PHNOM PENH WATER SUPPLY AUTHORITY has floated a tender for Contract notice: EIB - Bakheng water supply project. The project location is Cambodia and the tender is closing on 16 Jul 2018. The tender notice number is 258501-2018, while the TOT Ref Number is 24232029. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Cambodia

Summary : Contract notice: EIB - Bakheng water supply project

Deadline : 16 Jul 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 24232029

Document Ref. No. : 258501-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : PHNOM PENH WATER SUPPLY AUTHORITY
Office Name: Phnom Penh Water Supply Authority

Town: Phnom Penh



Phone: 855-23-427 657
Cambodia
Email :samreth_sovithia@ppwsa.com.kh

Tender Details

Object of the contract
EIB - Bakheng water supply project

Description: Contract notice: EIB - Bakheng water supply project

Authority Type: Utilities entity
Contact Nature: Works
Procedure: Not specified
Document: Contract notice
Regulation: European Investment Bank, European Investment Fund, European Bank for Reconstruction and Development
Award criteria: Not specified
CPV code: 41110000,
CPV Description: Drinking water.

The Kingdom of Cambodia (hereinafter referred to as "the Borrower") has applied a loan from the European Investment Bank (EIB) and Agence Francaise de Developpement (AFD) (hereinafter referred to as "the Financing Institutions") towards the cost of the Bakheng Water Supply Project. This international invitation for pre-qualification relates to the contract for Bakheng Water Production Facilities. The applicable procurement rules for this tender process are AFD's procurement guidelines..

This contract is split into Stage 1 (fixed component) and Stage 2 (optional component), and will include for the fixed component: the design and construction of an intake facility (capacity 406 MLD, equipment for 203 MLD), a raw water transmission main (ND 1 800 mm, length 1 040 m), a water treatment plant (capacity 195 MLD with some facilities common to both stages and sized for 390 MLD), a treated water transmission main (ND 2 000 mm, length 7 000 m) and the crossing of the Tonle Sap River (ND 2 000 mm, length 550 m)..

This contract is expected to be implemented from the first quarter of 2019, for a duration between 36 and 46 months for Stage 1..

The criteria to be used in the pre-qualification evaluation are:.

1) eligibility: eligible nationality, absence of conflicts of interest, not ineligible to AFD financing, specific criteria for state-owned entities, .

2) historical contract non-performance: no default in the past 5 years, not under suspension based on execution of bid security, pending litigation 10 000 000 USD), transmission mains ( 15 000 000 USD), water treatment plant ( 30 000 000 USD), river crossing ( 5 000 000 USD); specific key experience in construction of intake ( 250 MLD), water treatment plant ( 120 MLD), reservoirs ( 30 000 m3), SCADA, pumping station ( 3 500 kW), transmission mains (ND ? 1 400 mm), river /obstacle crossing ( 350 m and ND ? 1 400 mm), .

5) personnel & equipment: ability to mobilize in-house personnel on site for project manager, construction manager and engineers for design, civil works, river works, pipelines, M&E, automation; ability to mobilize sufficient specific equipment for construction, .

6) environmental, social, health & safety: ISO 9001, 14001 & 18001 certification or equivalent, acceptable in-house policies, 2 contracts in the last 5 years with major ESHS measures, in-house ESHS personnel..

All firms are invited to participate in the pre-qualification..

Interested eligible Applicants may obtain further information from, and inspect the prequalification documents at:.

.

A complete set of pre-qualification documents may be purchased on the submission of an application to the above address, and upon payment of a non-refundable fee of 100 USD by cash or cashier's check. The documents will be sent by mail or delivered locally..

All applications for pre-qualification must be delivered in sealed envelopes bearing the mention "Application to Prequalify for Design and Construction of Bakheng Water Production Facilities IPC No. BKG-CW-01-PPWSA/AFD" not later than 16.7.2018 14:00 local time at the following address:.

Dr Sim Sitha, Director General.

Phnom Penh water supply authority.

#45, Street 106, Sangkat Srash Chak, Khan Daun Penh, Phnom Penh, .

Kingdom of Cambodia.