Procurement Summary
Country: Hungary
Summary: Contract notice: Electrical power systems design services
Deadline: 16 Oct 2018
Posting Date: 14 Sep 2018
Other Information
Notice Type: Tender
TOT Ref.No.: 26750844
Document Ref. No.: 399978-2018
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
71323100 - Electrical power systems design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Electrical power systems design services
Description: Contract notice: Electrical power systems design services
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71323100, 71323100, 71323100
CPV Description: Electrical design and design services
Oenallo design work
Reference Number: EKR000618852018
Framework for the design of the NKM Aramhalozati Kft. In the field of low voltage electric power divestments in the field of design work Main Site: Service Provider Teruelete
Electrical coefficient 20 kV free conductors epitopes, KOeF foeldkabel letesitos, tr
0.4 kV free conductors epitopes, KIF (low-tension) foeld kits, and drop-out distribution splits, plug-in and dropout related design draw and outsourcing tasks. kV conductors and column transformers allomass epites bontas design:
Transducers epites: 300 km
Free passes: 150 km
OTR (column transformer) allomic epites: 650
Minimum 1 TMOK (pivotable columns) with sloping, plain or bulk designs, minimum 1 OK left-angled, placement or bontas : 500 pieces
Execution of fieldwork and reconnaissance design work: 600 pieces
Available as KOeF (test suspension) FAM-400 pc
10, 20 kV cable halves:
- Transformer allomers with oesszekető k-bel letesitty, open design
KOeF cable discharge: 150 km
KOeF cable breakdown: 100 km
BHTR (concrete basin transformer), EHTR (embedded home transformer):
- 1 or more delicate allomas, disconnect: 250
KIF free cables and cable:
KIF cable downTestimonials: 150 km
KIF clearance: 500 km
KIF bontas: 100 km
- Related to KOeF work or Oenallo KIF work
Consumption connection: 2500 pcs
The quantities listed here are suitable for the consumption of consumables. 2 600 000 000, - HUF, within which the individual works at the time of the advance were: 7 000-
II.2.5) Continuation of the criteria for the characterization:
2.1. (Relevant Export Plans: KOeF Free Drivers, KOeF Cable, Colloidal or Home Structured KOeF / KIF Transformer Balls, KIFsand KIF cables) should have the most basic editorial experience and must have had an editorial board in the execution of at least 5 executable plans.
The supervisor examined the opportunity and possible to conclude four pieces of co-ops for the design and construction work of the inquiries. for the purpose. One typewhat would it be that it would not be economically economical to divide further into the present as the present. (A) Kizaro Causes:
It can not be time-consuming (AT), it is not a time-consuming (AT), it can not be time-consuming (AT) and you can not take itAg (App.) is a verbal copy of the names of the hosts. Section (1) - (2), Section 63 (1) of the Act on the Exclusion of Allergy Causes. Section 74 (1) (a) and (b) of the Rules of Procedure.
The exclusionary reasons can not be substantiated by AT (k) and, the EEKD is provisionally certified by the one-sided European Case Study Document (EEKD)nt:
A Kbt.67. Section (1) based on AT - if applicable, (X.30.) Korm. (Kr.) II. (1) of the Decree of the Minister of Finance of the Republic of Croatia (hereinafter referred to as "the EEKD") shall be submitted to the EEKD in accordance with the provisions of Decree 321/2015. . The jury reminds us of the 424/2017. (XII.19.) Korm. R. (2) of the EDF Regulation and Article 13 of the EDF Regulation - The EEKD shall be subdivided into the grounds of Section 4 and 6 to 7 of the Code. . Section 64 and Section 4 (3) of the CR, Article 10 (3) of the EDF Regulation. prevail.
On subcontractor aspects that do not participate in the alk. as stated in Section 65 para. (4). AT bases must have a statement about it, hogy does not apply for the Kb. Section 62 (1) to (2), Section 63 (1) according to the exclusion criteria. Section 69 (4) - (6) based on the Appointed AT, in accordance with Sections 8 to 16, h. does not fall within the scope of exclusionary reasons.
In the case of a current version of the filing file, AT is prompted to attach a filing file to the filing box and its filing(the statement of the negative content statement is too tender)
Article 1 para. (7) of the Cr. vegzesere vonatkozko alk. First Aid:
With the preliminary confirmation of EEKD - the Kbt. - 67 (1) to (3) and Section 1 para. (1) of the Cr. Section 2 (5) accordingly - AK accepts the owner (AT, koezoes AT, capacity-secured bodyzet) a simple statement that EEKD is sufficient for the IV. resection point α. The submission of these documents is excluded by the express mention of the CA concerned by the provisional proxy. Article 69 (4) Based on. The one-off European documentary document (s) must be enclosed in the EDF. Attendance remembers the attention of the EDF RegulationSection 12 (2), Section 13.
NY.1.)
AK is the number of entries in the register of the Kbt. (11) of Article 69. If there is no modal excerpt from the register in the registers of the Kbt. Section 69 (11) of the Kbt.it is justifiable to justify the fact that the document is authenticated in the public register with a simple statement. Verification of the Kbt. Section 65 (7), (9) and 69 (11).
NY.1) Unsuitable AT if it is not listed in the name of the relevant Chamber of Commerce in connection with its design services related to the epithet's busi ness, or the non-Hungarian gas(in the case of non-residents), there is no law in the country of establishment (it is assumed that the right of the sovereign country is a pre-emptive one) or by a licensed, legitimate or organizational or chamber member in the country of residence (Kbt.65 -- 1). (c) and 322/2015. (X.30.) Korm. decree - 8 - 1).
With the EEKD with the provisional confirmation - the Kbt. 67th-- (1) to (3) and Section 1 para. (1) of the Cr. Section 2 (5) - Adoption (AK) is accepted by the economic operator (Provider (AT), Provider Provider, Providing Capacity Provider) a simple statement that EEKD is sufficient for IV. resection point α. The submission of these documents is exclusive to the express proponent of the CAhivasara on the Kbt. Article 69 (4) Based on. The one-off European documentary document (s) must be enclosed in the EDF. The Trustee draws attention to Article 12 (2), Article 13 of the EDF Regulation.
P.1) Section 19 para. (1). (in the case of a case-by-case basis), the date of the end of the dayand a statement made by a senior member of the Board of Directors, with the undersigned and explicit content, attentively to the fact that whenever a letter is sent to letter or letter, when it started to work if these data were available to you:
- give me a penzforgalmi szamlaszam, - - had it been 15 days longer than the queer row allitas the felhivas feladasatin the previous 12 months.
Under the terms "Quotation", the Ajanlatkero is bound by the term defined in - 25, paragraph 25 of the Act LXV of 2009, that the aforementioned person may also attach the certificate to the canceled courtroom by the fact that any of the defendant receives a probationary evidence .
P.2) In accordance with Article 19 (1) (b) of the Criminal Code, the time of the originator (in any AT koezoes AT)(if the law of the country of the owner of the owner of the owner of the host is present). If you are able to access the homepage of the Ceginformation Service website, you will be informed by the Provider of the information provided in the coginformation service websiteif the Beneficiary does not have the period of time prescribed by the P.2, because he has begun to work after the start of the period, he will be able to justify the amount of the co-purchased purchase. The Ajanlatkerő is trying to survive the Penzuegy and the economic opportunity of the Provider if they are artificial-P.3) Contract covered by the Government Procurement Agreement (GPA) is hereby verified as a minimum quantity of 5 000 000 HUF. Section 65 (1) (a) and Article 19 (1) of the Criminal Code. (c) AT adds the deadline for submitting the deadline for submissions to the last 3 seizure(3) of Section 19 of the Criminal Code of the United States of America, in the case of a criminal offense, the Kbt. 65 (7) to (8) and 67 (3), 69 (11).
1. The adhato point is the essay of the points of viewten 0.00-10.00 points. Ert. 1. ar: Translated Golden Position, 2nd Score 2.1 0 Editor 0 Points, 1 Editor 5 points, 2 or above Editor 10 points, 2.2 0 Designers 0 points, 1 designers or over 10 points. The KD includes a versatile version of the standard mods.
2. The timing must include:
- In the meantime, Article 11 (1) of the EDF Regulation is based on the EDFthe form must be enclosed with the appropriate reading instructions, - if the person authorized to register and the person to be assisted by the trial is also a party to the trial. Article 66 - (2), - - For those who make time for the EDR RendeSection 20 (4) of the Basic Law shall not be required to give a statement on the application. (4) of Section 66 of the Act, - Provider of the Kbt. Section 66 (6) . (with negative content)
- is displayed. the Kbt. Section 65 (7) (in conjunction with a negative content), in relation to the skilled artisan, with reference to the present invention, In KD,
- data management statement.
3. Provider is the Section 30 (4) of the Criminal Code. according to the provisions of Sections III.1.1-3), it is subjected to the strictest sub-clause of Section 28 para. (3).
4. The Kbt. Section 71 (6) in the case of Hianypotlass, the promoter shall include a host-The timer is limited in length to provide the Hierypotlas opportunity.
5. The timekeeper is the most timely at the time of the contractor min. this is 15 millio Ft / ev and min. 3 Million Ft / karememeny dwarf design author.pls.
6. In the case of point IV.2.6, during a month, 30 days are issued. FAKSZT: dr. Judit Pete (registration number: 00353), Dr. Attila Pal (registration number: 00089). Recommendatkerő does not apply the Kb. Section 75 (2) (e)).
9. This is the tender form. Article 105 (2) (c) of Chapter 307/2015. (X.27.) Government Order no. Section 18 applies
10. The timekeeper is using a timely application on the EDR to use a cross-checker application to make it easy to read and not editable pdf formatg.
11th The sponsor reminds us that the use of the EDF, such as the adjournment of the time, is subject to the consent of the authorized person [Article 6 (1) of the EDF Regulation). The timeframe reminds the callers that attention has to be paid to the provisions of - 10 (1) to (3) of the EDF Regulation
13. The applicant shall be eligible for the appropriate test methods and the justification for the exclusion of exclusion may be based on Article 12 (2) of the EDF Regulation. The time limit for issuing the electronic declaration in electronic form in the EDF and the right to vote for the complainants is in accordance with the provisions of Section 13 of the EDF Regulation
tively. 15th In this timeframe, we will not be able to find out what's going on in the CXLIII. toerveny (Kbt.) and the relevant regulations are ireland. In this case, the application of the EDF Regulation is explicitly mentioned
Internet address (URL): http://www.nkmaramhalozat.hu
Documents
Tender Notice