Procurement Summary
Country: Hungary
Summary: Contract notice: Construction work for school buildings
Deadline: 30 Apr 2020
Posting Date: 31 Mar 2020
Other Information
Notice Type: Tender
TOT Ref.No.: 41961858
Document Ref. No.: 152045-2020
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45214200 - Construction work for school buildings
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Construction work for school buildings
Description: Contract notice: Construction work for school buildings
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45214200, 45214200, 45214200
CPV Description: Construction Work for School Buildings
Renovation of School Buildings Devavanya, Vest
Reference Number: EKR000118112020
Timelines 1-3. Regarding EFOP-4.1.2-17-2017-00087, and Regarding EFOP-4.1.2-17-2017-00057, you are planning to upgrade your school epuelets in the following locations: Reserve 1 - Devavanya, 4-6 Voeroesmarty Street. Secondresz - Devavanya, Koeroesladanyi u. 1. 3. Res - 6-8 Devavanya, Gyoengy Street. Item 4 - Upgrading losing classrooms Planned implementation activities 1-3. In the case of parts, permission is granted with the use of a nickel, with the permission of part 4.Technical Description ". This keruel describes the modified technical content. The unfamiliar coals are in harmony with the modified technical content. Devavanya: Voeroesmarty Street 4-6, No. 1903;
Voeroesmarty street 4-6. No. 1903 Main Quantity Details of Works under No. 1 (Site No. 1): Epuelet Base Area: Outside 3265
M2 (Ground Floor: 1467m2, Floor: 953 m2, Attic Area 845 m2) o Renovation of Gym Floor Structures with Sports Floor Covering, 276.64 m2
A During the renovation, a new sports floor covering will be installed for installation in the final stage of 276, 64 m2. The upside of the palya is the suya palyait is necessary to make the markings painted by marking the corners of the markings with a ribbon and a ribbon, so that it penetrates into the veins of the floor covering completely, or completely excludes the need for a four-component paint. o Renovation of asphalt pavement courtyard with AC 8 grade asphalt pavement, 800 m2on the asphalt pavement, creating a base layer with asphalt mixes, and then laying the upper pavement layer with 3.5 cm AC 8 grade asphalt bumps. securing the installation of the yard terbetonrenovation of paving with asphalt, stone, 799 m2 New yards with stone. The yard feldspar with concrete slabs of rock slabs with concrete pavement and pavement nailed to kesuela, at 925.07 m2 o yard benches 16, littered 4 pcs, placement of roundparts 47 "wheeled tamasz, valas benches and trash cans. Type of bench pads: tamla nelkueli pad / 150 cm x 45 cm / paddle scraper: moss zoeld color Round part: galvanized steel "P" round part The rectangular square meter figures refer to the gross floor area. v. technical documentation, design documentation, vas well as the pristine cowhide. The offeror must take into consideration the contents of the Technical Specification "Co-Procurement Supplemental Epithet Technical Supplement."These implementation activities include non-licensed refurbishment work.
In all respects: The procedure may not be proprietary, reciprocal, subcontractor, or certified as an economic entity to which the Kbt is subject. - 62 (1) and (2) are any exclusive grounds. (X.30.) Korm. R. Section 21(1) of the Kbt. Section 65 para. contractor, or in the case of economic operators not established in Hungary, if required for the performance of the contract, Certification Module (for all applications):
As an advisor, the Kbt. (1) of Section 67 and Section 321/2015. (X.30.) Government Decrees 1-4. Of the Single European Koezby a statement contained in an author`s document, Kbt. In the case of a call in accordance with Article 69 (4), the tenderer (s) and the sub-contractor (s) established in Hungary and, where appropriate, the economic operator (s) accredited in the appropriate certificate (X.30.) On. 8) of the Decree, the subcontractor (s) not established in Hungary and, where appropriate, thein respect of the economic operator (s) purchasing the assagi certificate in accordance with Article 321/2015. (X.30.) On. of the Government Decree, with regard to Articles 4, 6 and 12-16 of the Government Decree. Of the Sections shall also justify the non-exclusive grounds for exclusion. The Kbt. Having regard to the provisions of Article 67 para. Section 62sub-contracting under exclusive power. 321/2015 in relation to business cards for construction contractors in accordance with Section 321/2015. (X.30.) On.
Continued from point III.2.2):
Upon successful completion of the 100% performance requirement, there is a possibility to enter the invoice on the basis of a technical inspection certificate.jtasara. References 1-3. files are based on EFOP-4.1.2-17-2017-00087; The grant intensity is 100% of the eligible project costs. The financial turmoil is utofinirirose. Proof of performance is provided by Kbt. Section 135 (1) - (2) of the Act provides for the provisions of law. A. The contractor is the contractor(322/2015. (X. 30.) Article 31). - 135 and Decree 322/2015. (X.30.) Korm. R. 30. - es 32 / A-32 / B.
The Contractor shall, if the Contractor uses a subcontractor for performance, be subject to the provisions of the Civil Code. 6: 130th - (1) - Paragraph 2 of the Kbt. 135 (3) of the Act on the basis of Article 322/2015. (X.30.) Government Decree 32 / A. i 32 / B. Pay the contractual consideration in accordance with Articles 1-3. file passes can be done without permission, so the general AFA rules are strenuous. With regard to file 4, the activity of epithetics, such as the so-called. the hell of reverse AFA rules
The time reserve reserve was not overcharged
Paying currency: HUF (Forint)
The winner is charged by the commissioner at your disposal. This is 5% of the contracted general sales tax. Your commissioners are the Kbt. Any of the mods in accordance with Section 134 (6) (a) may be executed.The customer is entitled to a daily coetter of 0.5% of the net entrepreneurial rate. The maximum rate of interest for net interest is 10%, ie 20 days per service. agreementlitz wires.
1st In the process, you have to review the quotes from the commissioners in file 4. The number of time-honored insurance agents $ 2, 000 Paying-time account: Hungarian Allamkincstar: 10026005-00336523-30005204
The payment of the insurance commissioners is a proof of payment:
The term of service shall include the amount of the overdue (deposit) payment on the indicated payment account, the guarantee of the penzuegytezte or insurer, or the collateral of the insured, or the collateral of the insured under the insurance contract. The Kbt. 41 / A. - (2) provides that a statement which koezvetlenuel somethingTo serve as the basis for prior certification (such as a disclaimer of warranties or a disclaimer of warranties), you must comply with the requirements of a fully-fledged private record of civil records under the Civil Code. When depositing or withdrawing money, it shall be indicated in the Co-operative Book that "EFOP-4.1.2. Item 4 Losing Offerors "In the case of a payout, the payer must wait at least by the deadline for submission of the quotes. In the event of a cash withdrawal, the time limit for submitting the bid must be reached on the business day preceding the closing of the quotation. In the case of a deposit, a proof of payment must be attached to the offer. In the case of cash withdrawal, a proof of bank transfer receipt must be attachedDeals.
2nd Benchmarking triggers the procedure to be conditionally triggered in all respects. Terms and conditions:
2.1. The Kbt. On the basis of - 53 (6), the Buyer shall consider the benefit to the support parent and the acceptance of, or lesser acceptance of, the support as a test of success, which renders the proceeding ineffectivedon`t disclose it. The Kbt. Based on Article 135 (12), the condition is also a condition of the contracting authority to be imposed. Pursuant to Article 53 (6), a timeframe for filing a notice of variation within the deadline for modifying the project, as amended by the Togolese Treaty, has been made available. The deadline for modifying the deadline will not be accepted or will be lower than the requestedtime acceptance, which has a decisive influence on the execution time, is seen as a test of success, which could render the procedure ineffective. The Kbt. Pursuant to Article 135 (12), this condition is also a condition that is to be imposed on the contractual power of attorney. The duration specified in Section IV.2.6. Section 81 (11) is based on 60 days. A lot of suggestionsThe evaluation of the content elements according to these aspects can be given in a row: 0-10 points, which is the same for all aspects. In the case of a one-shot net offer price criterion, the Koezmerzheimer Announcement on the Application of the Winning Criteria for the Selection of the Winning Contractor, dated 22nd November, 2019, will be published. utmutatoja (`Utmutato`), No 1 Reverse line for gold reverse translation according to point 1 (aa). The duration of the promotion and the professional experience of the specialist are described in Appendix 1 of the Guide. Attachment A line for a straight line as described in point 1 (b). The minimum is 36 months. The Kbt. Based on Article 77 (1), the maximum indicated by the bureaucratic model and the more favorable returnI also get the maximum points for the offerers and the maximum substitute for the keruel even if there is a more favorable offer.
Internet address (URL): https://kk.gov.hu/gyula