Procurement Summary
Country: Ireland
Summary: Contract notice: Electrical machinery, apparatus, equipment and consumables; lighting
Deadline: 18 Oct 2017
Posting Date: 21 Sep 2017
Other Information
Notice Type: Tender
TOT Ref.No.: 16680020
Document Ref. No.: 370235-2017
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
31000000 - Electrical machinery, apparatus, equipment and consumables; lighting
31200000 - Electricity distribution and control apparatus
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Electrical machinery, apparatus, equipment and consumables; lighting
Description: Contract notice: Electrical machinery, apparatus, equipment and consumables; lighting
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 31000000, 31200000, 31000000, 31200000
CPV Description: Electrical machinery, apparatus, equipment and consumables; lighting.
Electricity distribution and control apparatus.
Design, specify and supply an AC to AC power take off and control system for 25 kW Hydro-kinetic Turbine.
Reference Number : DesignPro DPR25 PTO and Control
DesignPro is developing a prototype 25 kW hydro-kinetic turbine to convert kinetic energy in water flows to electrical power. The design of unit incorporates 2 hydro-kinetic turbines that each drive standard induction motors via an in line gearbox to generate 3 phase AC power. The power output varies with the rotation of the turbines. DesignPro requires an integrated PLC control system + AC to AC power take off system that can utilise the operational parameters of standard 3 phase induction motors to control turbine rotational speed so as to optimise power output and efficiency. The system must also be capable of adapting the initial power outputs of the induction motors to a standard that is acceptable for injection into the power grid. The gearboxes and induction motors will be supplied separately and do not form part of this tender request. Tenders for the design, specification and supply of the PLC control system + AC to AC power take off are being requested.
Main Site : Design and bench testing at supplier site, prototype integration and testing at DesignPro site.
DesignPro is developing a prototype 25 kW hydro-kinetic turbine to convert kinetic energy in water flows to electrical power. The design of unit incorporates 2 hydro-kinetic turbines that each drive standard induction motors via an in line gearbox to generate 3 phase AC power. The power output varies with the rotation of the turbines. DesignPro requires an integrated PLC control system + AC to AC power take off system that can utilise the operational parameters of standard 3 phase induction motors to control turbine rotational speed so as to optimise power output and efficiency. The system must also be capable of adapting the initial power outputs of the induction motors to a standard that is acceptable for injection into the power grid. The gearboxes and induction motors will be supplied separately and do not form part of this tender request. Tenders for the design, specification and supply of the PLC control system + AC to AC power take off are being requested.
Tenderer must demonstrate professional capacity to supply equipment and services.
Internet address (URL): http://designpro.ie/
Directive: Classical Directive (2014/24/EU)
Documents
Tender Notice