?????? ???????? has floated a tender for Contract notice: Construction work. The project location is Bulgaria and the tender is closing on 22 Mar 2019. The tender notice number is 075886-2019, while the TOT Ref Number is 30784575. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Bulgaria

Summary : Contract notice: Construction work

Deadline : 22 Mar 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 30784575

Document Ref. No. : 075886-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ?????? ????????
Office Name: ?????? ????????
Address: ??. ????? ? 39
Town: Provadiya
Postal Code: 9200
Contact Point: ??????? ????????

Phone: +359 51842702
Fax: +359 51842164
Bulgaria
Email :b_stoycheva@provadia.bg
URL :www.provadia.bg

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45233161, 45000000, 45233161
CPV Description: Construction work.

Footpath construction work

Reconstruction of pavements in the villages of Bozveliysko, Venchan, Dobrina, Petrov Dol and Tutrakantsi, Provadia municipality

Reference Number: 2019 - OP - 5

The following types of construction and assembly works : laying of pavement concrete pavements 40/40/5 about 710 square meters, including demountable pavement, concrete and asphalttiles, thin trench for leveling and sanding up to 10 cm, paving with new 40/40/5 concrete slabs, 1: 1 cement mortar grouting and loading and transport of construction waste. Bozveliysko, Provadia municipality, Varna district

Within the detached part are envisaged a major repair of about 150 square meters of pavements, including dismantlingpavement, concrete and asphalt pavement, thin trench for alignment, sanding and sanding up to 10 cm, paving with new 40/40/5 cm concrete slabs, grouting 1: 1 cement mortar and loading and transport of construction waste. The above mentioned works will be carried out on the territory of Bozveliysko village, Provadia municipality. The indicated amounts are indicative and are subject to measurementThe contracting authority requires the participants to be entered in the Central Professional Register of Constructors as follows: - for the first lot - the participants shall be entered in the TSPR for execution of constructions with the following scope: construction works on sites min. group, third category - constructions from the transport infrastructure, according to Ordinance № 1 of 30.07.2003year for the nomenclature of types of construction and Art. 137 of the Law for the structure, - for the second lot - the participants shall be entered in the TSF for execution of constructions with the following scope: construction works on sites minimum second group, third category - constructions from the transport infrastructure, according to Ordinance No. 1 of 30.7. 2003 for the Nomenclature of Construction Types and Art. 137 of the Lawand for the device, - for the third lot - the participants are entered in the TSPR for execution of constructions with the following scope: construction works by objects minimum second group, third category - constructions from the transport infrastructure, according to Ordinance № 1 of 30.07.2003 for the nomenclature of types of construction and Art. 137 of the Device Act, - for the fourth lot - the participantsto be entered in the CPSA for execution of constructions with the following scope: construction works by sites minimum second group, third category - constructions from the transport infrastructure, according to Ordinance № 1 of 30.7.2003 on the nomenclature of types of construction and art. 137 of the Act on the Structure, - for the fifth lot - the participants to be entered in the TSPR for execution of constructions with the following scopet: construction works by object, minimum group 2, third category - constructions from the transport infrastructure, according to Ordinance № 1 of 30.07.2003 on the nomenclature of the types of construction and art. 137 of the Device Act. 60 of the Public Procurement Act, foreign participants can prove their registration in analogous registers according to the legislation of the stateIn the case of a grouping which is not a legal person, the requirement for registration shall be demonstrated by each participant in the grouping who will carry out the works, according to the distribution of the participation of the persons in the performance of the activities provided for in the contract creation of the grouping - In the case of subcontracting, the same should meet the above mentioned requirementsaccording to the type and the share of the order they will perform

The participants declare their compliance with the selection criterion in the EEDOP

The requirement applies to each lot  The assignor requires the participants to hold a valid professional liability insurance with cover, corresponding to the volume and nature of the contract, namely in the construction industry within the meaning ofArt. 137 of the Spatial Development Act for construction works of minimum category 3.

In the case of a grouping which is not a legal entity, the compliance with the selection criterion shall be proved by each participant in the grouping that will execute the construction according to the distribution of the participation of the persons in the implementation of the activities, provided by the contract for the formation of the grouping.

In case of subcontracting, the same should be done• For foreign participants - have professional liability insurance for construction or guarantee in another Member State of the European Union or in a country to the Agreement on the European Economic Area, with a threshold of not more than less than the minimum insurance sums for construction for the corresponding The participants declare their compliance with the selection criterion in EEDOP - the requirement applies to each lot. ... Continue. III.2.2) Conditions for execution of the contract: The contract for a general procurement will be conditional on a postponement clause until the contractor receives notification that funding has been provided for andfulfillment of the order and signing of protocol № 2 under Ordinance № 3/2003. After expiration of 3 months. from the date of signing the contract, provided that no funding is provided, the parties have the rights under Art. 144 of the PPA, each of which may request the termination of the contract without notice. For each individual lot, the participants present the following documents for participation in the proceedingsDura:

1. Application form including:

1.1. EEDOP

1.2. Documents to demonstrate the reliability measures taken (if necessary)

1.3. For participants unions that are not Jur. a copy of a document showing the grounds for the formation of the unification, as well as the rights and obligations of the members of the grouping, including the designated partner, which will representand the unification for the purposes of this general. order; the division of responsibility between the members of the grouping; a clause of joint and several liability of the members of the consortium for the performance of the public procurement contract and the activities to be performed by each member of the grouping. The offer contains:

2.1. Authorization document when the person submitting the bid is not the legal representativeparticipant's pocket.

2.2. Proposal for the execution of the order in accordance with the tech. the specification and the requirements of the contracting authority and a program for the organization and execution of the contract (obligatory and electronically in the format "* .doc") attached to it and a schedule for the implementation of the envisaged activities in the respective lot. Quotation proposal with quantitative-value account and analyzes of unit prices in the respective volume. position.

ІІІ. A participant shall be removed from participation in the procedure, in which the circumstances under Art. 54, para. 1 and under Art. 55, para. 1, item 1 of the Public Procurement Act. The Contracting Authority will remove from participation in the procedure and: - Participants - related parties within the meaning of -2, item 45 of the PP of the Public Procurement Act, - a participant who has offered a price for the fulfillment of the order underhigher than the forecast determined by the assignor. value of the order,

- a participant who has submitted a tech. a proposal that does not meet the requirements of Tech. specification and terms of the contract,

- a participant, for whom the circumstances under Art. 3, item 8 in connection with Art. 4 and Art. 5, para. 1, item 3 of ЗИФОДЮПДРКЛТСС, - a participant who, after a call from the contracting authority and within the term set by him, does notextend the validity of your offer.

IV. According to Art. 67, para. 1 of the PPL when submitting the tender, the participant declares lack of grounds for removal from the procedure and compliance with the selection criteria by submitting EEDOP. Documents demonstrating the information specified in EEDOP may be required additionally under the conditions of Art. 67, para. 5 and para. 6 of the Public Procurement Act. According toArt. 67, para. 6 of the Public Procurement Act, prior to the award of a public procurement contract, the participant designated as a contractor shall present up-to-date documents certifying the lack of grounds for removal from the procedure and compliance with the selection criteria. Documents shall also be submitted to subcontractors and third parties, if any. Participants can obtain information about obligationscompliance with environmental protection measures, protection of employment and working conditions in force in the country by the NRA, MoEW, Employment Agency and the General Labor Inspectorate. In preparing the offer, participants should comply with the following maximum limits for the formation of economies. indicators:

- hourly rate - up to BGN 4.50 / hour,

- additional.costs on FAO - up to 100%

- additional costs on machinery - up to 40%

- delivery and storage costs for materials - up to 8%

- profit - up to 8%