Cross Icon
Cross Icon

Contract notice: Construction work for sports Tender - 29848037

The NOTRE DAME N?I KANONOK- ÉS TANÍTÓREND has issued a Tender notice for the procurement of a Contract notice: Construction work for sports facilities in the Hungary. This Tender notice was published on 15 Jan 2019 and is scheduled to close on 12 Feb 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29848037, while the tender notice number is 017867-2019 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Hungary

Summary: Contract notice: Construction work for sports facilities

Deadline: 12 Feb 2019

Posting Date: 15 Jan 2019

Other Information

Notice Type: Tender

TOT Ref.No.: 29848037

Document Ref. No.: 017867-2019

Competition: ICB

Financier: Self Financed

Purchaser Ownership: -

Tender Value: Refer Document

CPV Classification

45212200 - Construction work for sports facilities
45000000 - Construction work
45212222 - Gymnasium construction work
45223300 - Parking lot construction work
45311000 - Electrical wiring and fitting work
45311200 - Electrical fitting work
45330000 - Plumbing and sanitary works

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Object of the contract
Construction work for sports facilities
Description: Contract notice: Construction work for sports facilities
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45212200, 45000000, 45212222, 45223300, 45311000, 45311200, 45330000, 45212200, 45212200, 45000000, 45212222, 45223300, 45311000, 45311200, 45330000
CPV Description: Construction work for sports facilities.
Construction work.
Gymnasium construction work.
Parking lot construction work.
Electrical wiring and fitting work.
Electrical fitting work.
Plumbing and sanitary works.
Tornacsarnok es vivoterem epitese
Reference Number : EKR000009212019
Uj, az MSZ 24203-2 szerinti 'C tipusu' tornacsarnok es a vele oesszekapcsolt vivocsarnok letesitese a szuekseges infrastruktura account is taken by the presenter of eskoez and sport technology
Main Site: 8900 Zalaegerszeg, 25. Zarda utca (976/2 es 976/3 hr.)
The gymnasium is 29, 4x44, 6 m with belmagassagu, 9, 1 m free belmagassagu, harom it can be divided into a natural truss, with a pre-cast reinforced concrete pillar frame with a 228 m long lattice, covered with a steel ratchet structure. The carriage is 18x38.1 m wide, 3.8 m widebad belmagassagu, monolithic and pre-cast reinforced concrete elements. The Elephant Servant Serving Squares are traditional masonry, monolithic vb. structure. The useful base-space of the letessitmeny oesses in Oesszessegeb is 3994 m. The deposit is to be completed in a complete, usable design, with the epileetepes, electric and sports technology equipment. Epueletgepeszthe task is to increase the heat production equipment with 2 150 kW gas boilers and the epithelium of the heating pipelines from the boiler house, the hot water inlet, the underfloor heating of the gym hall, the hot water heater heater in the vivocsarnot, the acoustic plate in the radar heater service spaces in the halls and the halls, the hall is cool and vent, standard, driver, rwith sound attenuating elements with a power supply of 5500 lm / h with regenerative energy recovery, vivoterem fresh air, balanced ventilation system with 4 200 lm / h treatment equipment, installers, showers, toilet blocks, indoor spaces with fresh air, depressed The volume of the air vent is between 2 800 and 3 800 1 200 lm / h. EThe main task of the power supply is the standard of the standard, the reliability of the power supply, and the power transmission of power. The power supply of the designed electrical equipment: 120 kVA The equipment of the epuelet: fire alarm, property management, camera monitoring system, information technology horns, sound, heat-storing, 4-storey unassembled car, mobile routing, sport technology, lelato pI'll give you fire fighting equipment. The task was to cover the epuel of the condominium joints of the epuelet, the tapeworms and the baileli transported on the property. The surface area of the road pavements and 24 parking spaces is 810 m, and the terrain area of pedestrian traffic pavements is 1145 m. Flush-mounted fence and street 187 fm
Fences, gates, roundaboutstarolo epithelium as well as keszoeboek, traffic jams, traffic jams, new yard and 45 parking spaces, oesszesen 1530 m terueleten. The existing basketball and tennis rackets are linked to the showdown, chest breaks down, a new basketball palace is under way, and the inside of the cage is organized. The content of the technical documentation is the full details of the investmentDISCONNECT. Designer works on the basis of the engineering design documentation (with the fact that the embedded furniture is not present), in a complete dog, technically and qualitatively impeccable design, in terms of specifications, technical standards, and in the modern field of technology, in accordance with the standards. take care of it with care. Foreword a321/2015. (X.30.), - 46 (3) of the Government Decree on roegziti, that in the technical literature, the stipulated factory or origin of the thing or concrete, which is the character of a given farmer or the halls of services, or the ticket, patent, activity, person, type, or specific origin or manufacturing processrefers to the complexity of the authorship of the authors, and the epitome of the epitaphs of the author of the author, who is the one who has a unique character. In such a case, "or equivalent" should be established by the fact that the proof of the equal measure is the task of the timekeeper.i a Kbt. Section 62 (1) - (2) below specifies the reasons for the exclusion, or who causes the expulsion in the first place. Article 67 (1). According to EEKD, it must be proved in advance that Kbt does not belong. Section 62 (1) - (2) The scope of exclusions specified in the exclusions. In the case of Koezoes, the koezoes are in the form of a timerprints. It can also be used as a reader sub-agent or organization. In the newsletter, the timer must get in on Kbt. Article 67 (4). es 321/2015. (X.30) Article 15 (2) of the Cr. the declaration. Kbt. Article 69 (4). Basically invite the newsletter to your real estate. 321/2015. (X.30.) - 8, -- 10-14. And - 16 and -16to say that Kbt does not belong. The power of the exclusions referred to in - 62 para. The newsletter must include an up-to-date statement about whether or not it is in the process of entering an entry. The timeline brings attention to Kbt. Article 64. t The excerpts issued prior to the start of the expulsion are also included in the exclusionsthatoak (usable) as long as the contents of the textbooks are full or the data content is true. Until the contrary is proved, the data content of the data is neglected by the notifier's statement on this subject. No. 424/2017. (XII. 19.) In Section 12 para. (2) of the Cr., The reasons for the expulsion are not valid in the dogs.las imprujtaa, which was filed electronically in the EDF in the past by the owner of the prophecy in the past. In this case, the host participant declares that the earlier authenticated certificate will take the biralat line into consideration. 321/2015. (X.30.) In the case of Section 12 of the Cr.
Iranyado: Kbt. Article 64 (1) - (2). B) Prerequisites for Professional Entries: According to Section 212/2015 (X.30.) Kr., The host entity engaged in the construction work of the construction industry in Hungary must be included in the Etv. according to the construction industry. He is a non-Hungarian resident hosta member of the registered office of the country in which he is established, or a permit, legal entity or organization or chamber established in the country in which he is established, tagsag sux. These results are not an incompetent timer. True Mod: The Kbt. Article 67 (1) of the EECD. (X.30.) Article 2 (5). Based on Reward Force adopts the affluent host roleShoot simple statement. True to Kbt. In accordance with Section 69 (4) of Act No 322/2015. (X.30) Article 21 (1). and Kbt. Article 65 (1). point c). In the case of a hired economic operator established in Hungary, the registered participant of the registered office checks the activity of the construction industry on the basis of the data of the notepads of vets, not a farmer established in Hungary.in the case of sagi in the European Parliament and Council Directive 2014/24 / EU. to issue a certificate (extract) or other certificate or statement according to the registers listed in Annex I, subject to the provisions of Article 321/2015. (X.30.) Section 1 (2) - (5) of the Cr. The correct case is Kbt. Section 65 (7), (9), (11) and Kbt. -- (11) of -- 69.
The Kbt. Article 67 (1)according to the EECD declaration that it fulfills the pre-requisite test (s). 321/2015. (X.30.) Based on Section (5) (2) of the Criminal Code, the preliminary statement of the appropriate co-author shall accept the simple declaration of the host. Iranyado continues on 321/2015. (X.30.) Paragraph 3 (2) - (3) of the Cr. True to Kbt. According to Section 69 of Act No. 321/2015. (X.30.) Krbelow: "Kr.") Section 19 (1) (c) is based on the date on which the Proponent has dropped off. ev arbeveteli's data, this is the beginning of the activity of the past, full net arbitration must overcome the predecessor oe(in the case of an incomplete transaction, one per annum). According to Section 19 para. (3) of the Cr., If the subscriber does not possess the document referred to in Section 19 (1) (b) or (c) of the Cr. is not possible, the appropriate verbatim and verifiable proof of these pointsInstead of using mods, any other statements or documents considered appropriate by the news agency can prove the suitability of the host company. The Sequeled Attendant's Complementary Guide seeks to find out the legal form of a legal form which, in the light of the statement of the proclamation or the vowel, is not possible and can not be found.Instead of a suitable modular and verifiable modus operandi with respect to these points, they are appropriately certified for moderated modality. The contributor contains a complete set of data regarding the performance of appropriate tissue engineers, and the Kbt. Article 69 (4) - (7) of the Ajanlatkerő impresses the adventurousAfter heating. Section 19 (3), (6) and (7) of the Cr. prevail. The koevetelmenie can be matched by the coezoes AT. In case of a proper reader, the Kbt. Section 65 (7). iranyado, and Ptk. 6: 419th Responsible for the Newsletter, according to the provisions of -- 1, 2, 3, 4rt. Take a look at Kbt. Article 65 (11). Kbt. Section 140 (9). Kbt. Article 65 (6) - (8) and (11) and Section 67 (3). Certificates issued prior to the beginning of the coezing process will also be coveredthey can be used (as they are used) as long as the contents of the textbooks or the contents of the data are true. Until the contrary evidence is provided, the data content of the data is neglected by the notifier of the report. No. 424/2017. (XII. 19.) Government Decree No. 12 (2) of the Code of Conduct for suitable dogs to be eligible for the host actThis is the introduction of a truth that was filed in the EDF electronically in the EDF before the prophecy of the Prophecy. In this case, the host participant declares that the earlier authenticated certificate will take into consideration the biralat line. The repetition of the news was made by the tax advisers. The noise. FU. HUF 16, 000, 000. THEz ATs for aj. they are encouraged to put their tongues together at the same time as they introduce their schedule. The noise. assures AT of the drive. koetoetted beave the brain. should be maintained for the duration of the co-operation, or until the author has agreed. The Kbt. Article 54 (2) with regard to timing. AT can be considered to be enforceable. AK's Pay Sampled: 11749008-24905617 Samam Bank Samples with OTP Bank Plc. THEdeposit. In case of bankruptcy (atutal) of the bank's bankruptcy, the bank shall attach to the bank's cash deposit certificate and in case of bankruptcy the bank shall attach to the debit certificate issued by the bank. The noise. FU. Penzuegyi Internship Guarantee or Assurance Guarantee Form, or Penzuegyi Indemnity Guarantee / Insurant Warranty Guarantee in the case of an overdue claim on the basis of an insurance policy of your Insurert, or the commissioner of the commissioner of the commissioner, based on the exposition of the expedient, attaches to the probative. We raise the attention of ATs to the provisions of Article 424/2017 (XII.19.) Korm.r.10 (4). For more information, see Koezb. Guide.
2nd K from lezaro doentes to Kbt. Section 70 (1) - (2) of the ATT. Kbt. Article 131 (6) at the date specified in keruel line
4.The AK is the hp. make Kbt possible Article 71.
5. Responsible accredited chief accredited professional lecturer: dr. Eva Kovacs, Registration: 00852
6. AK is not appropriate. the Kbt. Section 75 (2) (e). K does not hold any position or consultation. The point of view is that the best gold is gold. Also the upper limit of the given point is allIn case of ert-i in the case of the river: 0-100 points. Koezb.
9. AK laid down the P / 1., M / 1. es M / 2. terms and conditions. The report can be found in Section 42 (2) of Government Decree 424/2017 (XII.19). base electr. peIt should be pushed in. the bather must include the complete schedule in an electronically displayed format in one or more files. The report shall contain a read-out sheet, which shall be set out in the format of the electronic form provided by the EDF in the form of an electronic form (Article 42 (1) of Government Decree 424/2017 (XII.19)).
11th AT (koezoes AT)to announce the Kbt. Article 66 (2) and (6) (a) and (b). The arrow. with negative content. The host. actors in Kbt. Article 66 (4) shall be made by the registrant recruiting in the EDF, and not to make a statement in advance.
12th The AK host organization excludes basic ATs and ATKs ATs.
13th THEhow much is AT the capacity of a real-time organization tends to tumble, Kbt. In accordance with Paragraphs 65 (7) of this Act, the organization shall indicate this organization in the schedule and the relevant clauses shall be indicated in the schedule. koev or koevs, which in the forests of the alphabet are the resources of this organization or it is rushing.
14th AK prescribes that AT has to have an outletitelezes has a total duration of at least HUF 1, 000, 000, 000 / year, and is responsible for this work with responsible car system (oyster) epite-fitting works.
15th The contractor's condition is that the winning AT must have an MSZ EN ISO 9001: 2009 qualification. with tanusit, ISO 14001. I have a system alarmMSZ 28001 (OHSAS 18001) Workplace Assistant. and a trustworthy system based on a trusted system or certified by any organization accredited in any national system, or qualified in the field. and the security system of the security system has made the most of the documents.
Internet address (URL): http://www.mindszenty.net

Documents

 Tender Notice


Similar Tenders

Request Demo
GiZ Tenders India

Procurement Documents for Hungary

Access a comprehensive library of standard procurement documents specific to Hungary. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Hungary

Explore Procurement Documents for Hungary


Want To Bid in This Tender?

Get Local Agent Support in Hungary and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?