aConfirmation of your mode of governing Yes. 66-67.-, 69.-, - 19 of the Cr (3), Section 19 (7) -):..

Preliminary Certificate: brainwash the tender must provide proof in advance of the submission EEKD that meets defined in general, AK Economic and penzuegyi koevetelmenynek suitability (- 1 Cr. (1) par.). AK adopt a draft igazolaskent AT EEKD he made a statement to the effect that compliance with the prescribed tables(Article 2 (1) (c), (5)).

Koezoes ATs are the number of copies (see - 2 (1) (c) (5)). Section 65 (6) based on the suitability of the appropriate test methods. Those experiments that are exceptionally excluded for any one of the traders will suffice if one is the one for a dog. The Kbt. Section 65 (7) - (8) based on the appropriate test methodsthe ATs can meet the capacity of any body or person, and the tiredness of the loose relationship is legal. In this case, it is necessary to indicate this organization and the user should point out the appropriate test method (s) for which the AT is in the interest of the organization.Yes. In the case of - 65 (8), the e-Kr. Section 13 (4) . The Kbt. According to Section 65 (8), the organization whose data is used by the AT for the purpose of verifying the economic and pennies can be found in the Civil Code of the Civil Code. 6: 419th As stated in --, the CA shall be liable to the CA by default of the AT or failing to completeThis is a valid certificate: AT is issued prior to the performance of this document. Article 69 (4) according to the appropriate deadline, the CA should confirm the suitability of the suitability test by the court. If the elbiral count is the number of AKs with the light content of the statementin the footsteps of the Kbt. In accordance with - 69 para. (7), a period of six working days may be filed for a period of six months.

1) The contractor shall be entitled to receive the following documents: Meghiusulasi koetber: in such a way that the winning AT is responsible for, abolishes or is impossible (eg, wins AT electricity traders or merlegkeri responsible activities and traders-you will be able to pay the amount of electricity you have received in the Authorized% s of the electricity consumed in the last 15 months. I do not pay any advance payment. Your opponents, the verified contracted copy is tested. monthly, surplus, the samlafiz at the place of consumptiona tried and tested user equates to the author's point of time with a Powerful Ptk. According to the foreword, a warrant for a warrant, in the case of an atutal, in HUF (HUF).

Winner AT, the above-mentioned person, conspired by the abuses of the AKes (users) of the koezo. Winner AT is not eligible for the release of the dog.

3) The winner of the test seasonif you have any questions, please contact us. Section 57 (2). the documents of this type are given in 424/2017. (XII.19.) Korm. R. it is excluded from the obligation of the registered economic operators in the EDF system.

5) Section 35 (1) to (7). a more profitable businessman may also be able to betDeals. The application shall be accompanied by a copy of the joint and several liability of the Joint Undertaking.

6) Section 66 (6) (7) The offer must contain the express declaration AT. Section 66 (2) - (3).

8) Section 321/2015. (X.30.) Gov. r. On the basis of Section 30 (4), the CA will seek AT to ensure that the contact person III.1.2)P / first as well as in section III.1.3) M / 1. (9) FAKSZ: Dr. Balogh L-szl- Csaba (00252) and Dr. Fonagy Timea (9) FAKSZ: Dr. Balogh L-szl- Csaba (00252) and Dr. Fonagy Timea (00252) and Dr. Fonagy Timea (00417)

10) AT must be accompanied by an intense and powerful mermostly contracted by MAVIR Zrt., according to which he has the right to surrender the merleman's responsibility. If you do not have AT with a Merleman Contractor with MAVIR Zrt, you must enclose the AT statement that it has a power shareholder who is entitled to an oenallo merlegkoer base merchant license, sult is to blame the merelor of the electricity traders with MAVIR Zrt. This is to be found on the Kbt. Section 73 (1) (e).

11) The time domain (electricity consumption) shall be determined in net terms. The time has to be done in accordance with the projection from 1.1.2019. With the one-arm contentincluding the full range of electricity and production requirements of the User, including the Merle-Timers, Equivalent Energy and Merit Data Testing. Electricity can not be emitted during the term of the contract. Electricity is not included in the User's charge, (XII. 23.) GKM decreeelectricity and electricity, as well as the supply of Joevedek, the term, the sub-system system use, and the LXXXVI. TV MAVIR penzeszkoezoek, and any other supplement, jokes, jarulekot, koelts. The period of payment of the money paid by the bank is 30 days in the case of athe law of the Ptk. apart from the casualty burden of money, no money can be spent. Further information can be found in the draft contract.

12) CA does not apply for the Kb. Section 75 (2) (e)
Internet address (URL): http://www.szombathely.hu

Documents

 Tender Notice