„ВОДОСНАБДЯВАНЕ И КАНАЛИЗАЦИЯ“ ЕООД — СТАРА ЗАГОРА has floated a tender for Contract notice: Construction work for water and sewage pipelines. The project location is Bulgaria and the tender is closing on 26 May 2020. The tender notice number is 165269-2020, while the TOT Ref Number is 42110796. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Bulgaria

Summary : Contract notice: Construction work for water and sewage pipelines

Deadline : 26 May 2020

Other Information

Notice Type : Tender

TOT Ref.No.: 42110796

Document Ref. No. : 165269-2020

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : „ВОДОСНАБДЯВАНЕ И КАНАЛИЗАЦИЯ“ ЕООД — СТАРА ЗАГОРА
Office Name: „Водоснабдяване и канализация“ ЕООД — Стара Загора
Address: ул. „Христо Ботев“№ 62
Town: Stara Zagora
Postal Code: 6000
Contact Point: Пламен Вълков

Phone: +359 42601476
Fax: +359 42601476
Bulgaria
Email :pvulkov@wik-stz.com
URL :http://www.wik-stz.com

Tender Details

Object of the contract
Construction work for water and sewage pipelines

Description: Contract notice: Construction work for water and sewage pipelines

Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45231300, 45231300, 45231300
CPV Description:

Engineering (design, supervision and construction) - external water supply pipelines - 3 positions

The subject of the contract is related to the preparation of an investment project in the phase of a working project, construction and authoring during the construction of the External Inlet Water Supply from the Collectorroom "Sahrane" to the pumping reservoir V = 2 000 m of the Central Water Supply System - Kazanlak ", to the site" Distribution water supply system from the reservoir V = 11 000 m to the primary school 9, water supply system "Stara Zagora - second trunk diversion" and to the object " plumbing from the Danube Air Force - Stara Zagora.

Main Site: The territory of Stara Zagora District, Republic of BULGARIA

Subject of the contract on Lot 1: Exteriorn water supply line from the Sahrane assembly room to the pumping reservoir V = 2000m3 of the Kazanlak central heating system consists of the following:

Activity 1: Development of a working investment project for the site. The following tasks are included in the activities:

1. review of the existing preliminary investment project, as well as other initial design data;

2. Development of the investment project in phase"Work" project on all parts contained in the conceptual design, as well as in other design parts necessary for the approval of the work design and the lawful commencement of construction;

3. related to the conformity assessment and approval of the investment project.

Activity 2: Execution of a builderinstallation works for the site in accordance with the scope and content of the investment project approved under the current legislation. Within the framework of the activity, the contractor performs all construction and related works in accordance with the scope and content of the investment project, which has been agreed and approved in the appropriate order. Also, the contractor must prepare within the contractand executive documentation in DWG format, which should include graphical objects, each with a unique identifier (id). An accompanying xlsx (Excel) file is prepared for each file in DWG format, which contains the descriptive information / characteristics of the objects in the DWG file with their unique identifiers entered. Linear objects (water mains) must be separated and describedand from axis to axis (node to node). The data in DWG are packaged (eg zip) together with descriptive information in xlsx format and provided to the contracting authority, recorded on disk or other electronic medium. All this in accordance with the general conditions for carrying out construction works in the Company.

Apart from the above, the contractor performs cadastral recording of the whole construction and provision in the respectiveGeodesy, cartography and cadastre data service according to Art. 54a, para. 2 of the Cadastre and Property Register Act. In addition, within the framework of the contract, the contractor performs all necessary samples and tests during the execution of the construction works until the completion of the project and its submission to the Contracting Authority, as well as samples after completion.Construction works. When executing the contract, the contractor performs the functions of copyright supervision during the execution of the construction works within the meaning of the applicable legislation in force, including:

• changes in the approved investment project, in accordance with Art. 154 of the Spatial Planning Act / if necessary;

• explanations of the design decisions / if necessary /;

• participation in the drafting of acts and protocols during construction;

• Participation in regular meetings organized by the Construction Supervision with the participants in the construction process;

• Preparation of orders in the Order Book;

• Participation in state admission committees.

This first position includes the following:

External water supply line with length about 12.5 km and other facilities.

The participants must be entered in the Central Professional Register of the builder for fulfillmentwe are in the works of the fourth group, the first category, whether they participate in 1 or 2 or 3 separate positions, and for non-residents - in similar registers according to the legislation of the Member State in which they are established. In the event that the participant participates as a grouping / consortium, such registration must be held by each member of the grouping / consortium who will carry out the registration.Initiative activities according to Art. 3, para. 3 and para. 4 of the LCA.

When a tenderer envisages the participation of subcontractors, the requirement is proved for those subcontractors who, according to the type and share of the contract they have been awarded, will perform the construction. complete the relevant section in a single European document hand Public Procurement (OEDOP) - Opportunity section of OEDOP.

Proof of the stated requirement

The document proving the requirement is a certificate for entry in the CPSC to the Construction Chamber for execution of construction works of the category of construction, in which the object of the order: construction of the fourth group, the first category If the participant is a foreign person, he may submit a validequivalent document or declaration or certificate issued by a competent authority of a Member State of the European Union or of another State Party to the Agreement on the European Economic Area, proving the entry of the participant in the relevant register of that country. the requirement made shall be submitted by the participant designated forcontractor, or upon request during the procedure in the cases of Art. 67, para. 5 and Art. 112 PPL. Documents shall also be submitted to subcontractors and third parties, if any.

1. Documents to prove the requirement under Art. 62, para. 1, item 1 and / or 3 and / or 4 of the Public Procurement Act - 1 or several of the following documents in connection with the requirement:

1. bank certificates;

2. annual financial statementsor their constituent parts when their publication is required under the law of the country in which the participant is established;

3. a reference to the total turnover and / or turnover in the area covered by the contract.

When the tenderer is not able to present the documents requested by the contracting authority for a reason, he can prove his economic and financial status by means ofand any other document that the contracting authority considers appropriate.

The documents for proving compliance with the set requirement shall be submitted by the participant designated as a contractor or upon request during the procedure in the cases of Art. 67, para. 5 and Art. 112 of the PPL. Documents shall also be submitted to subcontractors and third parties, if any.

2. Documents to prove the requirement under Art. 62, para. 1, item 1 and / or 3 and / or 4 of the Public Procurement Act - 1 or several of the following documents in connection with the requirement:

1. bank certificates;

2. the annual financial statements or their constituent parts, when published in accordance with the law of the country in which the participant is established;

3. a reference to the total turnover and / or turnover in the area covered by the order.

Whenit is for good reason that the tenderer is not in a position to present the documents requested by the contracting authority, he can prove his economic and financial status by any other document that the contracting authority considers appropriate. designated as contractor or upon request during the course of the in-service proceedingsteas of art. 67, para. 5 and Art. 112 PPL. Documents shall also be submitted to subcontractors and third parties, if any.

1.Tech. and Prof. Opportunities: requirements for experts from 5 to 10 incl .: The expert should have a specific experience in completing 1 design for the part of the investment. project for which is proposed in this contract. 1 expert can combine more than 1 position (5 to 10 incl.) Inin the event that it corresponds to those indicated for the corresponding. position requirements, but this is only valid for participation in only 1 position, if two or three axes are involved simultaneously. positions, participants should have separate teams for each position, and for each position this item is applicable individually. For foreign persons, Eq. documents to be followed by the legislatorthe state of the country where they are established. In the case of a non-legal entity, the requirement under item 3 applies to the entity as a whole. When using a subcontractor, the requirement under item 3 also applies to each of the 1 subcontractors, according to the type and proportion of the contract they will fulfill. When submitting the offer, the Student shall provide the information required in Part IV, "Selection Criteria", "V. Theyx. and professional abilities. "of the EDES for the professional competence of the management staff, as required by the contracting authority in the doctrine of the manner in which information is provided. With the participation of a non-legal entity, the relevant information shall be completed in Part IV., "Selection Criteria", "C. Tech. and professional abilities. "EEDOP of the members of the association, through which the student proves the requirements and documentThese are submitted by these members. With the participation of subcontractors, the EDES and the documents shall also be submitted for each of the subcontractors indicated.

2. Award criterion: optimal price / price ratio, which is evaluated on the basis of price as well as indicators including quality, environmental. and social aspects. KO has a poppy. value is 100 t. The formula is: KO = P1 P2. Indicator P1 includes the following sub-itemsindicators and their constituent components (compulsory and upgrading): 1. Design and construction works; 1.1.A.Prime for design and construction, guaranteeing the fulfillment of the order; 1.1.B.Organization of staff in relation to mutual relations. m / in the countries during delivery of the order; 1.2.A. Linear mud. schedule and pr-e for their tech. last, continued and distribution over time of work; 1.2.B. Design and construction works, guarantor2. Social and environmental aspects related to and / or arising from the subject-matter of the contract, divided into 2.1.A. Environmental protection measures, 2.2.A. General social aspects and 2.2.B. Specific social aspects. Max. the points of these sub-indicators from the first evaluation indicator are 60 points. The second indicator is P2 Bid.

P2 = Proposedminimum price in lev (excl. VAT) * 40

offered price by the participant in lev (excl. VAT)

3. Authorities providing the information. for taxes, environment, employment protection and working conditions are: NRA, MOEW, EA and EA "GIT".

4. SPEC. NAT. GROUNDS FOR EXCLUSION: The student should declare the absence or presence of a conviction for a crime under Art. 108a, Art. 159a-159d, Art. 172, Art. 192a, Art. 194-217, Art. 219-252, Art. 253-260, Art. 301-307, Art. 321, 321a and Art. 352 - 353f of the Criminal Code; The student (and only he) shall not be a related party to other participants in this procedure, in accordance with Art. 101, para. 11 PPA; The participant should not be identified with the effective date. decree, or judgment, violation of Art. 61, para. 1, Art. 62, para. 1 or 3, Art. 63, para. 1 or 2, Art. 118, Art. 128, Art.228, para. 3, Art. 245 and Art. 301-305 of the Labor Code or Art. 13, para. 1 of ZTMTM or similar obligations established by an act of com. an authority under the law of the country in which the study is established or similar obligations established by an act of com. an authority under the law of the country in which the participant is established; The circumstances under Art. 69 of the CITAA and the Code shouldmeet the requirements of Art. 3, item 8 and art. 4 by ZIFODRUPDRKTLTDS.


Internet address (URL): http://www.wik-stz.com

Documents

 Tender Notice