BUDAPESTI KÖZLEKEDÉSI ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has floated a tender for Contract notice: Electrical-system repair services. The project location is Hungary and the tender is closing on 17 Sep 2019. The tender notice number is 330601-2019, while the TOT Ref Number is 34685059. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Electrical-system repair services

Deadline : 17 Sep 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 34685059

Document Ref. No. : 330601-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : BUDAPESTI KÖZLEKEDÉSI ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG
Office Name: Budapesti Közlekedési Zártkör?en M?köd? Részvénytársaság
Address: Akácfa utca 15.
Town: Budapest
Postal Code: 1980
Contact Point: Dr. Gara Richárd

Phone: +36 14616578
Fax: +36 13226438
Hungary
Email :kozbeszerzes@bkv.hu
URL :http://www.bkv.hu

Tender Details

Object of the contract
Electrical-system repair services

Description: Contract notice: Electrical-system repair services

Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 50116100, 50116100, 50116100
CPV Description: Electrical-system repair services.

T-60/19 Electric kocsiszekreny electric al. jav

Reference Number: EKR000852102019

Repairs of electrical components of trams in the framework of service framework contract, according to the following possibilities:

Main Site: Budapest, BKV Zrt.zasi frame framing frame, planned event oesszesen 195 pieces in quantity

The specified quantities are the basis of previous user experiences, and they were determined. experiential quantities. Experiential Quantities in Substantial Elaboration of the News, Subcontracting in the Lesser-Difficult Quarterly, These data may be diverted from these experimental data. The initiator must present the proposal in the knowledge of the previous ones. Only the one-personed Keruel will be able to get the attention of the contractor who is looking for a megcass. (X. 30.) Government Decree -- (3).ordering new lice not included in the documents - the extension of the new collection to the new element nelkuel - the party is found at the beginning of the event. is aware that the timeliness of ordersmail to kueldi, whose forests:

- its winner in case assures that the orders are received by a single e-mail address,

- if it is up-to-date - at least the e-mail system has received a receipt confirmation receipt - can confirm the e-mail to the e-mail address specified by the customer, the order is considered to be delivered to the customer,

: it is passed on by the authors of the author`s work and his / her workmanship

- the author`s performance is in line with the qualitative and energy-efficient workmanship; reset documents

Kizaro reasons:

It is not possible to have a timekeeper (koezoes timer), a subordinate and a suitable reader who cannot accept the Kbt. (1) to (2) of Section 62 apply, subject to the Kbt. Section (3) and (5) of Section 62 and Section K (3) of the Section 63 para. (3)

The Kbt. In Article 74 para. (1), the force of the journal shall elaborate on the subscriber, subcontractor or organization that appropriately retrieves his / her original document, which is a) the Kbt. according to the above-mentioned exclusions, the power belongs to; The reason for the exclusion in Section 62 is the following:(koezoes scheduler) in 321/2015. (X. 30.) Government Decree (1) (1) stipulates that the unified european coexistence document (hereinafter: EEKD) must prove in advance that the Kbt does not belong. The Power of Exclusion as set out in Section 62 (1) - (2) of the Act on Disclosure of Excluded Substance. (X. 30.) Korm.Pursuant to Section 4 para. (1) of Decree no. (1) - (2) of Section 62 excludes reasons (subject to Section 4 (3) - (4) and Section 6 (1) of Government Decree 321/2015 (X. 30.)) - also to paragraph 2),

- A 321/2015. (X. 30.) on the basis of Article 15 (2) of the Govt.b. Shall submit a declaration pursuant to Section 67 (4). The statement must be entered even if the timeliness of the sub-subcontractors known in the past is not specified,

- In the case of Koezoes`s report, the reporters of the koezoes are represented in the presentation by the host operator who has introduced the report. callara):

- A 321/2015. (X. 30.) Government Decree 8 and 10, and the timekeeper must verify that the timekeeper does not belong to Kbt. Section 62 (1) - (2) of the Government Decree (subject to the provisions of Section 14 and 16 of Government Decree 321/2015 (X. 30.)). The Kbt. Article 62 (1) (k) (ca), with regard to the exclusions, shall be established in Hungaryt for the timer on 321/2015. (X. 30.) Government Decree 8 (i) (ib), the non-Hungarian observer established in the Act 321/2015. (X. 30.) Government Decree 10 (g) (gb). The Kbt. For the purposes of subsection (1) (k) (k) (kc) of Section 62 (1), the declaration may be completed in the form of the relevant EDF form and in the form of an entry,

- A 321/2015. (X. 30)According to Article 15 para. The reasons for exclusion set out in Section 62 (1) - (2) are not valid in forests,

- A 321/2015. (X.30.), Article 1 (7) of the Govt.as long as the content of the data contained in the textbooks is true,

- The hosts, the sub-subscriber, or the owner of the appropriate real-time certificate are the Kbt. As defined in Section 64 of the Act, may be entitled to the oentist rights. (X. 30.) Government Decree (1) (1) of the Act on the introduction of the EECD, for the fulfillment of appropriate conditions, verbal information must be proven in advance that it complies with the appropriate tissue requirements determined by the latest news. The respondent must only declare that he / she is suitable for the appropriate tissue engineers, that the appropriate testers do not need to be resounded or resounded,

It is easy to meet the capacities of a miserable organization or person, each of them who enrolled organizations or individuals implements the EECD. In such a case, the organizations or individuals who have their capacities in the possession of the appropriate terms will only declare those that the subscriber is willing to take to the real world,

- KoezoesIn the case of the present, the statement is made by the hobbyist who introduced the report to the representative of the koezoes journalist. (c) of the General Terms and Conditions of Subdivision of the General Terms and Conditions, s traffic announcement nelkuel samititott - abstention from a vengeance when he started to act, or when he started to act, if the data does not have a locked end of the turn, because the beginning of the period started afterwards and an artificial statement, a statement from the publicIt must be presented by an arbitrator who has been eliminated during the preceding art history. (X.30.) In the case referred to in Section 19 (3) of the Government Decree, as described therein. must be assured

- A 321/2015. (X.30.), Article 1 (7) of the Government Decree, may also be inserted before the expeditious task, as long as the contents of the tens, data content is genuine,

- A 321/2015. (X.30.) Article 1 para.marcelujtara keruelt. In this case, the timekeeper must declare which trace is looking for the filed statement or to take the biralat line into consideration,

- The Kbt. Section 65 para. (7) is based on the capacity of any organization or person in charge of the appropriate auditors to fulfill the requirements, i character fueggetlenuel. In this case, you should report this organization and the relevant points of interest in the current case, or any relevant testimonial or testimonials that are certified by the timekeeper of this organization`s resources or tears,

- -A Kbt. Section 65 (8) is based on the organization whose data is kept by the hostand penzuegyi suitable for use in the real estate, the Ptk. 6: 419th According to the provisions of --, the journalist is responsible for the timeliness of the newsletter. Article 69 (11a).

1. Awareness (hereinafter referred to as "AK") is the full scope of the Kezeszekerzesz documentsit can be accessed electronically in the EDF.

2. The terms and conditions of the penzuegyi and the technical and professional qualifi- cations as well as the technical and professional conditions stipulated in points III.1.2. AK on Kbt. Section 81 (4) - (5) applies. The person presenting the report must expressly declare his / her Kb. Section 66 para. (2) of the corresponding EDF form is issued with the certificate. The announcer must expressly state the Kbt. Article 66 (6). K draws attention to Kbt. 41 / A.

7. The newsletter must contain a read-only form, which will be backed up by an electronic form. The host is the Kbt. Section 44 appliesan ex-ante placement of the document containing the business secret is used in the EDF system for this purpose. The submitter should declare on the correct form of the relevant EDF form whether the entry is in progress. In the event of a pending entry in the event of a change, see 321/2015. (X. 30.) Government Decree 13. You`re up to Koezoesin case of Kbt. Section 35 (2a) is based on the Kbt. Article 35 (2) contains the authorization of the proxy holder. You need to read the news in Hungarian. If the document contains a document, a certificate, a statement in a non-Hungarian language, it will be put together by the responsible Hungarian translator in the language of the case.an es and Kbt. As defined in Section 47 para. (2). AK on Kbt. Article 71 provides for the possibility of a slack pot, Kbt. Section 71 para. AK on Kbt. Section 75 (2) (e) does not apply. Kbt. - 75 (2) (g) of the Invalid Cause

14. K draws attention to Kbt. Article 131 (4) es(9).

15. K indicates that the authors seeking permission for the megcass can be terminated by rescuing 90 days of notice, justifying nelkuel as stated in the draft contract. If more than the same time is the same as the title of the conceptual, the story is the best one in which the Reason is the lowest. The result of the eljaras was resonantIn the case of the winner, the winner is based on the following criteria:

Keretoesszeg = Aararati oesszar

If the person of the winner is the same as the winner, in the case of the winner, the winner of the winner is a piece of the author`s keruel. in which keruel roegzite is believed to be

The frame of the frame:

Keressesszeg = the essence of the odds for the given shots.

AK is 70% of the bodypiece with the order of the oessert. AK on Kbt. On the basis of Article 77 para. (1), in the case of all cases, the ten working days are considered as the most favorable level for which the more favorable councilors are equal.nthatar gives the same number of points as the upper limit (10 points).

19. Iranyado Law: The Kbt. as well as the provisions of Act No. 20 of the Civil Code. All six times given in orphan are due to local time. During the 1 month specified in Section IV.2.6 of this Reflection, you must complete 30 calendar days. Due to the characteristics of the EKR, further reports related to the preparation of the newsletter are included in the utmutato.AK draws attention to the fact that the communication Kbt. 41 / C. Except as set out in Section (1) of the Article (1), they are exclusively cross-checked on the EDF. FAKSZ: dr. Gara Richard (00041)

24. Number of Eljaras: BKR Zrt. T-60/19


Internet address (URL): http://www.bkv.hu

Documents

 Tender Notice